Includes deficiencies in the width or directly associated constrained geometry of roads, tracks or carriageways where the condition creates a material risk that vehicles will leave the roadway, collide or otherwise be unable to travel safely; include the anchor's extremely narrow bridleway and comparable narrow carriageways.
What is not included
Excludes barriers, gates, lighting, visibility, markings, speed limits and other controls unless insufficient road width is itself the unsafe condition.
Excludes generic road hazards or poor design where inadequate width or constrained carriageway geometry is not identified.
Excludes pedestrian, cycleway and shared-path narrowness unless the assertion specifically concerns vehicle passage.
Excludes the underlying outcome of a collision or vehicle departure without an identified unsafe road-width condition.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
National Highways2
Cumbria County Council1
Department for Transport1
Dorset Council1
Dorset Highways Department1
Kent County Council1
Peak District National Park Authority1
Staffordshire County Council1
Welsh Government1
English county council3
National road infrastructure body2
Devolved government1
English unitary authority1
Ministerial department1
Other public body1
Sub-organisation1
Reports and published responses 7 reports
See individual reports that have raised this concern, and the actions taken in response
Cumbria
Concerns raised1
Insufficient central-reservation width for large vehicles
This report raised 3 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
National Highways
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
National Highways
General widening of the central reservation is not feasible because it would require extensive carriageway realignment and is complicated by adjacent land levels.
Unable to actThe respondent said that a constraint prevented them from taking the relevant action.
Birmingham and Solihull
Concerns raised1
Restricted ability for vehicles to pull fully out of the live lane
This report raised 9 other concerns. They are not shown here because they do not form part of this recurring concern.
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Carmarthenshire and Pembrokeshire
Concerns raised1
Insufficient length and width of both filter lanes on the A40
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Dorset
Concerns raised1
Narrow entrance to Howards Lane causing cars to cut the corner
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
Dorset County Council
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Dorset County Council
Erect a marker post in the footway to prevent vehicles from overrunning it when turning into Howard’s Lane.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Dorset County Council
The fatal site investigation found no highway-related factors contributed to the fatality.
Disputes the concernThe respondent disagreed with part of the concern or the basis for it.
Mid Kent and Medway
Concerns raised1
Narrow carriageway
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
Kent County Council
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Kent County Council
Programme a scheme to reduce the road’s speed limit to 50 mph.
Stoke-on-Trent and North Staffordshire
Concerns raised1
Narrow two-lane road with houses in close proximity
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Derby and Derbyshire
Concerns raised1
Extremely narrow and acute bridleway track
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
Peak District National Park Authority
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.6
Peak District National Park Authority
Notify relevant organisations and residents about identified safety issues and seek their input and required consents for proposed works.
Peak District National Park Authority
Commission and complete a survey assessing river-bank stability, hydrological issues, track widening, and potential safety engineering measures.
Peak District National Park Authority
Develop a detailed works specification by appointing replacement specialist engineering expertise and coordinating required safety, gabion, and design input.
Peak District National Park Authority
Commission technical tender documents and invite at least three appropriately qualified contractors to bid for the proposed works.
Peak District National Park Authority
Continue pursuing required consents from partners during specification development and tendering.
Peak District National Park Authority
Investigate external funding streams and liaise with Derbyshire County Council about incorporating the proposed safety works into its programme.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.