What this concern includes
Includes failures of dedicated controls intended to prevent or restrict public access to hazardous or officially closed sites, including fencing, gates, locks, barriers, security arrangements, access monitoring and timely implementation of closure measures where the site is not intended for public access.
What is not included
Excludes ordinary public access to sites that are open and intended for public use, even where general safety measures are needed.
Excludes the underlying drowning, fall, electrical or other site hazard when no failure to control public access is identified.
Excludes general site-security or perimeter-maintenance deficiencies without a hazardous or restricted-site public-access context.
Excludes failures limited to warning information, route guidance or signage where access prevention or restriction is not the shared unsafe condition.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Network Rail6
National Highways2
Borough Council of King's Lynn and West Norfolk1
British Transport Police1
Canal & River Trust1
Cornwall Council1
Durham County Council1
Foresight Group1
High Commission of Saint Lucia in the United Kingdom1
London North Eastern Railway Limited1
Luton Borough Council1
Norfolk Constabulary1
Norfolk County Council1
Porthleven Harbour & Dock Company1
Recipient name withheld1
Rail infrastructure manager6
English unitary authority3
Private limited company3
National road infrastructure body2
Type not available2
Company1
English county council1
English district council1
English metropolitan district council1
Inland waterway body1
Other public body1
Police force1
Port operator1
Special police force1
Train operating company1
Reports and published responses 16 reports
See individual reports that have raised this concern, and the actions taken in response
Cumbria
Concerns raised1
Failure to prevent access to the railway line through adequately secure fencing
Linked response
Network Rail
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
Network Rail
Install additional meshing and netting at the location to deter climbing.
Network Rail
Review trespass risk around the area and identify the bridge wing wall and track-level safety rail for further mitigation.
Network Rail
Investigate whether attaching mesh to the bridge’s tubular handrail or safety rail would improve security.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.3
Network Rail
The line speed at this location is 110mph, not 125mph, although trains still travel at high speed.
Disputes the concernThe respondent disagreed with part of the concern or the basis for it.
Network Rail
Current boundary measures meet the reasonably practicable obligation, and no further assessment is triggered because there is no prior evidence of trespass.
Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Network Rail
Replacing all fencing with palisade is not reasonably practicable given the scale of the railway network and local risk assessment requirements.
Unable to actThe respondent said that a constraint prevented them from taking the relevant action.
North East Kent
Concerns raised1
Failure to prevent public access to live rails at ground level
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Linked response
Network Rail
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
Network Rail
Continue developing reasonably practicable safety solutions for the ground-level conductor rail system.
Network Rail
Install platform-end gates and anti-trespass measures at more than 50 South East route stations, with works already completed at 30 locations.
Network Rail
Improve fencing at higher-risk locations through a programme including £800,000 of work due for completion by April 2019.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Network Rail
Converting or replacing the ground-level conductor rail is not reasonably practicable because of the railway system’s complexity and cost.
Unable to actThe respondent said that a constraint prevented them from taking the relevant action.
Bedfordshire and Luton
Concerns raised1
Inadequate deterrence and hindrance provided by railway access gates and fencing
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Linked response
Network Rail Infrastructure Limited
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Network Rail Infrastructure Limited
Deliver over 600 metres of fencing and upgrade nearby gates to deter unauthorised railway access.
Manchester West
Concerns raised1
Inadequate restriction of public access to the railway track from the steps accessing footbridge 57
Linked response
Network Rail Infrastructure Limited
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
Network Rail Infrastructure Limited
Install shorter palisade pales on the lower flight to connect with the boundary fence and raise the parapet to at least two metres.
Network Rail Infrastructure Limited
Raise the upper-flight stepped parapet with engineering brick and bullnose units to prevent scaling and access behind the lower-flight palisade.
West Yorkshire Eastern
Concerns raised1
Lack of measures preventing public access to the disused railway bridge
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Norfolk
Concerns raised1
Failure to prevent public access to the officially closed site
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.