Recurring concern
Inadequate suicide-prevention signage at railway stations
- Reports that mention this concern
- 2
- Times this concern has been raised
- 2
- Stated actions linked to this concern
- 3
What this concern includes
Includes failures of signage at railway stations specifically intended to provide suicide-prevention or Samaritan support information, including absent, insufficient, poorly positioned, obscured, outdated or inadequately reviewed signs.
What is not included
- Excludes general railway warning, live-rail, trespass, wayfinding or emergency-assistance signage unless it is specifically intended to provide suicide-prevention or Samaritan support information.
- Excludes generic station communication, public announcements, CCTV or staff-response deficiencies where suicide-prevention signage is not the identified unsafe condition.
- Excludes suicide-prevention information outside railway stations unless the assertion explicitly supports the same railway-station signage process.
- Excludes failures in the quality of suicide-prevention services or crisis response where the signage control itself is not deficient.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Reports and published responses 2 reports
See individual reports that have raised this concern, and the actions taken in response
-
Concerns raised1
Lack of Samaritan signs at the train station
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
- SWR
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
SWR
Complete a route-wide review of Samaritan signage placement, condition and displayed contact information.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.3
-
SWR
Existing Samaritan signage was reviewed and assessed as sufficient, so no additional signs are intended at Bracknell station.
-
SWR
Samaritan signage cannot be increased unilaterally without consultation and consent from the Samaritans.
-
SWR
Bracknell was not considered a priority location and had no prevalence of unauthorised access, suicide or suicide attempts.
-
Concerns raised1
Failure to review and update Samaritan signage around the station
This report raised 5 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
- WM Trains Limited
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
-
WM Trains Limited
Review station Samaritans signage against current rail industry guidance.
-
WM Trains Limited
Remove the outdated Samaritans sign between platforms 2 and 3.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.
Data last updated 7 September 2026