First reported 5 Aug 2013•Latest report 8 Jun 2026
Definition
What this concern includes
Includes crossing provision, siting, visibility, signals, markings, refuge, warnings and speed controls when the source ties them directly to pedestrian crossing safety.
Not included
General pedestrian-and-vehicle separation away from a crossing
Road hazards that do not concern pedestrian crossing safety
Reports
71
Distinct published reports
Individual concerns
113
A report can raise multiple concerns
Date range
2013–2026
First to latest report issue date
Stated actions
136
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
National Highways11
Department for Transport6
Transport for London6
Network Rail5
Staffordshire County Council5
Birmingham City Council3
Recipient name withheld3
Bournemouth, Christchurch and Poole Council2
Durham County Council2
Hampshire County Council2
Leeds City Council2
Nottinghamshire County Council2
Office of Rail and Road2
Sandwell Borough Council2
Surrey County Council2
English county council18
English metropolitan district council15
English unitary authority12
National road infrastructure body11
London borough council7
Ministerial department6
Public transport authority6
Rail infrastructure manager5
Type not available4
Private limited company3
Sub-organisation3
Public limited company2
Transport regulator2
Airport operator1
Coach operator1
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
North London
Concerns raised4
Absence of pedestrian control buttons to bring both lanes to red
Lack of clear pedestrian visibility of the green filter light
Absence of pedestrian crossing indications or warning sound
Absence of a second set of traffic lights visible to pedestrians beyond the lights
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
Action
Commission a feasibility study of introducing a dedicated pedestrian phase at the junction.
Stated by London Borough of HarrowStated completedThe respondent said that this action was complete when they made their response on 5 August 2013.
Action
Install new signal equipment and link nearby traffic signals through SCOOT to improve traffic flow and capacity.
Stated by London Borough of HarrowStated completedThe respondent said that this action was complete when they made their response on 5 August 2013.
Action
Review whether introducing a dedicated pedestrian phase at the junction is feasible and acceptable to TfL.
Stated by London Borough of HarrowStated plannedThe respondent said that this action was planned when they made their response on 5 August 2013.
Action
Continue engaging TfL to pursue pedestrian safety improvements, including reviewing the removal of the secondary signal.
Stated by London Borough of HarrowStated in progressThe respondent said that this action was in progress when they made their response on 5 August 2013.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
A dedicated pedestrian phase could not be taken forward because TfL would not support the resulting traffic delays and congestion risks.
Stated by London Borough of HarrowUnable to actThe respondent said that a constraint prevented them from taking the relevant action.