PFD report

Albert Thomas Stafford Manley · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 30 May 2022•Wiltshire and Swindon

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
2

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
3

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised2

  1. Failure to maintain chevron signage at the Tollard Green bend
    Part of recurring concern: Inadequate road warning signage
  2. Failure to make the Tollard Green junction and bend sufficiently distinguishable to approaching motorists
    Part of recurring concern: Inadequate control of recurring collision risks at hazardous road locationsPart of recurring concern: Inadequate safety controls at high-risk road junctionsPart of recurring concern: Unsafe road design and layout
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.3

  1. Action

    Continue monitoring the hedgerow situation alongside the highway and landowner responsibilities.

    Stated by Wiltshire CouncilStated in progressThe respondent said that this action was in progress when they made their response on 16 September 2022.
  2. Action

    Assess the site and review existing traffic-sign arrangements through experienced road-safety professionals.

    Stated by Wiltshire CouncilStated completedThe respondent said that this action was complete when they made their response on 16 September 2022.
  3. Action

    Add “SLOW” road markings to the Council’s road-marking programme for delivery in the coming months.

    Stated by Wiltshire CouncilStated plannedThe respondent said that this action was planned when they made their response on 16 September 2022.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.1

  1. Position

    Existing road signs accurately represent the layout and hazards, so no further amendments are proposed.

    Stated by Wiltshire CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to maintain chevron signage at the Tollard Green bend

Wider context from the report

“Although I was unable to make a finding of fact in this case Jim more likely than not misunderstood the road lay out, I was satisfied that it was a possibility and I am concerned that a driver who is unfamiliar with that road section could read the road incorrectly taking into account what they physically see and having regard to the road signs approaching the junction, leading to such a misunderstanding. The national speed limit on this section of road is, of course, 60 mph and every driver have a duty to drive at a speed commensurate with road conditions and additionally owes a duty of care to other road users in terms of driving carefully and considerately. How is it possible to misread the road? In answering that question, see figure 1 below, is a photograph of the view using Google Earth cameras approaching the junction heading in the same south easterly direction that Jim would have been travelling. Fig.1 At approximately 200 metres from the junction is a very clear sign (above) highlighting the junction with the main B3081 continuing left to Tollard Royal and the road leading off to Tollard Green. In the photograph in the road ahead depending on the type of vehicle being driven and its position you can see a left-hand bend ahead of you. The visible bend is in fact a left hand bend once you have left the B3081 and is part of the road heading towards Tollard Green. It is not the junction bend on careful analysis. The next photograph at figure 2 shows a sign for tourist and information purposes which lies approximately 85 metres from the junction with Tollard Green. You can however see the bend ahead which again is the bend beyond the junction and is not the Tollard Green, Tollard Royal junction which is still hidden. Fig2 In Fig3 below a chevron sign at the time of the collision was missing on the sign post to the right of the highway but this sign together with the road markings have now been replaced/refreshed. As a driver myself the chevron markings would be of more assistance to a driver at night time although, of course, they would be visible in the day time but due to size to a lesser degree. At night, the reflective paint differentiating between black and white in my personal view would make the sign more obvious especially when headlights would be unlikely to pick up he Tollard Green bend ahead. Fig 3 In considering my duty to make a report to prevent future deaths I had a report prepared for ████████ from Wiltshire Police (copy attached) and in that report he documented a previous collision history in the last 5 years and in particular 2 incidents, 1 occurring in 2017 and the other in 2018, both of which involved vehicles turning right at the junction to Tollard Green. One incident involved a car and a motorcycle, the other involving a car and a van. I also heard evidence from ████████ who has lived in the area for a number of years that the route to via Tollard Green into Verwood and Bournemouth is used by many as a back road in respect of which he described it as “a rat run” and cars apparently do not necessarily slow to any great degree when exiting that junction from a south easterly direction. ████████ in his report makes 2 recommendations, one of which is to remove the hedgerow to the left to increase visibility around the bend. That recommendation, I have to say, is of some concern to me as I do not think that it would tempt drivers to slow down to any degree and they would be more likely in looking across to look for oncoming traffic and may not always pick up smaller vehicles such a cyclist and motorcycle users when looking to exit the junction heading towards Tollard Green. That recommendation is also of concern to me because Wiltshire at the end of the day is a rural county and its hedgerows and the wildlife contained within the hedgerows are an important feature of its character. I also heard evidence of one of our Coroners Officers, ████████, who commented that the hedgerows had an additional purpose in trying to prevent deer which are a feature in this particular area leaving the fields and crossing the roads. He acquired this information when he was a serving Police Officer and from speaking to one of the nearby landowners. Deer crossing road especially at night can pose a dangerous and unexpected hazard. As regards the second recommendation from ████████, this maybe something that you might be willing to consider or whether there perhaps is a better way through the use of further signing to make it even clearer as regards the existence of the junction and the bend. In asking you to consider painting the word “SLOW” as you approach the bend in both directions as recommended by ████████, I am mindful of the fact that as the highway authority you are under no obligation to provide such warnings as was pointed out by the House of Lords in the 2003 Decision in “Gorringe”. I am however concerned that there is a possibility that the road could be misread and that the bend having exited the junction heading towards Tollard Green could be mistaken by motorist unfamiliar with this section of the road, be confused with the bend and the junction on the B3081 heading towards Tollard Royal. The bend having exited the junction heading towards Tollard Green is very similar in shape to the bend heading towards Tollard Royal which is hidden until you get very close to it. I can see the propensity for a mistake being made here even if it is a mistake that I myself, I hope, would not make and I would ask you to consider if there is anything further that could be done to warn of this junction and bend to further minimise the possibility of any misunderstanding being made by road users if you are minded not to adopt ████████ recommendation. ”

Is this part of a recurring concern?

Yes — Inadequate road warning signage.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to make the Tollard Green junction and bend sufficiently distinguishable to approaching motorists

Wider context from the report

“Although I was unable to make a finding of fact in this case Jim more likely than not misunderstood the road lay out, I was satisfied that it was a possibility and I am concerned that a driver who is unfamiliar with that road section could read the road incorrectly taking into account what they physically see and having regard to the road signs approaching the junction, leading to such a misunderstanding. The national speed limit on this section of road is, of course, 60 mph and every driver have a duty to drive at a speed commensurate with road conditions and additionally owes a duty of care to other road users in terms of driving carefully and considerately. How is it possible to misread the road? In answering that question, see figure 1 below, is a photograph of the view using Google Earth cameras approaching the junction heading in the same south easterly direction that Jim would have been travelling. Fig.1 At approximately 200 metres from the junction is a very clear sign (above) highlighting the junction with the main B3081 continuing left to Tollard Royal and the road leading off to Tollard Green. In the photograph in the road ahead depending on the type of vehicle being driven and its position you can see a left-hand bend ahead of you. The visible bend is in fact a left hand bend once you have left the B3081 and is part of the road heading towards Tollard Green. It is not the junction bend on careful analysis. The next photograph at figure 2 shows a sign for tourist and information purposes which lies approximately 85 metres from the junction with Tollard Green. You can however see the bend ahead which again is the bend beyond the junction and is not the Tollard Green, Tollard Royal junction which is still hidden. Fig2 In Fig3 below a chevron sign at the time of the collision was missing on the sign post to the right of the highway but this sign together with the road markings have now been replaced/refreshed. As a driver myself the chevron markings would be of more assistance to a driver at night time although, of course, they would be visible in the day time but due to size to a lesser degree. At night, the reflective paint differentiating between black and white in my personal view would make the sign more obvious especially when headlights would be unlikely to pick up he Tollard Green bend ahead. Fig 3 In considering my duty to make a report to prevent future deaths I had a report prepared for ████████ from Wiltshire Police (copy attached) and in that report he documented a previous collision history in the last 5 years and in particular 2 incidents, 1 occurring in 2017 and the other in 2018, both of which involved vehicles turning right at the junction to Tollard Green. One incident involved a car and a motorcycle, the other involving a car and a van. I also heard evidence from ████████ who has lived in the area for a number of years that the route to via Tollard Green into Verwood and Bournemouth is used by many as a back road in respect of which he described it as “a rat run” and cars apparently do not necessarily slow to any great degree when exiting that junction from a south easterly direction. ████████ in his report makes 2 recommendations, one of which is to remove the hedgerow to the left to increase visibility around the bend. That recommendation, I have to say, is of some concern to me as I do not think that it would tempt drivers to slow down to any degree and they would be more likely in looking across to look for oncoming traffic and may not always pick up smaller vehicles such a cyclist and motorcycle users when looking to exit the junction heading towards Tollard Green. That recommendation is also of concern to me because Wiltshire at the end of the day is a rural county and its hedgerows and the wildlife contained within the hedgerows are an important feature of its character. I also heard evidence of one of our Coroners Officers, ████████, who commented that the hedgerows had an additional purpose in trying to prevent deer which are a feature in this particular area leaving the fields and crossing the roads. He acquired this information when he was a serving Police Officer and from speaking to one of the nearby landowners. Deer crossing road especially at night can pose a dangerous and unexpected hazard. As regards the second recommendation from ████████, this maybe something that you might be willing to consider or whether there perhaps is a better way through the use of further signing to make it even clearer as regards the existence of the junction and the bend. In asking you to consider painting the word “SLOW” as you approach the bend in both directions as recommended by ████████, I am mindful of the fact that as the highway authority you are under no obligation to provide such warnings as was pointed out by the House of Lords in the 2003 Decision in “Gorringe”. I am however concerned that there is a possibility that the road could be misread and that the bend having exited the junction heading towards Tollard Green could be mistaken by motorist unfamiliar with this section of the road, be confused with the bend and the junction on the B3081 heading towards Tollard Royal. The bend having exited the junction heading towards Tollard Green is very similar in shape to the bend heading towards Tollard Royal which is hidden until you get very close to it. I can see the propensity for a mistake being made here even if it is a mistake that I myself, I hope, would not make and I would ask you to consider if there is anything further that could be done to warn of this junction and bend to further minimise the possibility of any misunderstanding being made by road users if you are minded not to adopt ████████ recommendation. ”

Is this part of a recurring concern?

Yes — Inadequate control of recurring collision risks at hazardous road locations; Inadequate safety controls at high-risk road junctions; Unsafe road design and layout.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue monitoring the hedgerow situation alongside the highway and landowner responsibilities.

Verbatim wording from the response

“I note the recommendations within the Police report regarding the removal of the hedgerow and your observations on the matter. The hedgerow is outside of the highway boundary and is the responsibility of the landowner, and at present it is not proposed to suggest the removal of the hedgerow for the reasons you mention, but we will continue to monitor the situation and enter discussion with the landowner if deemed necessary in the future.”

Source location

Response from Wilshire Council
Page 2 · response
Published 16 September 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Assess the site and review existing traffic-sign arrangements through experienced road-safety professionals.

Verbatim wording from the response

“Following your suggestion that consideration be given to the introduction of further road markings and review of the current signing arrangements, I can advise the site has been visited by experienced road safety professionals with these comments in mind.”

Source location

Response from Wilshire Council
Page 1 · response
Published 16 September 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Add “SLOW” road markings to the Council’s road-marking programme for delivery in the coming months.

Verbatim wording from the response

“With regards to your other observation that the existing signing could be supplemented using road markings depicting the characters ‘SLOW’, this is something that is considered to be appropriate and would be beneficial in assisting motorists to negotiate this section of road. I confirm that this work will be added to the Council’s road marking programme of works for the coming months.”

Source location

Response from Wilshire Council
Page 1 · response
Published 16 September 2022

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Existing road signs accurately represent the layout and hazards, so no further amendments are proposed.

Verbatim wording from the response

“Whilst the observations regarding the traffic signs are appreciated, the review has concluded that the existing sign arrangements are representative of the road layout and offer motorists the correct information of the hazards they should expect when negotiating this section of road. Therefore, no further amendments to the road signs are proposed.”

Source location

Response from Wilshire Council
Page 1 · response
Published 16 September 2022

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.2

  1. 1

    The hedgerow is the landowner’s responsibility, so removal is not currently proposed by the council.

    Stated by Wiltshire CouncilRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
  2. 2

    The hedgerow lies outside the highway boundary, so its removal is not treated as the council’s responsibility.

    Stated by Wiltshire CouncilOutside remitThe respondent said that this matter was outside its role or authority.

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The hedgerow is the landowner’s responsibility, so removal is not currently proposed by the council.

Verbatim wording from the response

“I note the recommendations within the Police report regarding the removal of the hedgerow and your observations on the matter. The hedgerow is outside of the highway boundary and is the responsibility of the landowner, and at present it is not proposed to suggest the removal of the hedgerow for the reasons you mention, but we will continue to monitor the situation and enter discussion with the landowner if deemed necessary in the future.”

Source location

Response from Wilshire Council
Page 2 · response
Published 16 September 2022

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The hedgerow lies outside the highway boundary, so its removal is not treated as the council’s responsibility.

Verbatim wording from the response

“I note the recommendations within the Police report regarding the removal of the hedgerow and your observations on the matter. The hedgerow is outside of the highway boundary and is the responsibility of the landowner, and at present it is not proposed to suggest the removal of the hedgerow for the reasons you mention, but we will continue to monitor the situation and enter discussion with the landowner if deemed necessary in the future.”

Source location

Response from Wilshire Council
Page 2 · response
Published 16 September 2022