First reported 2 Dec 2013•Latest report 11 Dec 2025
Definition
What this concern includes
Includes failures or hazards in road-junction layouts and dedicated safety controls where recurring collisions or serious collision risk indicate that the junction is not reliably made safe, including layout, signage, markings, speed or other junction-specific mitigation measures.
Not included
Excludes generic road-safety, highway-maintenance or collision concerns without a material road-junction safety condition.
Excludes failures limited to a specific road-marking, signage or inspection process where junction safety is not the shared unsafe condition.
Excludes pedestrian-crossing, railway, vehicle-design and non-junction hazards unless the assertion directly concerns safety of the road junction.
Excludes a single isolated collision or factual hazard where no continuing deficiency or recurring collision risk is identified.
Reports
55
Distinct published reports
Individual concerns
85
A report can raise multiple concerns
Date range
2013–2025
First to latest report issue date
Stated actions
126
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
National Highways8
Department for Transport6
Office of the Chief Coroner4
Transport for London4
Lincolnshire County Council3
Recipient name withheld3
A-One+2
Apple (UK) Limited2
Birmingham City Council2
Google UK Limited2
Leicester City Council2
Nottinghamshire County Council2
Slough Borough Council2
TomTom2
Wiltshire Council2
English unitary authority16
English county council14
English metropolitan district council8
National road infrastructure body8
Ministerial department6
Type not available5
Company4
Coronial office4
Police force4
Public transport authority4
London borough council3
Welsh county borough council3
Private limited company2
Sub-organisation2
Executive non-departmental public body1
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
Nottinghamshire
Concerns raised3
Inadequate visibility of oncoming traffic for vehicles waiting or turning at the junction
Risk of shunt-type collisions for vehicles waiting to turn right
Road layout requiring a sharp-angled right turn into Home Farm
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
Action
Develop alternative junction measures, including revisions to the central traffic island and associated road markings, if closure is not pursued.
Stated by Nottinghamshire County CouncilStated in progressThe respondent said that this action was in progress when they made their response on 8 June 2018.
Action
Assess permanent closure of the Home Farm access and consult affected parties.
Stated by Nottinghamshire County CouncilStated in progressThe respondent said that this action was in progress when they made their response on 8 June 2018.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
Permanent closure of the Home Farm access may not be possible without specific Secretary of State authorisation if objections are received.
Stated by Nottinghamshire County CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Wiltshire and Swindon
Concerns raised1
Lack of safe visibility and crossing conditions for pedestrians at the junction
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
Action
Analyze signal operation and traffic levels, assess alternatives, and develop preliminary technology and civil-engineering designs for pedestrian signal phases.
Stated by Swindon Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 25 September 2017.
Action
Prepare and obtain approval for a briefing recommending further investigation and stakeholder and public consultation on the proposed pedestrian signal scheme.
Stated by Swindon Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 25 September 2017.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
The junction’s constrained sight lines and pavement space make alternative pedestrian safety options undeliverable or less beneficial than the proposed approach.
Stated by Swindon Borough CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Cumbria
Concerns raised2
Failure to implement identified highway safety measures
Inadequate warning signage on the north-westerly approach to the junction
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
Action
Allocate funding to implement the collision study’s safety recommendations in 2017/18.
Stated by Cumbria County CouncilStated completedThe respondent said that this action was complete when they made their response on 1 October 2017.
Action
Consult the police, Parish Council and County Councillor on proposed high-friction surfacing, road-marking and signage improvements.
Stated by Cumbria County CouncilStated in progressThe respondent said that this action was in progress when they made their response on 1 October 2017.
Action
Hold a further police site visit after installing the measures to identify necessary amendments or further improvements.
Stated by Cumbria County CouncilStated plannedThe respondent said that this action was planned when they made their response on 1 October 2017.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
The recommendations were not delayed by insufficient resources; funding had already been allocated for 2016/17 and the following year.
Stated by Cumbria County CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Berkshire
Concerns raised1
Restricted visibility at the Highmoor Road and Albert Road junction
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
The collision evidence indicates driver failure to stop, not the stop-line position; after stopping, drivers must edge forward to gain visibility.
Stated by Reading Borough CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Manchester West
Concerns raised1
Restricted driver visibility of pedestrians at the junction
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Action
Review collision CCTV, inquest witness statements and the junction through a multi-agency site visit.
Stated by Bolton Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 5 March 2017.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
Position
The reconstruction works cannot be extended to the crossing area because that area is outside the current site investigation scope.
Stated by Bolton Borough CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Relocating the pedestrian crossing would not improve visibility because the building line would continue to obstruct motorists’ line of sight.
Stated by Bolton Borough CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Avon
Concerns raised2
Inadequate road signs warning drivers of the risk from the junction
Repeated road traffic collisions at the junction involving drivers emerging onto the A36
This report raised 3 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Action
Implement visibility and signing measures at the Branch Road junction, including warning signs, road markings, red surfacing, direction signs and vegetation clearance.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 5 March 2017.
Inner South London
Concerns raised2
Junction design permitting left-turning traffic from Lane 2 to cross straight-ahead traffic
Failure of junction information to warn cyclists of vehicles turning across the bus lane
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.7
Action
Progress the Camberwell Green junction safety scheme, including cyclist and pedestrian safety measures, through consultation, design updates and final road safety audit.
Stated by Transport for LondonStated in progressThe respondent said that this action was in progress when they made their response on 5 March 2017.
Action
Install left-turn and through-lane arrows between bus stop Q and the existing pelican-crossing zig-zag lines.
Stated by London Borough of SouthwarkStated completedThe respondent said that this action was complete when they made their response on 5 March 2017.
Action
Install durable left-turn and through-lane arrows between the relocated bus stop Q and the pelican-crossing zig-zag lines.
Stated by London Borough of SouthwarkStated plannedThe respondent said that this action was planned when they made their response on 5 March 2017.
Action
Install an advisory sign specifying left-turn-only movement except buses in the nearside lane and through movement only in the offside lane.
Stated by London Borough of SouthwarkStated plannedThe respondent said that this action was planned when they made their response on 5 March 2017.
Action
Install raised entry treatment at the Orpheus Street–Denmark Hill junction to encourage vehicles to slow when turning.
Stated by London Borough of SouthwarkStated plannedThe respondent said that this action was planned when they made their response on 5 March 2017.
Action
Paint cycle symbols at the Denmark Hill–Orpheus Street junction to highlight cyclists in the nearside lane.
Stated by London Borough of SouthwarkStated completedThe respondent said that this action was complete when they made their response on 5 March 2017.
Action
Install durable cycle-symbol markings near the Denmark Hill–Orpheus Street junction to highlight cyclists in the nearside lane.
Stated by London Borough of SouthwarkStated plannedThe respondent said that this action was planned when they made their response on 5 March 2017.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
Position
Changes affecting the Strategic Route Network require TfL approval and cannot be implemented unilaterally.
Stated by London Borough of SouthwarkRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
The proposed interim sign could not be installed because no suitable location existed given the bus stops and pelican crossing.
Stated by London Borough of SouthwarkUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
North Yorkshire (West)
Concerns raised1
Restricted visibility of traffic at the junction
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Central Lincolnshire
Concerns raised1
Hazardous junction for vehicles turning across southbound traffic
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
Action
Complete a highway safety investigation of collisions between Toll Bar Road and Gonerby Moor to identify cost-effective remedial measures.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 24 October 2016.
Action
Submit any remedial actions identified by the investigation in a funding bid.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 24 October 2016.
Action
Complete a highway investigation following the fatal collision at the A1 and Toll Bar Road junction.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 24 October 2016.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
Position
The initial investigation found no apparent highway-related factors contributing to the collision.
Stated by National HighwaysDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
The Toll Bar Road junction is likely not among the network’s 50 junctions with the most personal injury collisions.
Stated by National HighwaysDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Nottinghamshire
Concerns raised2
Repeated fatal collisions at the junction involving vehicles emerging from Station Road
60mph speed limit on the Station Road approach to the junction for unfamiliar drivers
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Action
Clear vegetation around the Station Road junction to improve visibility in all directions.
Stated by Nottinghamshire PoliceStated completedThe respondent said that this action was complete when they made their response on 13 May 2016.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.9
Position
Investigating accidents on the A46 falls outside the Council’s responsibility because it is a trunk road.
Stated by Nottinghamshire County CouncilOutside remitThe respondent said that this matter was outside its role or authority.
Position
Highways England is responsible for investigating accidents and developing safety measures on the A46.
Stated by Nottinghamshire County CouncilRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Side-road approach measures are not usually effective for restart accidents; main-road measures are considered more appropriate.
Stated by Nottinghamshire County CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
No speed-limit change was considered necessary because vehicles entered the junction at very low speeds or were stationary.
Stated by Nottinghamshire PoliceNo action considered necessaryThe respondent said that no further action was needed.
Position
Implementation of the accident remedial scheme was assigned to Highways England as the responsible highway authority.
Stated by Nottinghamshire PoliceRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Delivery of the junction improvement scheme was constrained by the lack of available funding and the need for investment approval.
Stated by Nottinghamshire PoliceUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
There is no evidence that excessive approach speed contributes significantly to these accidents, and lowering the speed limit would be ineffective.
Stated by Nottinghamshire County CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
A lower speed limit is not considered appropriate because legal procedures, implementation costs and delay could outweigh its arguable benefits.
Stated by Nottinghamshire County CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Nottinghamshire County Council is solely responsible for safety concerns concerning the Station Road approach to the A46 junction.
Stated by A-One+Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.