Recurring concern

Unreliable coordination of safety equipment installation requests

Pin Get email alerts Request correction

First reported 3 Oct 2013•Latest report 19 Mar 2024

Definition

What this concern includes

Includes failures in arrangements specifically dedicated to coordinating safety-equipment installation requests from assessment or request through delivery notification, correct installation, completion of associated repairs, tracking of delays or issues and review of equipment performance.

Not included

  • Excludes generic equipment availability, maintenance or serviceability failures where no equipment-installation request or follow-up process is deficient.
  • Excludes generic inter-agency communication, policy or documentation deficiencies unless they directly concern coordination of a safety-equipment installation request.
  • Excludes clinical assessment or care failures after equipment has been correctly installed and its performance reliably reviewed.
  • Excludes equipment risks unrelated to a request, installation, repair or post-installation review process.
Reports
2

Distinct published reports

Individual concerns
5

A report can raise multiple concerns

Date range
2013–2024

First to latest report issue date

Stated actions
9

Described in published responses

Reports over time

Reports over time

Reports about this concern issued each year.

* 2026 is projected from reports observed to 7 Sep 2026.

Most frequent recipients

Most frequent recipients

Reports about this concern sent to each recipient.

Associate Director of Consumer Relations and Legal Affairs1
Floron Residential Home1
Stockport Borough Council1
Stockport Homes Limited1

Concerns and responses across reports

Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.

  1. Manchester South

    AI-generated summary

    Ian Dixon · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Ian Dixon, who had confusion, was unsteady on his feet and had a history of falls, was found deceased at the bottom of the stairs in his home on 8 June 2023 after suffering an extensive skull fracture and acute right-sided subdural haematoma. A principal concern was that there was no policy or review process to confirm that urgent equipment requested through the council and Stockport Homes had been installed or to identify delays, and the handrail had not been fitted despite being recorded as complete.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Failure to review completion and delays in urgent equipment installation and repairs

    Wider context from the report

    “The Inquest heard that there is no policy in place governing the interaction between Stockport Metropolitan Borough Council and Stockport Homes following a request for the installation of equipment. This means that there is no review undertaken to check whether urgent equipment has been installed, urgent repairs completed or if there are delays/issues with the works requested. ”

    Source location

    Ian Dixon · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of a policy governing interaction following equipment installation requests

    Wider context from the report

    “The Inquest heard that there is no policy in place governing the interaction between Stockport Metropolitan Borough Council and Stockport Homes following a request for the installation of equipment. This means that there is no review undertaken to check whether urgent equipment has been installed, urgent repairs completed or if there are delays/issues with the works requested. ”

    Source location

    Ian Dixon · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Develop, agree with SMBC, and publish target timescales for adaptations.

    Verbatim wording from the response

    “• Target timescales will be developed, agreed with SMBC and published by the end of May 2024.”

    Source location

    Response from Stockport Homes
    Page 2 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Monitor major adaptations through the established monthly joint Adaptations Panel.

    Verbatim wording from the response

    “• The progress of major adaptations (e.g. stairlifts, level access showers etc) will be monitored via the monthly Adaptations Panel attended by both SMBC and SHG Officers. This meeting is already established.”

    Source location

    Response from Stockport Homes
    Page 2 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Develop a shared SharePoint site for SMBC and SHG staff to monitor minor adaptation installations and provision.

    Verbatim wording from the response

    “• A SharePoint site will be developed providing access to both SMBC and SHG staff to monitor the progress of the installation and provision of minor adaptations (e.g. handrails, grab rails etc) - this will be in place by the end of May 2024.”

    Source location

    Response from Stockport Homes
    Page 2 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Develop, agree and publish target timescales for adaptation installations.

    Verbatim wording from the response

    “To address these issues SMBC have liaised with Stockport Homes and have seen evidence of changes they will implement and will ensure we are active participants including:”

    Source location

    Response from Stockport Metropolitan Borough Council
    Page 1 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Monitor major adaptation progress through the monthly Adaptations Panel.

    Verbatim wording from the response

    “2. The progress of major adaptations (e.g. stairlifts, level access showers etc) will be monitored via the monthly Adaptations Panel attended by both SMBC and SHG Officers. This meeting is already established.”

    Source location

    Response from Stockport Metropolitan Borough Council
    Page 1 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Develop a shared SharePoint site for monitoring minor adaptation installation and provision.

    Verbatim wording from the response

    “3. A Sharepoint site will be developed providing access to both SMBC and SHG staff to monitor the progress of the installation and provision of minor adaptations (e.g. handrails, grab rails etc) - this will be in place by the end of May 2024.”

    Source location

    Response from Stockport Metropolitan Borough Council
    Page 2 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Make the ordering worker responsible for confirming adaptation requests are actioned before case closure.

    Verbatim wording from the response

    “In addition to the changes that will be made in collaboration with Stockport Homes SMBC will take the following actions:”

    Source location

    Response from Stockport Metropolitan Borough Council
    Page 2 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Assign the Team Manager oversight of the process and use the Adaptations Panel to monitor the changes.

    Verbatim wording from the response

    “3. The Team Manager will have responsibility for oversight of this process and will retain the role of chair of the Major Adaptations Panel and has close links with Stockport Homes colleagues and will use this forum to monitor the changes described above.”

    Source location

    Response from Stockport Metropolitan Borough Council
    Page 2 · response
    Published 21 March 2024

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Strengthen the service-level agreement with formal governance, agreed targets and monitoring arrangements.

    Verbatim wording from the response

    “4. In relation to all actions identified above, strengthening of the current SLA is required to ensure that both consistency of approach between both organisations and necessary targets are set and monitored. This will be completed by the end of June ensuring formal governance and sign off is agreed and understood.”

    Source location

    Response from Stockport Metropolitan Borough Council
    Page 2 · response
    Published 21 March 2024

    Open published response
  2. East London

    AI-generated summary

    Douglas Grey · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Douglas Grey, a resident of a residential home, suffered two falls after an inflatable mattress was placed on top of his original mattress and later became unconscious. He died in hospital in the early hours of 5 May 2012; the medical cause of death was recorded as right-sided pneumonia due to an acute subdural haematoma. Concerns included the absence of a clear procedure for notifying district nurses, correctly installing equipment and reviewing its performance, and staff not recognising or reporting faults with the mattress in line with the home's policy.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of a written procedure or policy for notifying district nurses of delivery of assessed equipment

    Wider context from the report

    “1. Evidence was given at the inquest that there was no clear written procedure or policy in place to ensure notification to the district nurses of delivery of equipment they had assessed as being needed, correct installation of that equipment and review of the equipment’s performance. ”

    Source location

    Douglas Grey · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of a written procedure or policy for correct installation of assessed equipment

    Wider context from the report

    “1. Evidence was given at the inquest that there was no clear written procedure or policy in place to ensure notification to the district nurses of delivery of equipment they had assessed as being needed, correct installation of that equipment and review of the equipment’s performance. ”

    Source location

    Douglas Grey · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below.

    PFD Monitor interpretation

    Lack of a written procedure or policy for reviewing equipment performance

    Wider context from the report

    “1. Evidence was given at the inquest that there was no clear written procedure or policy in place to ensure notification to the district nurses of delivery of equipment they had assessed as being needed, correct installation of that equipment and review of the equipment’s performance. ”

    Source location

    Douglas Grey · Prevention of Future Deaths report
    Page 2 · concerns

    Open source report