Recurring concern
Inadequate safety assessment of ward environments
- Reports that mention this concern
- 2
- Times this concern has been raised
- 2
- Stated actions linked to this concern
- 4
What this concern includes
Includes failures to assess, inspect or formally assure the physical configuration and safety of wards, healthcare units or their cells where the deficiency can leave patients or prisoners exposed to environmental risks; include the anchor's absent risk assessment, unsafe ward-layout assessments and incomplete or uncoordinated cell-inspection processes.
What is not included
- Excludes generic clinical, staffing, training or governance deficiencies unless they directly concern assessment or assurance of the ward environment.
- Excludes condition-specific safety systems, such as ligature-point controls, CCTV, patient observation or fire detection, when that named system is the more specific unsafe concern.
- Excludes ordinary building maintenance or isolated physical defects where no failure of ward-environment assessment or assurance is identified.
- Excludes non-ward premises, public spaces and general workplace risk assessments without a supported ward or healthcare-unit context.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Reports and published responses 2 reports
See individual reports that have raised this concern, and the actions taken in response
-
Concerns raised1
Lack of a formal process for complete visual inspection of ward cells
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked responses
- Birmingham and Solihull Mental Health NHS Foundation Trust
- HM Prison and Probation Service
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
-
Birmingham and Solihull Mental Health NHS Foundation Trust
Update the ligature risk assessment model to cover more cells over time and maintain an audit trail of previously viewed cells.
-
Birmingham and Solihull Mental Health NHS Foundation Trust
View every prison cell during the annual ligature risk assessment, subject to the prison providing assessor access.
-
Birmingham and Solihull Mental Health NHS Foundation Trust
Formalise the risk-assessment process with the prison by placing it on the Local Delivery Board meeting agenda.
-
HM Prison and Probation Service
Introduce a formalised cell ligature-risk assessment process with the Health and Safety team and NHS.
-
Concerns raised1
Lack of risk assessment of the East Wing ward configuration over four floors
This report raised 3 other concerns. They are not shown here because they do not form part of this recurring concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.
Data last updated 7 September 2026