First reported 22 Sep 2014•Latest report 16 Apr 2025
Definition
What this concern includes
Includes recurring hazards or deficient physical, directional, separation, signage or other dedicated road controls at slip-road and carriageway interfaces where they permit or fail to prevent wrong-way entry, unintended crossing or other dangerous vehicle movement between traffic routes.
Not included
Excludes generic road collisions, junction hazards or driver error where no specific slip-road or carriageway-interface control failure is identified.
Excludes ordinary road-marking, signage, lighting or barrier deficiencies that are not materially connected to preventing dangerous vehicle movements between slip roads and carriageways.
Excludes road hazards confined to pedestrians, vehicle loss of control, road-surface conditions or unrelated highway maintenance.
Excludes routine vehicle approval, driver licensing or enforcement concerns unless they directly concern controlling dangerous movements at a slip-road or carriageway interface.
Reports
4
Distinct published reports
Individual concerns
9
A report can raise multiple concerns
Date range
2014–2025
First to latest report issue date
Stated actions
29
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
National Highways3
Apple (UK) Limited2
Google UK Limited2
Office of the Chief Coroner2
TomTom2
A-One+1
Cleveland Police1
Kent Police1
Milton Keynes City Council1
Recipient name withheld1
Company3
National road infrastructure body3
Coronial office2
Police force2
Private limited company2
English unitary authority1
Type not available1
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
North West Kent
Concerns raised1
Lack of physical barriers on the grass verge between the M20 and M25/M20 slip road
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Action
Assess the barrier provision against current road restraint requirements using the Road Restraint Risk Assessment Process.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 19 May 2025.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
Position
The merge arrangements do not constitute a barrier-requiring hazard because traffic travels in the same direction.
Stated by National HighwaysDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
No further action or direct CD 377 amendment is intended because similar incidents are uncommon and changes must address safety and value for money.
Stated by National HighwaysNo action considered necessaryThe respondent said that no further action was needed.
Milton Keynes
Concerns raised5
Inadequate positioning and visibility of No Entry signage for wrong-way slip-road entry
Frequent wrong-way driving down the slip road into oncoming traffic
Slip-road geometry allowing wrong-way vehicles to enter and build up considerable speed
Failure to maintain adequate visibility of road-surface No Entry markings at the slip-road junction
Failure of commonly used satnav applications to provide unambiguous verbal directions at the junction
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.11
Action
Install temporary large No Entry signs on A-frames at both sides of the A5 off-slip exit.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 29 December 2023.
Action
Complete a full safety review of the junction against the current Wrong Way Driving: Mitigation Toolkit.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 29 December 2023.
Action
Continue developing enhanced A5 off-slip mitigation options and establish which measures will be progressed, including improved signage and road markings.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 29 December 2023.
Action
Undertake further work to assess junction capacity and whether the A5 off-slip bell-mouth width can be reduced with hatched markings.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 29 December 2023.
Action
Inspect the junction and assess signage and road markings for safety defects.
Stated by Milton Keynes City CouncilStated completedThe respondent said that this action was complete when they made their response on 29 December 2023.
Action
Review the junction situation later as part of the planned work programme.
Stated by Milton Keynes City CouncilStated plannedThe respondent said that this action was planned when they made their response on 29 December 2023.
Action
Review navigation instructions near the junction by simulating driver-speed scenarios and assessing instruction timing.
Stated by TomTom International B.V.Stated completedThe respondent said that this action was complete when they made their response on 29 December 2023.
Action
Implement safeguards that time verbal navigation commands closer to the exit and after drivers pass the off-slip road.
Stated by TomTom International B.V.Stated completedThe respondent said that this action was complete when they made their response on 29 December 2023.
Action
Investigate and develop improvements to the timing of Google Maps audio guidance.
Stated by Google UK LimitedStated in progressThe respondent said that this action was in progress when they made their response on 29 December 2023.
Action
Add special voice guidance directing westbound drivers to continue straight at the overpass and turn right onto the A5 toward Milton Keynes and Bletchley.
Stated by Apple (UK) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 29 December 2023.
Action
Reinspect the site after the incident and investigate whether an immediate safety hazard exists.
Stated by Milton Keynes City CouncilStated completedThe respondent said that this action was complete when they made their response on 29 December 2023.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.5
Position
The junction already has all standard wrong-way-driving mitigation measures required by the current toolkit.
Stated by National HighwaysExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
Existing signage and road markings appeared adequate under applicable regulations, although illumination might improve the no-entry signage.
Stated by Milton Keynes City CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
The council has no powers to improve the junction mouth, signage or road markings because these are outside its highway authority functions.
Stated by Milton Keynes City CouncilOutside remitThe respondent said that this matter was outside its role or authority.
Position
National Highways is responsible for the slip road junction, its signage and road markings, so it must undertake related improvements.
Stated by Milton Keynes City CouncilRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Maps had no data or routing error that contributed to the deaths.
Stated by Apple (UK) LimitedDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Milton Keynes
Concerns raised1
Frequent wrong-way driving on the slip road
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.14
Action
Implement safeguards that time verbal commands closer to the exit and after the off-slip road.
Stated by TomTom International B.V.Stated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Install additional temporary No-Entry signs at the A5 off-slip exit to mitigate wrong-way driving.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Restore and maintain the temporary and fixed No-Entry signing, including correcting sign orientation, removing graffiti and repairing sign-related defects.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 30 August 2024.
Action
Close the offside slip-road lane and reposition the temporary No-Entry signs closer together to reduce apparent two-way-road movements.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Operate daily inspections of the temporary signing and cones to monitor their condition and alignment.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Deploy temporary ‘Do not follow Sat Nav’ and customer-information signs at the junction.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Investigate Sat Nav routing and liaise with Google Maps, Apple Maps and WAZE regarding potentially confusing audible instructions.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 30 August 2024.
Action
Undertake seven-day, 24-hour CCTV monitoring to measure the effectiveness of the temporary layout.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 30 August 2024.
Action
Commission and complete consultant feasibility assessments of permanent junction options, including safety risk, effectiveness, cost, engineering difficulty and lighting appraisal.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Review feasibility outcomes with consultants and develop the preferred permanent option through a workshop, outline design, cost estimate and Stage 1 road-safety-audit documents.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 30 August 2024.
Action
Carry out detailed design and programme implementation of permanent junction works for the 2025/26 financial year.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 30 August 2024.
Action
Liaised with National Highways and reviewed dashcam footage of the junction to inform investigation of Google Maps audio guidance.
Stated by Google UK LimitedStated completedThe respondent said that this action was complete when they made their response on 30 August 2024.
Action
Investigate and develop improvements to the timing of Google Maps audio guidance.
Stated by Google UK LimitedStated in progressThe respondent said that this action was in progress when they made their response on 30 August 2024.
Action
Add special voice guidance instructing drivers to continue straight at the overpass and turn right onto the A5 toward Milton Keynes, Bletchley.
Stated by Apple (UK) LimitedStated plannedThe respondent said that this action was planned when they made their response on 30 August 2024.
Teesside
Concerns raised2
Continuing hazard of drivers entering the exit slip road
Lack of advance road-sign information identifying the slip road as no entry
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
Action
Maintain supplementary illuminated “No entry” signs through regular inspection and prompt damage rectification.
Stated by A-one+ Integrated Highway ServicesStated completedThe respondent said that this action was complete when they made their response on 22 September 2014.
Action
Investigate options for safety improvements at the interchange following reported wrong-way driving incidents.
Stated by A-one+ Integrated Highway ServicesStated completedThe respondent said that this action was complete when they made their response on 22 September 2014.
Action
Submit a proposal for interchange safety improvement works during the next improvement-scheme funding round.
Stated by A-one+ Integrated Highway ServicesStated plannedThe respondent said that this action was planned when they made their response on 22 September 2014.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.3
Position
Permanent signs cannot be installed in the block-paved area because escorted abnormal loads must pass through it.
Stated by A-one+ Integrated Highway ServicesUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Proposed interchange improvements depend on securing funding through the Highways Agency's prioritised improvement-scheme bidding process.
Stated by A-one+ Integrated Highway ServicesUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Responsibility for advance signs on local roads and roundabouts rests with Stockton-on-Tees Borough Council, not the Highways Agency or A-one+.
Stated by A-one+ Integrated Highway ServicesRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.