PFD report

Sonny Bob Parmar · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 24 Mar 2020•North London

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
1

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
4

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised1

  1. Lack of speed limitation on the road adjacent to the school during child arrival and departure times
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.1

  1. Action

    Install vehicle-activated signs reminding drivers of the existing 30mph speed limit.

    Stated by London Borough of BarnetStated completedThe respondent said that this action was complete when they made their response on 9 April 2020.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.2

  1. Position

    A reduced speed limit at this crossing is not considered appropriate because it is isolated from schools and one of several local pedestrian crossings.

    Stated by London Borough of BarnetNo action considered necessaryThe respondent said that no further action was needed.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Lack of speed limitation on the road adjacent to the school during child arrival and departure times

Wider context from the report

“That there is no limitation for the speed of the road adjacent to the curtilage of the school as is seen in other areas where traffic is slowed at times where children are arriving and leaving the school. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install vehicle-activated signs reminding drivers of the existing 30mph speed limit.

Verbatim wording from the response

“We note that renewal of anti-skid surfacing on the approaches to the pedestrian crossing at the scene of the collision was undertaken over the weekend 30 November to 1 December 2019 and vehicle activated signs to remind drivers of the existing 30mph speed limit have been installed in April 2020. Work has also now been programmed to remove the redundant dropped kerb and provide additional guard rail panels at this location. This has taken longer than originally anticipated, but is now programmed to commence 16 June 2020.”

Source location

2020-0075-Response-from-Barnet-Council_Redacted-1
Page 3 · response
Published 9 April 2020

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

A reduced speed limit at this crossing is not considered appropriate because it is isolated from schools and one of several local pedestrian crossings.

Verbatim wording from the response

“We consider that introduction of a reduced speed limit local to this particular crossing in isolation is not appropriate given that it is only one of a series of pedestrian crossing locations in East End Road and elsewhere in the local area, all of which are situated a moderate distance from schools.”

Source location

2020-0075-Response-from-Barnet-Council_Redacted-1
Page 1 · response
Published 9 April 2020

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

A signed 20mph limit cannot be expected to achieve adequate compliance on East End Road without additional measures, risking a false sense of security.

Verbatim wording from the response

“Where a 20mph speed limit is being considered the type of provision made is informed by regulations and guidance regarding the suitability of different approaches.”

Source location

2020-0075-Response-from-Barnet-Council_Redacted-1
Page 2 · response
Published 9 April 2020

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.3

  1. 1

    Renew anti-skid surfacing on approaches to the pedestrian crossing.

    Stated by London Borough of BarnetStated completedThe respondent said that this action was complete when they made their response on 9 April 2020.
  2. 2

    Continue monitoring the collision location.

    Stated by London Borough of BarnetStated completedThe respondent said that this action was complete when they made their response on 9 April 2020.
  3. 3

    Remove the redundant dropped kerb and provide additional guardrail panels at the collision location.

    Stated by London Borough of BarnetStated plannedThe respondent said that this action was planned when they made their response on 9 April 2020.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Renew anti-skid surfacing on approaches to the pedestrian crossing.

Verbatim wording from the response

“We note that renewal of anti-skid surfacing on the approaches to the pedestrian crossing at the scene of the collision was undertaken over the weekend 30 November to 1 December 2019 and vehicle activated signs to remind drivers of the existing 30mph speed limit have been installed in April 2020. Work has also now been programmed to remove the redundant dropped kerb and provide additional guard rail panels at this location. This has taken longer than originally anticipated, but is now programmed to commence 16 June 2020.”

Source location

2020-0075-Response-from-Barnet-Council_Redacted-1
Page 3 · response
Published 9 April 2020

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue monitoring the collision location.

Verbatim wording from the response

“Most transport funding in Barnet is provided by Transport for London to support the borough’s Local Implementation Plan of the Mayor’s Transport Strategy. Given the current public health emergency caused by Covid-19 this provision has been paused, with funding being focused on Covid-19 response provisions. We nevertheless expect to complete the adjustments to the dropped kerb and guardrail and will continue to monitor the location going forward.”

Source location

2020-0075-Response-from-Barnet-Council_Redacted-1
Page 3 · response
Published 9 April 2020

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Remove the redundant dropped kerb and provide additional guardrail panels at the collision location.

Verbatim wording from the response

“We note that renewal of anti-skid surfacing on the approaches to the pedestrian crossing at the scene of the collision was undertaken over the weekend 30 November to 1 December 2019 and vehicle activated signs to remind drivers of the existing 30mph speed limit have been installed in April 2020. Work has also now been programmed to remove the redundant dropped kerb and provide additional guard rail panels at this location. This has taken longer than originally anticipated, but is now programmed to commence 16 June 2020.”

Source location

2020-0075-Response-from-Barnet-Council_Redacted-1
Page 3 · response
Published 9 April 2020

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026