What this concern includes

Includes failures in the design, provision, width, continuity or separation of cycle lanes where the deficiency exposes cyclists to material collision or loss-of-control risk, including insufficient space beside moving traffic, lanes narrower than applicable recommendations and absent cycle lanes on busy roads.

Not included

  • Excludes general road-design, junction, signage, visibility or traffic-management deficiencies where cycle-lane provision is not the shared unsafe condition.
  • Excludes isolated cyclist behaviour, collisions or use of footpaths where no deficiency in cycle-lane provision is identified.
  • Excludes pedestrian-only route, pavement or cycle-path maintenance concerns that do not concern the adequacy of cycle-lane provision for cyclists.
  • Excludes the broader road-safety hazard where the report does not identify a material cycle-lane provision deficiency.
Reports
9

Distinct published reports

Individual concerns
11

A report can raise multiple concerns

Date range
2014–2022

First to latest report issue date

Stated actions
20

Described in published responses

Reports over time

Reports over time

Reports about this concern issued each year.

* 2026 is projected from reports observed to 7 Sep 2026.

Most frequent recipients

Most frequent recipients

Reports about this concern sent to each recipient.

Transport for London2
Bournemouth, Christchurch and Poole Council1
Cheshire East Council1
Department for Transport1
Dorset County Council1
Dorset Highways Department1
London Borough of Camden1
London Borough of Croydon1
Oxfordshire County Council1
Slough Borough Council1
South London Legal Partnership1

Concerns and responses across reports

Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.

  1. Oxfordshire

    AI-generated summary

    Jennifer Wong · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Jennifer Wong died at the scene of a road traffic accident on Headington Road, Oxford, on 26 September 2021, after a mobile crane turning left knocked her from her cycle and ran over her. The report identifies concerns about the crane driver's significant nearside blind spots and the lack of close-proximity mirrors or other visibility measures. It also raises concerns about the layout and width of the cycle lane, which may bring cyclists into conflict with vehicles turning left.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Insufficient cycle-lane width

    Wider context from the report

    “The second concern relates to the width of the cycle lane. It is believed to be 0.95 metres wide at this location but the recommended width is 1.2m or perhaps 1.5m. I understand this is an issue which has already been raised following a site meeting. There may be valid reasons why the lane is the width it is but I would be grateful if this could be considered. ”

    Source location

    Jennifer Wong · Prevention of Future Deaths report
    Page 6 · concerns

    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Cycle lane layout failing to provide clear and safe positioning for cyclists crossing the junction

    Wider context from the report

    “The first and main concern is in relation to the nearside cycle lane and what appeared to be an element of confusion or perhaps a dilemma for cyclists at this location intending to cycle straight across the junction. The cycle lane puts cyclists on the nearside of a lane that is specifically for vehicles turning right into Headley Way. There is the box/advanced stop line in front of the line of traffic in the lane but this requires the cyclist to decide to use it and, importantly, to have time to make it pass the nearside of the vehicles and into the box before the vehicles in the lane commence their right turn. If there was no cycle lane, it appears more likely that a cyclist heading straight across would position themselves in lane 2 for vehicles also heading straight on. I believe that further consideration should be given to this issue and if improved signage has a part to play to mitigate the risks. I appreciate of course that it is not possible to remove risk completely and cyclists will make different choices about where to position themselves at a junction such as this one. I anticipate that the junction is not dissimilar to many others in Oxford. The issue of cyclists in nearside blind spots, particularly involving large commercial vehicles with limited visibility, therefore presents a significant and ongoing risk. ”

    Source location

    Jennifer Wong · Prevention of Future Deaths report
    Page 5 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Amend cycle-lane widths to meet the Department for Transport’s 1.2-metre minimum standard.

    Verbatim wording from the response

    “The original width of 0.95m was a legacy of a scheme that was installed some 10 plus years ago. The cycle widths are being amended to meet the current standards set out by the Department for Transport (1.2m minimum) and work is being undertaken by the council to establish where other sections of the city cycle network may be falling short of current standards. As mentioned previously, the amended designs and works will be completed by the end of November 2022.”

    Source location

    Response from Oxfordshire County Council
    Page 2 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Identify other city cycle-network sections that fall below current width standards.

    Verbatim wording from the response

    “The original width of 0.95m was a legacy of a scheme that was installed some 10 plus years ago. The cycle widths are being amended to meet the current standards set out by the Department for Transport (1.2m minimum) and work is being undertaken by the council to establish where other sections of the city cycle network may be falling short of current standards. As mentioned previously, the amended designs and works will be completed by the end of November 2022.”

    Source location

    Response from Oxfordshire County Council
    Page 2 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Provide cyclists with a five-second advance green signal at Headley Way.

    Verbatim wording from the response

    “The council has taken on board your concerns and several measures have already been put in place to improve the public highway for vulnerable road users at both the Headley way junction and at two other key sites within the city. The works that have been completed at Headley Way include: A 5 second advance green lights for cyclists heading east bound and a dropped kerb facility to bring cyclists off the London Road to turn left into Headley Way. We have also commissioned our highway maintenance contractors to undertake a series of road marking amendments to make it clearer for cyclists to utilise the junction. The redesign of the lane/cycle markings has been commissioned to specifically consider the concerns that you raised in your Matter of Concern point 1. The design and delivery of the works at the Headley junction are due to be completed by the end of November 2022.”

    Source location

    Response from Oxfordshire County Council
    Page 2 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Provide a dropped kerb directing cyclists from London Road to the Headley Way shared-use path.

    Verbatim wording from the response

    “The council has taken on board your concerns and several measures have already been put in place to improve the public highway for vulnerable road users at both the Headley way junction and at two other key sites within the city. The works that have been completed at Headley Way include: A 5 second advance green lights for cyclists heading east bound and a dropped kerb facility to bring cyclists off the London Road to turn left into Headley Way. We have also commissioned our highway maintenance contractors to undertake a series of road marking amendments to make it clearer for cyclists to utilise the junction. The redesign of the lane/cycle markings has been commissioned to specifically consider the concerns that you raised in your Matter of Concern point 1. The design and delivery of the works at the Headley junction are due to be completed by the end of November 2022.”

    Source location

    Response from Oxfordshire County Council
    Page 2 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Remove the stone planter at Headley Way to increase space for pedestrians and cyclists.

    Verbatim wording from the response

    “- Dropped kerb – The council has now completed the dropped kerb facility at Headley way. We will also be removing the stone planter to increase the space for pedestrians and cyclist at this junction. This now means that cyclists are directed off the London Road before the Headley Way junction to afford them safe passage to the shared use cycle/footway on Headley way.”

    Source location

    Response from Oxfordshire County Council
    Page 3 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Redesign and amend Headley Way road markings and cycle-lane markings to clarify cyclist movements through the junction.

    Verbatim wording from the response

    “The council has taken on board your concerns and several measures have already been put in place to improve the public highway for vulnerable road users at both the Headley way junction and at two other key sites within the city. The works that have been completed at Headley Way include: A 5 second advance green lights for cyclists heading east bound and a dropped kerb facility to bring cyclists off the London Road to turn left into Headley Way. We have also commissioned our highway maintenance contractors to undertake a series of road marking amendments to make it clearer for cyclists to utilise the junction. The redesign of the lane/cycle markings has been commissioned to specifically consider the concerns that you raised in your Matter of Concern point 1. The design and delivery of the works at the Headley junction are due to be completed by the end of November 2022.”

    Source location

    Response from Oxfordshire County Council
    Page 2 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Implement recommendations from the completed Stage 4 Road Safety Audit in proportion to the risks identified.

    Verbatim wording from the response

    “- Stage 4 Road Safety Audit (RSA) – The RSA4 was completed in October 2022. The report is attached. The council is now ensuring that the recommendations are implemented in a timely manner that is proportionate to the risk posed by the measures being recommended for delivery.”

    Source location

    Response from Oxfordshire County Council
    Page 3 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Commission and complete a Vulnerable Road Users audit of the relevant highway arrangements.

    Verbatim wording from the response

    “- Vulnerable Road Users (VRU) Audit – following a request from the family, this was commissioned through our Highway maintenance provider on Friday 7 October 2022. There was slight delay in requesting this as we had to wait for the Stage 4 RSA to be completed to ensure a different team were used to undertake the additional assessment. This is to ensure the impartiality of both reports. The findings normally take a minimum of 31 days to be compiled into a report. This is the standard length of time that we would expect for such a report to be developed. The council will write to the coroner with the recommendations of this report upon receipt. The council can confirm that any further actions that are recommended within either the Stage 4 RSA or the VRU report will be actioned with immediate effect where it is a priority measure recommended.”

    Source location

    Response from Oxfordshire County Council
    Page 3 · response
    Published 16 January 2023

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Review key junctions posing potential risks to vulnerable road users and develop short-, medium- and long-term mitigations.

    Verbatim wording from the response

    “- The council has reviewed its key junctions that were deemed to be a potential risk to vulnerable road users with input from the cycle safety groups. These reviews have involved site meetings and virtual meetings to fully understand what is required to make the junctions as safe as is reasonably practicable with the resources that are available. In some locations these have been split into short, medium and long-term measures to enable some quick mitigations whilst having a more strategic overview of future developments in the area that will dramatically change the layout of some of the areas.”

    Source location

    Response from Oxfordshire County Council
    Page 3 · response
    Published 16 January 2023

    Open published response
  2. Berkshire

    AI-generated summary

    Edward McGivern · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Edward McGivern was cycling to work on Dover Road, Slough Trading Estate, on 9 November 2018 when his bicycle collided with a heavy goods vehicle turning left at a traffic-light-controlled junction. He sustained multiple injuries and died at the scene. The concern was that the road layout and cycle lanes may place cyclists at continuing risk of being struck by motor vehicles turning left at junctions.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Failure of Dover Road layout to safely separate cyclists from motor vehicles

    Wider context from the report

    “I am concerned that there have now been two collisions between bicycles and motor vehicles at the junction of Dover Road and Buckingham Avenue caused by motor vehicles turning left at the traffic lights, and colliding with cyclists crossing the junction. There are many commercial vehicles using the roads around Slough Trading Estate, but also cyclists and pedestrians. The cycle lanes as they are marked on Dover Road may encourage cyclists to ride up the inside of vehicles waiting to turn left at the traffic lights, and they may not be seen by the drivers of those vehicles as they pull away from the lights and turn left, especially during the hours of darkness. The sharing of the carriageway of Dover Road between bicycles and motor vehicles by means of cycle lanes may put cyclists at risk. A review of the road layout of Dover Road, including the question of whether there should be dedicated marked cycle lanes, and if so, whether these should be positioned in the carriageway or on the pavement (so that the carriageway is reserved for motor vehicles and the pavement is shared between cyclists and pedestrians, with dedicated cycle paths) may produce a road system which is safer for cyclists. I consider that unless some action is taken there is a continuing risk of cyclists riding along Dover Road being struck by motorised vehicles turning left at junctions. ”

    Source location

    Edward McGivern · Prevention of Future Deaths report
    Page 1 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Review all cycle lanes as part of the updated borough cycling strategy.

    Verbatim wording from the response

    “The Council will undertake a review of all cycle lanes as part of the borough’s cycling strategy update. A comprehensive set of design standards for cycling, established on proven best practice, will be prepared. It is anticipated at this stage, that any resource prioritisation to cycle lane improvements will be assigned according to (a) locations where accidents have occurred and (b) where higher cycling levels exist and (c) to include a wider scheme of cycling improvements programmed to update cycle lanes and aligned to the regular cycle of maintenance, roadworks and improvement. The exact prioritisation criteria will be confirmed once the cycling strategy has been set out.”

    Source location

    Slough Borough Council Highways Department
    Page 2 · response
    Published 14 November 2019

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Prepare comprehensive cycling design standards based on proven best practice.

    Verbatim wording from the response

    “The Council will undertake a review of all cycle lanes as part of the borough’s cycling strategy update. A comprehensive set of design standards for cycling, established on proven best practice, will be prepared. It is anticipated at this stage, that any resource prioritisation to cycle lane improvements will be assigned according to (a) locations where accidents have occurred and (b) where higher cycling levels exist and (c) to include a wider scheme of cycling improvements programmed to update cycle lanes and aligned to the regular cycle of maintenance, roadworks and improvement. The exact prioritisation criteria will be confirmed once the cycling strategy has been set out.”

    Source location

    Slough Borough Council Highways Department
    Page 2 · response
    Published 14 November 2019

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Continue working with SEGRO representatives to promote vehicle priority at nearside cycle lanes and discourage cyclists from undertaking at junctions.

    Verbatim wording from the response

    “Specifically in relation to the SEGRO estate, the Council will continue to work with representatives from the estate to promote the need for vehicles to give way to a nearside cycle lane and to reinforce the message that cyclists should not undertake at junctions at any”

    Source location

    Slough Borough Council Highways Department
    Page 2 · response
    Published 14 November 2019

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Two cycling incidents do not constitute a collision cluster or demonstrate a systemic junction problem warranting concern.

    Verbatim wording from the response

    “1. There have been two collisions between bicycles and motor vehicles at the junction of Dover Road and Buckingham Avenue.”

    Source location

    Slough Borough Council Highways Department
    Page 1 · response
    Published 14 November 2019

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Segregating cyclists or reallocating road space is not feasible without disproportionate financial investment given the presenting problem and competing priorities.

    Verbatim wording from the response

    “A review of the road layout of Dover Road, including the question of whether there should be dedicated marked cycle lanes, and if so, whether these should be positioned in the carriageway or on the pavement (so that the carriageway is reserved for motor vehicles and the pavement is shared between cyclists and pedestrians, with dedicated cycle paths) may produce a road system which is safer for cyclists.”

    Source location

    Slough Borough Council Highways Department
    Page 3 · response
    Published 14 November 2019

    Open published response
  3. Dorset

    AI-generated summary

    Christopher William Gibbs · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Christopher William Gibbs was cycling home from work on the A338 on 3 October 2017 when he was struck from behind by a courier van and died at the scene. The report raised concerns about the lack of cycle lanes and warning signs for cyclists on the fast, busy and unlit dual carriageway, as well as debris making the edge of the carriageway unsafe for cycling.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of cycle lanes on both sides of the carriageway

    Wider context from the report

    “2. I have concerns with regard to the following: I. There is no cycle lane on either side of the carriage way. II. There are no warning signs to drivers making them aware of the potential presence of cyclists. Warning signs at the east bound carriageway near the Blackwater junction and westbound carriageway soon after the Ashley Heath roundabout would prompt such consideration by drivers in what would then be an unremarkable 10 mile drive. Such information would hopefully be at the fore front of drivers minds as they commenced this 10 mile section of his/her journey. ”

    Source location

    Christopher William Gibbs · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Introduce parallel safer routes along sections of the A338.

    Verbatim wording from the response

    “As noted in your report cyclists are permitted to use dual carriageways. However, the speed differential between cyclists and other vehicles can be high and it may be prudent for cyclists to consider alternative routes. For this reason, the Council has taken steps to introduce parallel safer routes along some sections of the A338 and does not propose to promote or encourage cycling on the A338 itself.”

    Source location

    2019-0100-Response-by-Dorset-County-Council
    Page 3 · response
    Published 11 June 2019

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    The fatal incident location was outside BCP Council’s jurisdiction, so BCP Council was not responsible for intervention there.

    Verbatim wording from the response

    “I thought it would be helpful to clarify the location of the incident in respect to the boundaries of the jurisdictions at the time of the incident and also at the present time. At the time of the incident the location was approximately 6.4km beyond the boundary of Bournemouth Borough Council’s jurisdiction. It occurred within the section of the A338 that Dorset County Council then had responsibility for.”

    Source location

    2019-0100-Response-by-Dorset-County-Council
    Page 2 · response
    Published 11 June 2019

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Limited road-safety funding prevents BCP Council from implementing all requested modifications, requiring casualty-based prioritisation.

    Verbatim wording from the response

    “Generally speaking, in regard to modifications to the layout of roads to improve safety, such as signing and lighting or measures to reduce speed, BCP Council receive large numbers of requests and far more than we can afford to implement. In order to reduce the maximum number of casualties with the finite funding available we prioritise road safety requests on the basis of actual casualty evidence.”

    Source location

    2019-0100-Response-by-Dorset-County-Council
    Page 2 · response
    Published 11 June 2019

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Additional cycle facilities, signing or lighting on the A338 are not considered necessary because the casualty record does not warrant them.

    Verbatim wording from the response

    “We have investigated the casualty accident history in the section of road over a length of 2km before BCP Council’s boundary. There have been 7 collisions here over the last 5 years that resulted in casualties. These included 3 minor injuries and 1 serious injury. These incidents do not form a cluster site and none of these incidents involved cyclists. Therefore, unfortunately, this location is not sufficiently highly ranking to justify any engineering intervention, purely on the grounds of road safety.”

    Source location

    2019-0100-Response-by-Dorset-County-Council
    Page 3 · response
    Published 11 June 2019

    Open published response
  4. Dorset

    AI-generated summary

    Rowan Lloyd · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Rowan Lloyd died after colliding with a traffic signal pole while cycling home from school and falling under the wheels of a trailer at a busy junction. Concerns related to the lack of pedestrian crossing facilities, barriers, and dedicated cycling infrastructure at the junction, particularly given its use by school-age pedestrians and cyclists.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of safe cyclist accommodation at the junction

    Wider context from the report

    “1. During the inquest evidence was heard that: i. I heard evidence that the junction of Portland Road, Murley Road and Langton Avenue is a particularly busy junction during the rush hours and during the “school runs”, as Portland Road is the main road into Portland and this junction is close to a number of schools. However, I heard evidence that there are no crossing points for pedestrians at the junction, no advanced stop line for cyclists, no cycle lane and no barriers between the road and the pavement on the approach to the traffic signals. 2. I have concerns with regard to the following: i. Pedestrians have to “guess” when the lights are in their favour, depending upon the road they intend to cross at the junction; there is no pelican crossing at the junction to assist pedestrians, many of who are of school age, to cross safely at this junction. ii. There is no barrier between the pavement and the road as the junction is approached from the north. This allows pedestrians and cyclists to potentially cross between cars that are held at the junction by the lights, and would mean cars travelling in a northerly direction up Portland Road would have an obscured view of those crossing the road between stationary vehicles. iii. There is no accommodation for cyclists. Given that many of the cyclists using this road will be of school age, particular care needs to be taken to ensure that cyclists can use the road safely and be clearly seen by drivers using Portland Road, perhaps by way of dedicated cycle lanes and/or advanced stop lines at the traffic signals. ”

    Source location

    Rowan Lloyd · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Carry out the wider A354 route study and consider the junction crossing, cyclist stop-line and corridor safety recommendations within it.

    Verbatim wording from the response

    “A pre-feasibility study of the signalled junction between Portland Road, Merley Road and Langton Avenue has been completed; a copy has been enclosed for your information. This study was completed in conjunction with a wider study that is being carried out of the A354 route between Portland and Weymouth.”

    Source location

    2018-0380-Response-by-Dorset-Council
    Page 1 · response
    Published 12 May 2019

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Pedestrian crossings and cyclists’ advanced stop lines cannot yet be committed to because the wider route study and available funding remain uncertain.

    Verbatim wording from the response

    “As you will read in the pre-feasibility study, recommendations have been made for pedestrian crossings and advanced stop lines for cyclists to be incorporated into the signalled junction. However, we are not able to commit to these works being carried out to the full extent of the A354 route study is not yet known. Funding for any improvement works on the A354 will be limited and will need to be focused on areas where the safety benefits will be greatest. The recommendations of the pre-feasibility study and safety along the whole corridor will be considered as part of the route study.”

    Source location

    2018-0380-Response-by-Dorset-Council
    Page 1 · response
    Published 12 May 2019

    Open published response
  5. Inner West London

    AI-generated summary

    Lucia CICCIOLI · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Lucia CICCIOLI was cycling westbound through the junction of Latchmere Road and Elspeth Road towards Lavender Hill when she lost her balance after travelling over a dip in the road and collided with a MAN lorry. She sustained fatal injuries and died at the scene. The principal concerns were inadequate cycle-lane provision and protection, the junction layout and yellow box, the narrow road, and a dangerous dip in the road requiring urgent repair.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Inadequate cycle lane provision leading up to the traffic lights

    Wider context from the report

    “1) There is an inadequate cycle lane leading up to the traffic lights leading up to the traffic lights at the junction of LATCHMERE ROAD and ELSPETH ROAD (the cycle lane is coloured pink on the Reconstruction Plan). ”

    Source location

    Lucia CICCIOLI · Prevention of Future Deaths report
    Page 3 · concerns

    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of cycle lane provision in LAVENDER HILL immediately past the junction

    Wider context from the report

    “4) There is no cycle lane provision in LAVENDER HILL immediately past the said junction. ”

    Source location

    Lucia CICCIOLI · Prevention of Future Deaths report
    Page 3 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Consider providing an improved cycle feeder lane within the revised junction design, accounting for western-arm constraints.

    Verbatim wording from the response

    “The provision of an improved cycle feeder lane will also be considered as part of the revised design, with consideration of the constraints on the western arm (see also response to points 4 and 5, below).”

    Source location

    2018-0148-Response-by-Transport-for-London
    Page 2 · response
    Published 8 July 2018

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    A cycle lane cannot currently be provided because insufficient carriageway space would require wider vehicles to enter it, creating a false sense of security.

    Verbatim wording from the response

    “There is no existing cycle lane on the exit side of the western arm of Lavender Hill, because there is insufficient carriageway space given the need to accommodate general traffic progressing from the two existing straight-ahead lanes on the eastern arm of Lavender Hill.”

    Source location

    2018-0148-Response-by-Transport-for-London
    Page 3 · response
    Published 8 July 2018

    Open published response
  6. Cheshire

    AI-generated summary

    David Holman · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    David Holman died instantly on 13 July 2016 after riding his pedal cycle from the pavement into the path of an oncoming HGV on the A556 at Plumley. Concerns were raised about the absence of a cycle lane, an obstructing road-sign support, and a dip in the kerb, which may have contributed to him leaving the footpath and could increase the risk of a similar occurrence.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of a cycle lane on a busy road

    Wider context from the report

    “It appears that there is no cycle lane there and the road gets very busy, so the footpath was being ridden along. There is a road sign situated just after the area at which the descent into the road is thought to have taken place. One support of this goes into the footpath causing an obstruction. There is also a dip in the kerb edge there. No one seemed to know why it was situated there as there is no field entrance or other opening opposite it. It was thought possible that either one or the other or both of these things could have had some effect in the causation of him leaving the footpath. We should appreciate your consideration of these facts to see if any changes need to be made to less the chance of a similar occurrence happening. ”

    Source location

    David Holman · Prevention of Future Deaths report
    Page 1 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Complete a road safety assessment of the carriageway stretch concerning cycleway provision.

    Verbatim wording from the response

    “It has also been scheduled for the Road Safety Team to make a complete Safety Assessment of this stretch of carriageway with regards to the provision of a cycleway.”

    Source location

    2017-0018-Response-by-Cheshire-East-Council
    Page 1 · response
    Published 19 February 2017

    Open published response
  7. City of London

    AI-generated summary

    Christopher Tandy · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Christopher Tandy died after his bicycle veered across London Bridge and he was struck by a southbound motor car. Concerns included inadequate prominent signage for the 20 mph speed limit and the lack of a separate cycle lane on the bridge.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of a separate lane for cyclists from vehicular and pedestrian traffic

    Wider context from the report

    “Ideally, a separate lane for cyclists (e.g. as on Southwark Bridge) would separate them from vehicular and pedestrian traffic. ”

    Source location

    Christopher Tandy · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Publish proposals for improved traffic arrangements in the London Bridge area, including consideration of cyclist safety.

    Verbatim wording from the response

    “In terms of the general road layout in the vicinity of London Bridge, there are a number of significant public and private developments currently in progress and others to be delivered in the near future, some of which have a temporary impact on road capacity and layout. In the longer term, TfL intends to publish proposals for improved traffic arrangements in the London Bridge area, intended to benefit road users in general, and cyclists in particular. The feasibility of a Cycle Superhighway across London Bridge is likely to begin in 2016, when various options such as full segregation will be investigated. Following this there will be full public consultation. Your concerns will also be taken into account in this process.”

    Source location

    2015-0234-Response-by-Transport-for-London
    Page 1 · response
    Published 4 June 2015

    Open published response
  8. South London

    AI-generated summary

    Roger William Maurice De Klerk · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    On 12 November 2013, Roger William Maurice De Klerk was cycling along Addiscombe Road when his bicycle wheels contacted tramlines, causing him to fall into the path of a bus. The bus collided with him and his bicycle. Concerns included the danger posed by tramlines to cyclists, confusing cycle-lane design and signage, and the intended route across tactile paving and pedestrian areas.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Confusing bicycle-lane design and appearance at the junction

    Wider context from the report

    “(2) The design and appearance of the bicycle lane at the junction of Addiscombe Road and Cherry Orchard Road may cause confusion for cyclists who are apparently required to go on to the pavement before the junction in order to cross it safely. The cycle path continues into the junction so that cyclists turning left will be forced to parallel with the lines, rather than crossing at 90 degrees, which is safer. ”

    Source location

    Roger William Maurice De Klerk · Prevention of Future Deaths report
    Page 1 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Conduct the junction safety review with TfL designers and obtain short- and long-term improvement options.

    Verbatim wording from the response

    “Following the findings of your Coroner’s inquest, the council has agreed to carry out a detailed review of the junction of Addiscombe Road / Cherry Orchard Road with the aim of finding any improvements that will assist cyclist and improve road safety at this site. To this end, the council is requesting TfL’s design team (with expertise employed on TfL’s cycling better junction review and central London cycle Superhighway design) to carry out this review and provide the council with a range of workable options. These will include both short term options that can be implemented quickly, and more extensive improvement. We are entering into discussions with TfL regarding cycling Quietway funding with a view to making such more extensive improvement by 2016.”

    Source location

    2014-0448-Response-De-Klerk
    Page 1 · response
    Published 16 October 2014

    Open published response
  9. Inner North London

    AI-generated summary

    Francis Nelson GOLDING · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Francis Nelson Golding, aged 59, died after the pedal cycle he was riding collided with a left-turning coach at the junction of Vernon Place and Southampton Row in London. The inquest heard that three cyclists had died at the junction in the previous ten years in collisions with left-turning vehicles, and raised concerns that the junction left cyclists particularly vulnerable, including because of the oncoming bus lane. Early consideration of improvements to the junction was requested.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Insufficient space for cycles in the oncoming bus lane

    Wider context from the report

    “During the course of the inquest, I heard evidence of three fatalities at this junction in the last ten years, each involving a cyclist colliding with a left turning vehicle. Whilst of course every road user has a responsibility to take care at junctions, it does seem that this junction leaves cyclists particularly vulnerable. There is also, I heard, an issue with the oncoming bus lane not leaving any additional space for cycles. ”

    Source location

    Francis Nelson GOLDING · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Permit cyclists to use the Bloomsbury Way contra-flow bus lane with bollards, signing and a clear box junction under an experimental order.

    Verbatim wording from the response

    “Where it is possible for Camden to implement changes we do so. One of the most recent examples, which is also referred to in the report, is allowing cyclists to use the contra-flow bus lane on Bloomsbury Way. When the bus priority scheme was first implemented, in 2009, cyclists were not permitted to use the contra-flow bus lane as, due to lack of road space and issues with junction capacity, the bus lane could not be widened to safely accommodate cyclists passing buses. This resulted in cyclists travelling west having to use the Holborn gyratory via Drake Street, Proctor Street and High Holborn to re-join the corridor at New Oxford Street, which has been raised as a concern by cyclists.”

    Source location

    2014-0136-Response-by-Camden-Council
    Page 4 · response
    Published 14 April 2014

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Commission traffic consultants to model signals across the Holborn area scheme, including Vernon Place and Southampton Row, and assess options for improving cyclist facilities.

    Verbatim wording from the response

    “A brief will be issued to traffic consultants by the end of May 2014 to invite tenders for the next stage of development. Consultants will be commissioned to undertake traffic signal modelling for the whole Holborn area based scheme area, which includes the Southampton Row/Vernon Place junction. Under the current programme it is anticipated that consultants will be appointed in mid June 2014. A range of options will be considered as part of this commission which will explore possibilities to significantly improve facilities for cyclists. This stage of the process is expected to take 9 months.”

    Source location

    2014-0136-Response-by-Camden-Council
    Page 5 · response
    Published 14 April 2014

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Implementation of major junction changes cannot occur immediately because it depends on consultation, funding and coordination with other projects.

    Verbatim wording from the response

    “A brief will be issued to traffic consultants by the end of May 2014 to invite tenders for the next stage of development. Consultants will be commissioned to undertake traffic signal modelling for the whole Holborn area based scheme area, which includes the Southampton Row/Vernon Place junction. Under the current programme it is anticipated that consultants will be appointed in mid June 2014. A range of options will be considered as part of this commission which will explore possibilities to significantly improve facilities for cyclists. This stage of the process is expected to take 9 months.”

    Source location

    2014-0136-Response-by-Camden-Council
    Page 5 · response
    Published 14 April 2014

    Open published response
Back to top