Recurring concern
Inadequate control and visibility of hazardous kerb edges
First reported 3 Mar 2016•Latest report 30 Apr 2025
What this concern includes
Includes physical defects, unclear transitions and inadequate visibility or warning measures at kerb edges where the condition can affect road users, including cyclists, pedestrians or approaching motorists.
Not included
- Excludes general road-design, road-surface, junction, signage or visibility deficiencies where a hazardous kerb edge is not the material unsafe condition.
- Excludes ordinary kerb maintenance or accessibility issues without a supported road-user safety consequence.
- Excludes generic pedestrian, cyclist or vehicle-control concerns that do not identify a deficient or hazardous kerb edge.
- Excludes hazards at platform, building or other non-road edges unless the assertion concerns the same road-user kerb-edge safety condition.
- Reports
- 4
- Individual concerns
- 4
- Date range
- 2016–2025
- Stated actions
- 2
Distinct published reports
A report can raise multiple concerns
First to latest report issue date
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
-
Concerns raised1
Failure to prevent vehicles from entering the canal at the end of the road
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Install reflective bollards along the canal bank to provide a clearer visual indication of the road end.
Stated by West Sussex County Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Existing kerb height provides sufficient physical and audible warning; raising it is not considered necessary and would cause visual intrusion.
Stated by West Sussex County Council
-
Concerns raised1
Inadequate measures highlighting the commencement of the kerb to oncoming motorists
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Existing edge and centre-line markings comply with applicable requirements and direct drivers away from the kerb transition.
Stated by Kirklees Borough Council
-
Concerns raised1
Dip in the kerb edge
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Re-kerb the affected length to provide a consistently higher kerb edge.
Stated by Mike Suarez
-
Concerns raised1
Use of chamfered kerb stones on the carriageway
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
The existing splayed kerb is appropriate for a dual carriageway because it allows vehicles to leave the carriageway during emergencies.
Stated by Stockport Borough Council
Data last updated 7 September 2026