Colin Neil Duncan MCCALLUM · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 21 May 2024•Cambridgeshire and Peterborough

Published report and response evidence

This report’s concerns and statements found in recipients’ published responses. Statements are included even where no link to an individual concern is recorded. A link shows an evidence connection; it does not assign responsibility.

View original report
Concerns
2

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
6

Described in responses

Recipients and published responses

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised2

  1. Failure to manage and monitor flooding and standing water on the road
    Part of recurring concern: Failure to reliably manage flooding and standing-water risks on roadsPart of recurring concern: Inadequate drainage control of hazardous surface water on public routes
  2. Failure to reassess the risk of flooding and standing water on the road
    Part of recurring concern: Failure to reliably manage flooding and standing-water risks on roads

Stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.6

  1. Cambridgeshire County Council

    Maintain a 40mph speed restriction on affected A1307 stretches.

  2. Cambridgeshire County Council

    Skim carriageway verges and clear roadside gullies.

  3. Cambridgeshire County Council

    Test and monitor the remediation works for effectiveness in removing flooding and surface-water risk.

  4. Cambridgeshire County Council

    Inspect the A1307 monthly and increase monitoring during heavy rainfall events.

  5. Cambridgeshire County Council

    Close the second A1307 carriageway lane at Hemingford when flooding is a risk.

  6. Cambridgeshire County Council

    Clear the French Drain, expose and assess its drainage pipe, undertake any necessary clearing or replacement, and reinstate the drainage media.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to manage and monitor flooding and standing water on the road

Wider context from the report

“I understand that responsibility for this stretch of road was passed to CCC by National Highways in Feb 2024. During the Inquest I heard evidence from National Highways Head Of Planning & Development (statement of ████████ attached). During the period Mar 2022 to Jul 2023 the Police were aware of 5 separate incidents on the stretch of the A1307 identified in ████████ statement where there had been personal injury or death to individuals caused after vehicles had hit patches of water before leaving the carriageway. I am concerned that unless the risk of flooding/standing water is reassessed and managed/monitored moving forward that there is a risk of future deaths occurring in circumstances similar to that of the current case. ”

Is this part of a recurring concern?

Yes — Failure to reliably manage flooding and standing-water risks on roads; Inadequate drainage control of hazardous surface water on public routes.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to reassess the risk of flooding and standing water on the road

Wider context from the report

“I understand that responsibility for this stretch of road was passed to CCC by National Highways in Feb 2024. During the Inquest I heard evidence from National Highways Head Of Planning & Development (statement of ████████ attached). During the period Mar 2022 to Jul 2023 the Police were aware of 5 separate incidents on the stretch of the A1307 identified in ████████ statement where there had been personal injury or death to individuals caused after vehicles had hit patches of water before leaving the carriageway. I am concerned that unless the risk of flooding/standing water is reassessed and managed/monitored moving forward that there is a risk of future deaths occurring in circumstances similar to that of the current case. ”

Is this part of a recurring concern?

Yes — Failure to reliably manage flooding and standing-water risks on roads.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Maintain a 40mph speed restriction on affected A1307 stretches.

Verbatim wording from the response

“The A1307 (former A14) was de-trunked on 8 February 2024 and control of the road transferred from National Highways to Cambridgeshire County Council on that date. On gaining control of the road, the County Council instigated an immediate speed restriction of 40mph on the affected stretches of the A1307 and introduced local traffic management so that the second lane of the dual carriageway at Hemingford is closed when there is a risk of flooding.”

Source location

Response from Cambridge County Council
Page 1 · response
Published 23 May 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Skim carriageway verges and clear roadside gullies.

Verbatim wording from the response

“A plan has been developed to remediate the issues that have been identified. Works are planned to commence in late July 2024 and should take 4 weeks to complete.”

Source location

Response from Cambridge County Council
Page 2 · response
Published 23 May 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Test and monitor the remediation works for effectiveness in removing flooding and surface-water risk.

Verbatim wording from the response

“These works will be tested and monitored for effectiveness to ensure that the actions undertaken have been successful in removing the flooding and surface water risk. Only when the Council is satisfied that the measures taken have removed this risk will the Council be able to remove the 40mph speed limit.”

Source location

Response from Cambridge County Council
Page 2 · response
Published 23 May 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Inspect the A1307 monthly and increase monitoring during heavy rainfall events.

Verbatim wording from the response

“The A1307 will be subject to monthly inspections by the Highways Inspector and the Local Highways Officer for the area, as well as enhanced monitoring when we experience heavy rainfall events.”

Source location

Response from Cambridge County Council
Page 2 · response
Published 23 May 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Close the second A1307 carriageway lane at Hemingford when flooding is a risk.

Verbatim wording from the response

“The A1307 (former A14) was de-trunked on 8 February 2024 and control of the road transferred from National Highways to Cambridgeshire County Council on that date. On gaining control of the road, the County Council instigated an immediate speed restriction of 40mph on the affected stretches of the A1307 and introduced local traffic management so that the second lane of the dual carriageway at Hemingford is closed when there is a risk of flooding.”

Source location

Response from Cambridge County Council
Page 1 · response
Published 23 May 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Clear the French Drain, expose and assess its drainage pipe, undertake any necessary clearing or replacement, and reinstate the drainage media.

Verbatim wording from the response

“A plan has been developed to remediate the issues that have been identified. Works are planned to commence in late July 2024 and should take 4 weeks to complete.”

Source location

Response from Cambridge County Council
Page 2 · response
Published 23 May 2024

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026