PFD report

Stephen Cloudsdale · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 3 Feb 2022•Cumbria

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
4

Raised in this report

Recipients
2

Named on the report

Responses found
1

Of 2 recipients

Stated actions
4

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised4

  1. Speed of traffic on the A66 stretch
  2. Insufficient central-reservation width for large vehicles
    Part of recurring concern: Inadequate central-reservation controls for errant vehiclesPart of recurring concern: Unsafe road width for vehicle passage
  3. Lack of lighting at the A66 dual carriageway crossing point
    Part of recurring concern: Inadequate and unreliable public-road street lightingPart of recurring concern: Inadequate outdoor safety lighting
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.1

  1. Action

    Implement upgraded junction, turning-vehicle and electronic warning signs, solar-powered road studs, and improved carriageway markings at Stainmore Café Services.

    Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 4 February 2022.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.4

  1. Position

    Road lighting cannot be justified on this A66 section because whole-life costs outweigh expected collision-reduction benefits.

    Stated by National HighwaysNo action considered necessaryThe respondent said that no further action was needed.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Speed of traffic on the A66 stretch

Wider context from the report

“1) The lack of lighting near to or at the point of the A66 dual carriageway where the collision occurred which renders the presence of vehicles crossing the carriageway from the café difficult to see by approaching drivers during the hours of darkness and/or during adverse weather conditions. 2) The lack of appropriately positioned signage, warning approaching drivers of the possibility of vehicles crossing the carriageway from the café. 3) The speed of traffic on this stretch of the A66. 4) The sufficiency of the width of the central reservation to accommodate large vehicles fully without the danger of encroaching into either of the opposing carriageways. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Insufficient central-reservation width for large vehicles

Wider context from the report

“1) The lack of lighting near to or at the point of the A66 dual carriageway where the collision occurred which renders the presence of vehicles crossing the carriageway from the café difficult to see by approaching drivers during the hours of darkness and/or during adverse weather conditions. 2) The lack of appropriately positioned signage, warning approaching drivers of the possibility of vehicles crossing the carriageway from the café. 3) The speed of traffic on this stretch of the A66. 4) The sufficiency of the width of the central reservation to accommodate large vehicles fully without the danger of encroaching into either of the opposing carriageways. ”

Is this part of a recurring concern?

Yes — Inadequate central-reservation controls for errant vehicles; Unsafe road width for vehicle passage.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Lack of lighting at the A66 dual carriageway crossing point

Wider context from the report

“1) The lack of lighting near to or at the point of the A66 dual carriageway where the collision occurred which renders the presence of vehicles crossing the carriageway from the café difficult to see by approaching drivers during the hours of darkness and/or during adverse weather conditions. 2) The lack of appropriately positioned signage, warning approaching drivers of the possibility of vehicles crossing the carriageway from the café. 3) The speed of traffic on this stretch of the A66. 4) The sufficiency of the width of the central reservation to accommodate large vehicles fully without the danger of encroaching into either of the opposing carriageways. ”

Is this part of a recurring concern?

Yes — Inadequate and unreliable public-road street lighting; Inadequate outdoor safety lighting.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Lack of appropriately positioned warning signage for vehicles crossing from the café

Wider context from the report

“1) The lack of lighting near to or at the point of the A66 dual carriageway where the collision occurred which renders the presence of vehicles crossing the carriageway from the café difficult to see by approaching drivers during the hours of darkness and/or during adverse weather conditions. 2) The lack of appropriately positioned signage, warning approaching drivers of the possibility of vehicles crossing the carriageway from the café. 3) The speed of traffic on this stretch of the A66. 4) The sufficiency of the width of the central reservation to accommodate large vehicles fully without the danger of encroaching into either of the opposing carriageways. ”

Is this part of a recurring concern?

Yes — Inadequate road warning signage.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Implement upgraded junction, turning-vehicle and electronic warning signs, solar-powered road studs, and improved carriageway markings at Stainmore Café Services.

Verbatim wording from the response

“National Highways is already in the process of promoting a focused improvement scheme in the immediate area of Stainmore Café Services which includes upgraded traffic signs and associated road markings. The scheme includes interactive electronic, vehicle activated signs that warn approaching drivers of both the junctions and vehicles turning. The scheme is on course to deliver the improvements by the end of October 2022.”

Source location

Response from National Highways Ltd
Page 1 · response
Published 4 February 2022

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Road lighting cannot be justified on this A66 section because whole-life costs outweigh expected collision-reduction benefits.

Verbatim wording from the response

“Having assessed the site, we have concluded that road lighting cannot be justified along this section of the A66 trunk road when applying the requirements of the Design Manual for Roads and Bridges Road Lighting Appraisal guidance TA 501 (formerly TA 49/07). This is based upon the whole life costs of installation, maintenance and power over a 30-year period, offset against the potential benefits in terms of collision savings and therefore no action is proposed. It is also counterproductive to light short sections of an otherwise unlit carriageway as drivers eyesight reacts and adjusts to changes in lighting levels.”

Source location

Response from National Highways Ltd
Page 2 · response
Published 4 February 2022

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The existing speed limits are considered appropriate for this type of road.

Verbatim wording from the response

“c. Speed of the traffic”

Source location

Response from National Highways Ltd
Page 2 · response
Published 4 February 2022

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

General widening of the central reservation is not feasible because it would require extensive carriageway realignment and is complicated by adjacent land levels.

Verbatim wording from the response

“General widening of the central reserve area is not feasible as it would require the realignment of a considerable length of the mainline carriageway, to both the east and west of the café site. This being further complicated by the varying vertical levels of the adjacent agricultural land to the south. We believe that the proposed electronic, interactive signing will increase driver awareness of the operation of the junction and the café exit and specifically the presence of turning vehicles crossing the central reserve.”

Source location

Response from National Highways Ltd
Page 3 · response
Published 4 February 2022

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Enforcement of the A66 speed limit is a matter for the police.

Verbatim wording from the response

“The proposed improvements in the immediate area of the café are expected to have a positive impact on general vehicle speeds along the approaches to the service area. It is for drivers to comply with the speed limit in place on the road and the enforcement of the speed limit is a matter for the police.”

Source location

Response from National Highways Ltd
Page 2 · response
Published 4 February 2022

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.3

  1. 1

    Secure funding for a wider cross-authority study to identify potential mitigations and facility-upgrade opportunities along the A66 Northern Trans Pennine route.

    Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 4 February 2022.
  2. 2

    Carry out A66 Stainmore enabling works.

    Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 4 February 2022.
  3. 3

    Resurface the A66 at Stainmore.

    Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 4 February 2022.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Secure funding for a wider cross-authority study to identify potential mitigations and facility-upgrade opportunities along the A66 Northern Trans Pennine route.

Verbatim wording from the response

“National Highways are currently progressing a major projects improvement scheme along the A66 Northern Trans Pennine route. Whilst these works do not include the section of the A66 at Stainmore, we are looking to secure funding for a wider study that would include Cumbria County Council and North Yorkshire County Council, to help in identifying potential mitigations and opportunities that may benefit residents, communities and drivers who would be impacted by the construction of the Trans Pennine scheme. Identifying potential opportunities for upgrading facilities will be included in the scope of the wider study.”

Source location

Response from National Highways Ltd
Page 2 · response
Published 4 February 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Carry out A66 Stainmore enabling works.

Verbatim wording from the response

“April 2022 A66 Stainmore enabling works 26 Sep to 14 Oct 2022 A66 Stainmore resurfacing 17 Oct to 28 Oct 2022 Stainmore Services Sign / markings improvement scheme”

Source location

Response from National Highways Ltd
Page 2 · response
Published 4 February 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Resurface the A66 at Stainmore.

Verbatim wording from the response

“April 2022 A66 Stainmore enabling works 26 Sep to 14 Oct 2022 A66 Stainmore resurfacing 17 Oct to 28 Oct 2022 Stainmore Services Sign / markings improvement scheme”

Source location

Response from National Highways Ltd
Page 2 · response
Published 4 February 2022

Open published response
Back to top