Recipient

Recipient name withheld

First report 1 Oct 2015•Latest report 1 Oct 2015

Recipient record

Reports, concerns and published responses

This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.

Reports
1

Naming this recipient

Published responses
0%

Found for named reports

Concerns addressed
0

Across all linked responses

Stated actions
0

Described in responses

Reports over time

Reports over time

Reports naming this recipient by issue year.

Evidence profile

Report topics

Share of this recipient’s reports compared with all other recipients.

0%published responses found
0stated actions described

Topic comparisons are not available in the current evidence snapshot.

Concerns and recipient responses

Statements from Recipient name withheld linked to the concerns in each report. Select any concern, action or position to view the source wording.

  1. Stoke-on-Trent and North Staffordshire

    AI-generated summary

    John Lomas · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    John Lomas, a serving soldier, died after a white water rafting boat capsized shortly after launch on the River Inn on 21 June 2012; he was unable to be resuscitated and was certified dead. Concerns included inadequate liaison and risk assessment, the raft exceeding its permitted capacity for the prevailing conditions, launching too close to a stopper, and the absence of preparatory training, a water confidence test, and a safety kayak.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to maintain a safe launch distance from a stopper

    Wider context from the report

    “4. The raft on which Private Lomas was a passenger was launched too close to a stopper resulting in it capsizing within seconds of launch. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Exceeding permitted raft capacity for prevailing white water conditions

    Wider context from the report

    “3. The number of person in the raft exceeded that permitted for the white water grade 4+ conditions that prevailed at the time. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of pre-activity liaison between rafting provider and Army

    Wider context from the report

    “1. There had been no liaison between Sport Camp Tirol and the Army prior to the white water rafting Trip that took place on the 21st June 2012. No generic risk assessment had been provided to or requested by Sports Camp Tirol as a result there was a lack of understanding as to the suitability of soldiers to undertake the trip. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of obligation for TIWAG to notify downstream rafting companies of significant discharges

    Wider context from the report

    “9. There was no obligation to liaise with TIWAG Water Company to ascertain when a significant stowage discharge would take place and TIWAG had no obligation to notify rafting companies downstream who might be affected by the discharge. (The last discharge had been two and half years prior to this incident.) ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of preparatory training on a less challenging river

    Wider context from the report

    “5. There was no preparatory training on a less challenging river. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of obligation for rafting operators to ascertain significant TIWAG discharges

    Wider context from the report

    “9. There was no obligation to liaise with TIWAG Water Company to ascertain when a significant stowage discharge would take place and TIWAG had no obligation to notify rafting companies downstream who might be affected by the discharge. (The last discharge had been two and half years prior to this incident.) ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to dynamically risk assess changing river conditions before launch

    Wider context from the report

    “2. The lead guide and the raft guide did not correctly dynamically risk assess the river Inn on the 21st June 2012 at the point of departure of the trip. They did not recognise that the level of water had risen by one third in the hour preceding the launch resulting in white water of grade 4+. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of water confidence testing

    Wider context from the report

    “6. There was no water confidence test. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to rectify identified boat faults

    Wider context from the report

    “8. Although not considered contributory in this particular matter it was noted that the boat had faults which were identified at its last inspection which had not been rectified. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of generic risk assessment for soldier suitability for rafting

    Wider context from the report

    “1. There had been no liaison between Sport Camp Tirol and the Army prior to the white water rafting Trip that took place on the 21st June 2012. No generic risk assessment had been provided to or requested by Sports Camp Tirol as a result there was a lack of understanding as to the suitability of soldiers to undertake the trip. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Recipient name withheld; that does not assign responsibility.

    PFD Monitor interpretation

    Unavailability of a safety kayak

    Wider context from the report

    “7. There was no safety kayak. ”
    Open source report
Back to top

Published response patterns

Compared with other recipients in reports included in PFD Monitor

Describes published response evidence, not performance.

Published responses found

0%
0%All other recipients 58%
0%100%

How actions were described at the time

This respondent
All other recipients
47%25%27%<1%<1%
  • Completed
  • In progress
  • Planned
  • Unclear
  • Partially completed

Statuses reflect what recipients said at the time. PFD Monitor does not verify whether actions happened.

Types of action described in responses

Percentages use all actions described by each group. An action may have more than one type, so percentages do not total 100%.

Information checked against published PFD reports and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Data last updated 7 September 2026