Recipient

Tonic Construction Limited

First report 29 Aug 2017•Latest report 29 Aug 2017

Recipient record

Reports, concerns and published responses

Private and voluntary organisations · Private limited company. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.

Reports
1

Naming this recipient

Published responses
0%

Found for named reports

Concerns addressed
0

Across all linked responses

Stated actions
0

Described in responses

Reports over time

Reports over time

Reports naming this recipient by issue year.

Evidence profile

Report topics

Share of this recipient’s reports compared with all other recipients.

0%published responses found
0stated actions described

Topic comparisons are not available in the current evidence snapshot.

Concerns and recipient responses

Statements from Tonic Construction Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.

  1. Gloucestershire

    AI-generated summary

    Shaun Carter · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Shaun Carter died after jumping from a dumper truck that went over the edge of a spoil heap at a construction site; he was struck by the truck and suffered catastrophic injuries. The principal concerns were that safety procedures for dumper trucks were not consistently followed, communicated or audited, that there was no process or industry guidance for safely managing spoil heaps, and that drivers may naturally jump from trucks despite instructions to remain seated.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Tonic Construction Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to audit compliance with dumper truck safety procedures

    Wider context from the report

    “1. At the inquest there was evidence that the risks associated with the use of dumper trucks was recognised and that risk assessments and method statements were written which reflected these risks. However the safety procedures were not followed, not seen by all relevant personnel (some of whom could not read) and the practice in this regard was not audited. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Tonic Construction Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to ensure dumper truck safety procedures are accessible to all relevant personnel

    Wider context from the report

    “1. At the inquest there was evidence that the risks associated with the use of dumper trucks was recognised and that risk assessments and method statements were written which reflected these risks. However the safety procedures were not followed, not seen by all relevant personnel (some of whom could not read) and the practice in this regard was not audited. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Tonic Construction Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to follow dumper truck safety procedures

    Wider context from the report

    “1. At the inquest there was evidence that the risks associated with the use of dumper trucks was recognised and that risk assessments and method statements were written which reflected these risks. However the safety procedures were not followed, not seen by all relevant personnel (some of whom could not read) and the practice in this regard was not audited. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Tonic Construction Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Dumper truck drivers jumping from trucks during incidents

    Wider context from the report

    “3. Dumper trucks are designed to ensure that drivers are protected, even if the dumper trucks topple over. However the inherent open nature of trucks can nonetheless make the driver feeling vulnerable and despite the instructions which require the driver to remain seated during an incident, statistics indicate (as in this case) that the natural reaction of drivers is to jump from the truck. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Tonic Construction Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of a process for safely managing spoil heaps

    Wider context from the report

    “2. At the inquest it was confirmed that there was no process in place to ensure that spoil heaps were managed safely, nor any guidelines issued by the HSE in this regard. This has been addressed by Tonic Construction in relation to the site its manages, but there are still no industry standards relating to the management of spoil heaps. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Tonic Construction Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of industry standards for managing spoil heaps

    Wider context from the report

    “2. At the inquest it was confirmed that there was no process in place to ensure that spoil heaps were managed safely, nor any guidelines issued by the HSE in this regard. This has been addressed by Tonic Construction in relation to the site its manages, but there are still no industry standards relating to the management of spoil heaps. ”
    Open source report
Back to top

Published response patterns

Compared with other recipients in reports included in PFD Monitor

Describes published response evidence, not performance.

Published responses found

0%
0%All other recipients 58%
0%100%

How actions were described at the time

This respondent
All other recipients
47%25%27%<1%<1%
  • Completed
  • In progress
  • Planned
  • Unclear
  • Partially completed

Statuses reflect what recipients said at the time. PFD Monitor does not verify whether actions happened.

Types of action described in responses

Percentages use all actions described by each group. An action may have more than one type, so percentages do not total 100%.

Information checked against published PFD reports and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Data last updated 7 September 2026