First report 30 Dec 2022•Latest report 30 Dec 2022
Recipient record
Reports, concerns and published responses
Private and voluntary organisations · Private limited company. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.
Reports
1
Naming this recipient
Published responses
100%
Found for named reports
Concerns addressed
2
Across all linked responses
Stated actions
16
Described in responses
Reports over time
Reports over time
Reports naming this recipient by issue year.
Evidence profile
Report topics
Share of this recipient’s reports compared with all other recipients.
100%published responses found
16stated actions described
Topic comparisons are not available in the current evidence snapshot.
Concerns and recipient responses
Statements from Connect Plus (M25) Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.
Surrey
Concerns raised2
Failure to implement an informed and comprehensive plan for risk management at the location
Persistent road-surface flat spot and associated aquaplaning hazard
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised.13
Action
Trial catchpit sensors to monitor water levels and flow and inform intervention frequency.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Review drainage maintenance and inspection requirements, assess best practice and determine whether enhanced requirements are justified.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Assess carriageway profile and develop sufficiently detailed remediation proposals for cost-benefit analysis where issues are identified.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Investigate flooding-hotspot anomalies and identify justified potential improvements to the drainage system.
Stated plannedThe respondent said that this action was planned when they made their response on 9 January 2023.
Action
Carry out vegetation cutting and remove excess vegetation from the adjacent landscape plot to reduce leaf burden.
Stated plannedThe respondent said that this action was planned when they made their response on 9 January 2023.
Action
Undertake scheduled drainage inspections, cleansing of blocked or silted assets, and sweeping of the hardstrip and central reserve.
Stated plannedThe respondent said that this action was planned when they made their response on 9 January 2023.
Action
Maintain the newly installed temporary flooding warning signs and inspect them weekly for presence and function.
Stated completedThe respondent said that this action was complete when they made their response on 9 January 2023.
Action
Undertake a standards-based review of signage requirements, including whether the fixed warning sign should be illuminated.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Develop and operate a severe-weather surface-water response procedure covering patrol deployment, incident logging, secondary response and CCTV monitoring.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Carry out weekly visual inspections of slot drains and catchpit surfaces to identify debris accumulation.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Review whether alternative carriageway surfacing could provide beneficial risk mitigation.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Review and develop contingency plans for proactive management of heavy rain, surface water and associated warnings or restrictions.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Develop and issue an inspection guide defining acceptable debris levels for hardstrips, central reserves and slot drains.
Stated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Respondent positions A position is what this recipient says about the concern when it does not describe a specific action.2
Position
CPS is responsible for implementing the enhanced measures and GG104 Programme, while Connect Plus monitors delivery.
Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
National Highways retains control of safety-critical technology, including decisions on speed-limit signs and variable message warnings.
Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.