Recurring concern
Inadequate visibility for road users at hazardous junctions
First reported 2 Jul 2014•Latest report 9 Apr 2025
What this concern includes
Includes failures or hazards that materially restrict the visibility needed by drivers, cyclists or pedestrians approaching, entering or negotiating a hazardous road junction, including obstruction by vegetation, fencing, parked or moving vehicles, glare or comparable junction-specific conditions, together with dedicated measures intended to restore or protect that visibility.
Not included
- Excludes general road-junction design, collision, signage, marking, lighting or speed-control deficiencies where restricted visibility is not the shared unsafe condition.
- Excludes ordinary vehicle forward-visibility, driver competence and weather-related visibility problems that are not specifically tied to visibility at a hazardous junction.
- Excludes pedestrian crossings, cycle routes and roadside-obstacle concerns where junction visibility is not the material safety condition.
- Excludes failures occurring after road users have had adequate visibility and the remaining issue is response, treatment or enforcement.
- Reports
- 23
- Individual concerns
- 24
- Date range
- 2014–2025
- Stated actions
- 24
Distinct published reports
A report can raise multiple concerns
First to latest report issue date
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
-
Concerns raised1
Unsafe layout or line of sight on the approach to the junction
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
-
Action
Separate the secondary traffic signal heads and add guidance markings to direct drivers safely through the junction.
Stated by Slough Borough Council -
Action
Complete an independent junction safety review, including collision-data assessment, and provide a report with proposals for further improvements.
Stated by Slough Borough Council
-
Concerns raised1
Impaired junction visibility from vehicles waiting to turn
This report raised 3 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
-
Concerns raised1
Compromised visibility at the junction
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Convert both junction approaches from Give Way to Stop controls through an identical scheme.
Stated by Northamptonshire County Council
-
Concerns raised1
Inadequate visibility of oncoming traffic for vehicles waiting or turning at the junction
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Develop alternative junction measures, including revisions to the central traffic island and associated road markings, if closure is not pursued.
Stated by Nottinghamshire County Council
-
Concerns raised1
Lack of safe visibility and crossing conditions for pedestrians at the junction
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
-
Action
Analyze signal operation and traffic levels, assess alternatives, and develop preliminary technology and civil-engineering designs for pedestrian signal phases.
Stated by Swindon Borough Council -
Action
Prepare and obtain approval for a briefing recommending further investigation and stakeholder and public consultation on the proposed pedestrian signal scheme.
Stated by Swindon Borough Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
The junction’s constrained sight lines and pavement space make alternative pedestrian safety options undeliverable or less beneficial than the proposed approach.
Stated by Swindon Borough Council
-
Concerns raised1
Restricted visibility at the Highmoor Road and Albert Road junction
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
The collision evidence indicates driver failure to stop, not the stop-line position; after stopping, drivers must edge forward to gain visibility.
Stated by Reading Borough Council
-
Concerns raised1
Restricted driver visibility of pedestrians at the junction
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Review collision CCTV, inquest witness statements and the junction through a multi-agency site visit.
Stated by Bolton Borough Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
-
Position
The reconstruction works cannot be extended to the crossing area because that area is outside the current site investigation scope.
Stated by Bolton Borough Council
-
Position
Relocating the pedestrian crossing would not improve visibility because the building line would continue to obstruct motorists’ line of sight.
Stated by Bolton Borough Council
-
Concerns raised1
Restricted visibility of traffic at the junction
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
-
Concerns raised2
Failure to regularly cut back plant growth at road junctions
Plant growth severely restricting drivers’ view at a junction
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.5
-
Action
Clear vegetation at the A505 Slip End Farm junction within the central reserve safety barrier.
Stated by Hertfordshire County Council -
Action
Assess similar junctions between Baldock and Royston to identify locations requiring additional vegetation clearance.
Stated by Hertfordshire County Council -
Action
Clear vegetation at six identified junctions between Baldock and Royston beyond cyclical grass-cutting maintenance.
Stated by Hertfordshire County Council
-
Action
Revise highway safety inspectors’ remit to identify vegetation requiring corrective action on this length of road.
Stated by Hertfordshire County Council -
Action
Revise the vegetation maintenance regime so tree, shrub and plant-growth cutting is coordinated annually with grass cutting on this length of road.
Stated by Hertfordshire County Council
-
Concerns raised1
Failure to maintain clear visibility into and approaching the junction
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
-
Position
Visibility at the junction exceeded applicable national guidance, so restricted sight lines were not considered the cause of delayed evasive action.
Stated by Leicestershire County Council
-
Position
Hedgerow-cutting enforcement was considered unnecessary because the hedgerows were already situated a safe distance from the carriageway.
Stated by Leicestershire County Council
Data last updated 7 September 2026