Recurring concern
Ineffective controls preventing access to railway tracks
First reported 27 May 2015•Latest report 4 Mar 2024
What this concern includes
Includes failures of controls specifically dedicated to preventing or restricting access to railway tracks, including physical barriers or mitigation measures and responses to identified railway-access risks or recommended remedial actions.
Not included
- Excludes generic failures in investigation, documentation, training, staffing or governance unless they are directly tied to a dedicated railway-track-access control.
- Excludes railway hazards unrelated to preventing access to the tracks.
- Excludes general infrastructure or highway safety deficiencies that do not concern access to railway tracks.
- Reports
- 24
- Individual concerns
- 31
- Date range
- 2015–2024
- Stated actions
- 60
Distinct published reports
A report can raise multiple concerns
First to latest report issue date
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
-
Concerns raised1
Inadequate physical barriers at the railway access gate
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
-
Concerns raised1
Failure to restrict public access to the railway
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
-
Action
Replace the old footbridge with a safer structure incorporating standard-height railings, an encased railway span, ramps, safer pedestrian exits and no mid-elevation turnback.
Stated by Network Rail Infrastructure Limited -
Action
Install three-metre acoustic fencing with anti-climb extensions along both sides of the track and adjacent to Mottistord Road.
Stated by Network Rail Infrastructure Limited -
Action
Install anti-climb guards above the footbridge railings at the steps, ramps and main span.
Stated by Network Rail Infrastructure Limited
-
Action
Remove old building materials from beneath the footbridge.
Stated by Network Rail Infrastructure Limited
-
Concerns raised1
Inadequate restriction of public access to the railway track from the steps accessing footbridge 57
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
-
Action
Install shorter palisade pales on the lower flight to connect with the boundary fence and raise the parapet to at least two metres.
Stated by Network Rail Infrastructure Limited -
Action
Raise the upper-flight stepped parapet with engineering brick and bullnose units to prevent scaling and access behind the lower-flight palisade.
Stated by Network Rail Infrastructure Limited
-
Concerns raised1
Failure of after-hours station and track access barriers to prevent access
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Action
Install barriers to separate rail infrastructure where access is unnecessary, including fencing SouthEastern infrastructure from LOROL infrastructure at the station.
Stated by Network Rail Infrastructure Limited
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
-
Position
Station access and management are outside the infrastructure owner's management because the station is operated by the train operator.
Stated by Network Rail Infrastructure Limited
-
Position
Responsibility for station access information and practices rests with the station operator, which provided the relevant clarification.
Stated by Network Rail Infrastructure Limited
Data last updated 7 September 2026