Susan Barbara HENDERSON and Margaret Louise SHAW · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 30 May 2019•Milton Keynes

Published report and response evidence

This report’s concerns and statements found in recipients’ published responses. Statements are included even where no link to an individual concern is recorded. A link shows an evidence connection; it does not assign responsibility.

View original report
Concerns
1

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
4

Described in responses

Recipients and published responses

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised1

  1. Failure of road inspections to identify drain problems
    Part of recurring concern: Unreliable highway inspection and asset-recording processes

Stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.4

  1. National Highways

    Move all Asset Support Contract areas to the Asset Delivery approach.

  2. National Highways

    Complete a review of inspection requirements and processes across the Strategic Road Network, including the speed of driven inspections.

  3. National Highways

    Issue a memorandum to all Areas highlighting recessed-gully locations, defect-recording methods, possible renewal of non-standard gullies, and communication of defects to Local Authorities.

  4. National Highways

    Move Area 8 from Asset Support Contract arrangements to the Asset Delivery approach, with inspections undertaken in-house by Highways England staff.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.2

  1. National Highways

    Local authorities are responsible for sweeping and cleaning all-purpose trunk roads, while Highways England communicates relevant defects to them.

    Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
  2. National Highways

    Existing risk-based inspection requirements and processes are considered consistent and sufficient, so no changes are proposed beyond the Asset Delivery transition.

    Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure of road inspections to identify drain problems

Wider context from the report

“During the course of the evidence I heard how the roads are examined and monitored on a regular basis but that such inspections are conducted at speed and that the process failed to identify the problem with this particular drain on the A5. I believe that the process for inspection should be reviewed. ”

Is this part of a recurring concern?

Yes — Unreliable highway inspection and asset-recording processes.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Move all Asset Support Contract areas to the Asset Delivery approach.

Verbatim wording from the response

“From July 2022 all Asset Support Contract areas will have moved over to Asset Delivery.”

Source location

Response from Highways England
Page 3 · response
Published 14 August 2019

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Complete a review of inspection requirements and processes across the Strategic Road Network, including the speed of driven inspections.

Verbatim wording from the response

““During the course of the evidence I heard how the roads are examined and monitored on a regular basis but that such inspections are conducted at speed and that the process failed to identify the problem with this particular drain on the A5. I believe that the process for inspection should be reviewed.””

Source location

Response from Highways England
Page 2 · response
Published 14 August 2019

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Issue a memorandum to all Areas highlighting recessed-gully locations, defect-recording methods, possible renewal of non-standard gullies, and communication of defects to Local Authorities.

Verbatim wording from the response

“Following the review of inspection requirements and processes Highways England has decided to issue a memorandum to all our Areas to highlight the importance of:”

Source location

Response from Highways England
Page 3 · response
Published 14 August 2019

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Move Area 8 from Asset Support Contract arrangements to the Asset Delivery approach, with inspections undertaken in-house by Highways England staff.

Verbatim wording from the response

“From the 1st October 2019 Area 8 will be moving from the current Asset Support Contract arrangements to the new Asset Delivery approach. Asset Delivery inspections will be undertaken in-house by Highways England staff.”

Source location

Response from Highways England
Page 3 · response
Published 14 August 2019

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Local authorities are responsible for sweeping and cleaning all-purpose trunk roads, while Highways England communicates relevant defects to them.

Verbatim wording from the response

“• Communicating defects to Local Authorities as the body responsible for the sweeping and cleaning of All Purpose Trunk Roads.”

Source location

Response from Highways England
Page 4 · response
Published 14 August 2019

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Existing risk-based inspection requirements and processes are considered consistent and sufficient, so no changes are proposed beyond the Asset Delivery transition.

Verbatim wording from the response

“Highways England’s review of the inspection requirements and processes used by Highways England’s Areas and Regions, and our supply chain, concluded they had a common risk based approach, and were understood by inspectors and applied consistently. Therefore, there are no proposals to change the requirements and processes.”

Source location

Response from Highways England
Page 4 · response
Published 14 August 2019

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations