Recurring concern
Inadequate and unreliable public-road street lighting
First reported 24 Feb 2014•Latest report 1 Dec 2025
What this concern includes
Includes deficiencies in the provision, functioning, inspection, maintenance, repair or unobstructed performance of street lighting serving public roads, crossings, junctions, bus stops or comparable roadside pedestrian areas.
Not included
- Excludes warning signs, traffic signs, crossings, barriers, speed limits and other road-safety controls unless the assertion specifically concerns street-lighting performance.
- Excludes lighting systems unrelated to public roads, such as prison, residential, workplace or fire-detection lighting.
- Excludes generic visibility, road-design or environmental hazards that do not identify a deficiency in the street-lighting system.
- Reports
- 34
- Individual concerns
- 38
- Date range
- 2014–2025
- Stated actions
- 28
Distinct published reports
A report can raise multiple concerns
First to latest report issue date
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
-
Concerns raised1
Inadequate street lighting near St Edwards Church
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
-
Concerns raised1
Lack of street lighting on the road
This report raised 3 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Carry out a feasibility study for a separated footpath between Walsingham Drive and Sutherland Drive, including costs, benefits, speed limits and lighting.
Stated by Warwickshire County Council
-
Concerns raised1
Inadequate lighting and visibility at the pedestrian crossing
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Existing lighting and signing meet current standards, so no immediate action is required.
Stated by National Highways
-
Concerns raised1
Failure of the road lighting system to operate during hours of darkness
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
Data last updated 7 September 2026