Recipient

Yorkshire Hydropower Limited

First report 30 Apr 2021•Latest report 30 Apr 2021

Recipient record

Reports, concerns and published responses

Private and voluntary organisations · Private limited company. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.

Reports
1

Naming this recipient

Published responses
100%

Found for named reports

Concerns addressed
5

Across all linked responses

Stated actions
11

Described in responses

Reports over time

Reports over time

Reports naming this recipient by issue year.

Evidence profile

Report topics

Share of this recipient’s reports compared with all other recipients.

100%published responses found
11stated actions described

Topic comparisons are not available in the current evidence snapshot.

Concerns and recipient responses

Statements from Yorkshire Hydropower Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.

  1. West Yorkshire Eastern

    AI-generated summary

    Eliot Peter Burton · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Eliot Peter Burton, aged 15, was found drowned at an unmanned hydroelectric plant after entering the site as a trespasser and falling into an outlet channel. The concerns included repeated trespassing by young people, deep uncovered channels with limited or no edge protection, difficult access to the site via the adjacent weir, and limited effective action to reduce the risks to children.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Yorkshire Hydropower Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of on-site supervision at a remote site

    Wider context from the report

    “1. The site is always unmanned. It is located in a remote area ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Yorkshire Hydropower Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Insufficient prevention of access to the site via the adjacent weir

    Wider context from the report

    “4. Despite perimeter fencing, it is known that one route for children to gain entry to the site is by crossing the River Calder at the Kirkthorpe weir adjacent to the site. There are few, if any impediments to prevent access to the weir from the river bank opposite the site. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Yorkshire Hydropower Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to protect deep water channels from falls

    Wider context from the report

    “3. There are deep uncovered channels on the site to conduct water through the facility. It is foreseeable that a trespasser would be in a precarious situation if they were to fall into the water, as Elliot Burton did. Many of the channels are uncovered, and /or have no edge protection. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Yorkshire Hydropower Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Trespassing by young people onto the site

    Wider context from the report

    “2. It is known that in the years 2018-2021, young people have trespassed onto the site. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Yorkshire Hydropower Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to take effective action to reduce the risk of harm from child trespass

    Wider context from the report

    “5. Despite the passage of some 21 months since Elliot Burton’s death, little effective action has been taken to reduce the risk of children being harmed if they are tempted to trespass on this site. ”
    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Support procurement and continue necessary design and procurement input while facilitating construction of the riverside barrier.

    Verbatim wording from the response

    “4.4 YHL are supporting WMDC in the procurement process for the steel works while the planning application is being reviewed.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 4 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Install galvanised steel fans and associated fencing to block access routes around the outlet channel, fish pass, downstream outlet and escape ladder.

    Verbatim wording from the response

    “3.12 With reference to access along the capping beam which encloses the outlet channel, we have had to balance the need for any structures to be robust so as to resist flood impact and also to be reasonably accessible for maintenance (for example through the use of hand tools). We will be installing a galvanised steel fan, bolted to the capping beam and spanning out over the outlet channel.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 3 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Add fence returns, mesh infills, warning signs, internal barriers, secure gates and practicable channel covers to deter unauthorised access.

    Verbatim wording from the response

    “2.3 In relation to access from the landside perimeter, we have added further fence panel returns and signage, we have also now had expert advice as to the use of galvanised metal spiked fans. Where practicable these will be used to deter persons from climbing around the edge of perimeter fence panels where they open on to the river and accessing ledges within the Facility. The objective is to make access difficult and unattractive to the Facility as a whole, and within it in relation to those areas where there are drops to deep and potentially fast flowing water. However, these measures must not create debris traps that import significant risk for those required to then remove debris and maintain the structures.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 2 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Install a hinged, lockable plate on the penstock-actuator access ladder to prevent unauthorised climbing.

    Verbatim wording from the response

    “3.15 Another area which has had interest from trespassers is the high level bridge across the intake penstock which provides operational access to the penstock actuator. Access to the bridge is via a vertical ladder. We will be installing a hinged, and lockable plate, fitted to the ladder to prevent it being climbed by unauthorised persons.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 4 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Review the summer manned-security presence for deterrence, incidents, guard safety, operating times and interaction with other measures.

    Verbatim wording from the response

    “1.4 We will review the effectiveness of this at the end of the summer. This review will include consideration of any interactions between the guard and potential or actual trespassers, the personal safety of the guard, whether trespass was deterred and/or incidents prevented and whether the times were aligned with the periods of activity in the locality. The effectiveness and/or necessity of having such a security presence will also be viewed in the context of the other measures being implemented, these are discussed in response to your other paragraphs below.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 2 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Enhance CCTV coverage and resolution, monitor it continuously, and improve the PA system for remotely issued trespass warnings.

    Verbatim wording from the response

    “1.2 As set out in evidence before the inquest, public safety and site security is aided by extensive CCTV which is monitored by Servo, our security contractors, who can communicate directly via the site PA system and also will make reports to the Police and relevant key holders.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 1 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Commission a detailed options report and develop an agreed design for a barrier at the weir and sluice-gate interface.

    Verbatim wording from the response

    “4.2 The sluice gates and weir are not on land which is owned or controlled by YHL. Since the tragic incident YHL has sought to engage with the relevant parties to consider whether it is feasible to construct an additional barrier on or around these structures where they interface with the Facility. YHL does not have the authority to take action unilaterally in relation to any such works.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 4 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Trial a manned security presence daily from 10am to 8pm during summer months.

    Verbatim wording from the response

    “1.3 We are currently trialling having a manned security presence on site between the hours of 10am to 8pm, 7 days a week for the summer months. Primarily the guard is a deterrent. The guard will be limited in challenging trespassers, for example they will not be able to physically remove them from the Facility.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 1 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Extend the screen-walkway access, relocate the existing end handrail and fit additional mesh decking over the screenings-channel end.

    Verbatim wording from the response

    “3.4 We are reducing the attraction of this route at the upstream end by extending the access along the screen walkway to include access over the end of the screenings channel. This would reduce the attraction to climb through/over to see what is beyond. This will be achieved by relocating the existing end handrail and fitting additional mesh decking.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 3 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Covering the channels is not reasonably practicable because flooding, debris, maintenance access and potential escape hazards would introduce greater risks.

    Verbatim wording from the response

    “3.2 The use of fences and barriers within the Facility, as well as the covering of channels has to be considered in the context of debris entrapment and critically, access for those removing it. The force of the river and the substantial debris that collects can and has caused damage to the Facility, this is one of the major operational concerns in this dynamic environment.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 2 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    The weir and sluice gates are not owned or controlled, and unilateral action to install barriers there is outside the authority available.

    Verbatim wording from the response

    “4.1 The route used by Elliot to access the Facility was to walk across the weir from the bank opposite, climb over the sluice gate structure and over a timber fence. The sluice gates (which are a listed structure) and the weir substantially predate the construction of the Facility.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 4 · response
    Published 4 May 2021

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Wakefield Metropolitan District Council leads construction of the barrier at the weir and sluice gates through completion.

    Verbatim wording from the response

    “4.3 YHL has been part of a working group with WMDC and CRT since before the inquest. YHL commissioned a detailed options report which formed the basis of the final design, agreed by the group, for a barrier at this location. The details of that design have been submitted by WMDC to the local planning authority.”

    Source location

    2021-0131-Response-from-Yorkshire-Hydropower-Limited-Redacted
    Page 4 · response
    Published 4 May 2021

    Open published response
Back to top

Published response patterns

Compared with other recipients in reports included in PFD Monitor

Describes published response evidence, not performance.

Published responses found

100%
100%All other recipients 58%
0%100%

How actions were described at the time

This respondent
36%36%27%
All other recipients
47%25%27%<1%<1%
  • Completed
  • In progress
  • Planned
  • Unclear
  • Partially completed

Statuses reflect what recipients said at the time. PFD Monitor does not verify whether actions happened.

Types of action described in responses

Percentages use all actions described by each group. An action may have more than one type, so percentages do not total 100%.