Inadequate control of recurring collision risks at hazardous road locations
First reported 13 Jan 2014•Latest report 6 May 2025
What this concern includes
Includes reports identifying a recurring or established collision hazard at a road location together with inadequate, absent or ineffective dedicated controls, including repeated collision patterns, inadequate visibility, hazardous layout, insufficient separation, warnings, markings, crossings or comparable road-safety measures.
Not included
- Excludes isolated collisions or factual road accidents where no recurring hazard or deficient road-safety control is identified.
- Excludes generic highway maintenance, lighting, signage, drainage or road-design deficiencies unless they are directly linked to recurring collision risk at a hazardous road location.
- Excludes condition-specific road hazards already bounded by a more specific supported concern, such as slippery steep bends, inadequate road sight distance or pedestrian-crossing safety, when that narrower hazard is the asserted shared unsafe condition.
- Excludes driver misconduct or individual road-user error where no continuing hazard or control deficiency at the road location is identified.
- Reports
- 20
- Individual concerns
- 23
- Date range
- 2014–2025
- Stated actions
- 70
Distinct published reports
A report can raise multiple concerns
First to latest report issue date
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
-
Concerns raised1
Hazardous road layout at Loscombe Crossroads
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Dorset Council, as the traffic authority, is responsible for decisions about road design, speed limits, traffic calming and road network management.
Stated by Department for Transport
-
Concerns raised1
Hazardous difficulty manoeuvring at the junction of St Johns Road, Tiffield and the A43 Northamptonshire
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
-
Action
Carry out planned summer 2025 minor surfacing works, including refreshed eastbound road markings and reflective road studs through the junction.
Stated by National Highways -
Action
Investigate including vegetation clearance in the summer 2025 works to improve visibility at the junction.
Stated by National Highways -
Action
Develop and construct the 2026 A43 renewals scheme, including carriageway resurfacing, line-marking repainting and replacement reflective road studs through to St John’s Road junction.
Stated by National Highways
-
Action
Investigate potential junction improvements, such as signage, as part of the A43 renewals scheme scoping.
Stated by National Highways
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
The junction does not rank highly as a safety problem location, so detailed investigations for a potential safety improvement scheme have not been prioritised.
Stated by National Highways
-
Concerns raised1
Roadside mature trees creating an immediate vehicle-collision hazard
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
-
Action
Initiate the statutory process to extend the 30mph speed limit along approximately 800 metres of the A374 Embankment Road.
Stated by Plymouth City Council -
Action
Remove specified trees beside the north-east carriageway and reconstruct approximately 450 metres of the carriageway and footway.
Stated by Plymouth City Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Trees on the south-west carriageway are not considered a significant collision risk because of existing lower speeds, junction conditions and a safety camera.
Stated by Plymouth City Council
-
Concerns raised1
Slip-road geometry allowing wrong-way vehicles to enter and build up considerable speed
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
-
Action
Complete a full safety review of the junction against the current Wrong Way Driving: Mitigation Toolkit.
Stated by National Highways -
Action
Undertake further work to assess junction capacity and whether the A5 off-slip bell-mouth width can be reduced with hatched markings.
Stated by National Highways -
Action
Reinspect the site after the incident and investigate whether an immediate safety hazard exists.
Stated by Milton Keynes City Council
-
Action
Review the junction situation later as part of the planned work programme.
Stated by Milton Keynes City Council
-
Concerns raised1
Failure of commonly used satnav applications to provide safe verbal directions at the junction
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.7
-
Action
Review navigation instructions and simulate speed scenarios near the junction.
Stated by TomTom International B.V. -
Action
Implement safeguards that time verbal commands closer to the exit and after the off-slip road.
Stated by TomTom International B.V. -
Action
Deploy temporary ‘Do not follow Sat Nav’ and customer-information signs at the junction.
Stated by National Highways
-
Action
Investigate Sat Nav routing and liaise with Google Maps, Apple Maps and WAZE regarding potentially confusing audible instructions.
Stated by National Highways -
Action
Liaised with National Highways and reviewed dashcam footage of the junction to inform investigation of Google Maps audio guidance.
Stated by Google UK Limited -
Action
Investigate and develop improvements to the timing of Google Maps audio guidance.
Stated by Google UK Limited -
Action
Add special voice guidance instructing drivers to continue straight at the overpass and turn right onto the A5 toward Milton Keynes, Bletchley.
Stated by Apple (UK) Limited
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
-
Position
It is not clear whether Google Maps was involved in the incidents described in the reports.
Stated by Google UK Limited
-
Position
Maps had no data or routing error that contributed to the deaths.
Stated by Apple (UK) Limited
-
Concerns raised1
Continuing risk to cyclists in the collision area
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
-
Action
Undertake programmed works to reduce the stone wall height and improve visibility at the lane access.
Stated by South Tyneside Borough Council -
Action
Complete the Traffic Regulation Order process and consultation for proposed parking restrictions around the collision area and nearby junctions.
Stated by South Tyneside Borough Council -
Action
Complete the Traffic Regulation Order process and consultation for the proposed 20mph speed limit on Lizard Lane.
Stated by South Tyneside Borough Council
-
Action
Complete the formal legal notification process for proposed additional traffic calming on Lizard Lane.
Stated by South Tyneside Borough Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Implementation of measures requiring legal consultation or notification cannot be guaranteed because proceeding would pre-judge the consultation outcome.
Stated by South Tyneside Borough Council
-
Concerns raised1
Unusually high number of similar collisions at the junction
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.8
-
Action
Progress the Safer Junction scheme and include Great Eastern Street/Curtain Road, subject to final Department for Transport approvals.
Stated by Transport for London -
Action
Ask scheme designers to consider pedestrian safety options at Great Eastern Street/Curtain Road.
Stated by Transport for London -
Action
Undertake further vehicle-speed surveys to assess whether physical speed-reduction measures are required.
Stated by Transport for London
-
Action
Consider restoring pedestrian guardrail at the junction as part of the wider scheme.
Stated by Transport for London -
Action
Consider traffic-calming measures at the junction as part of the wider scheme.
Stated by Transport for London -
Action
Consider modernising pedestrian signals, including possible countdown signals, as part of the junction scheme.
Stated by Transport for London -
Action
Arrange a site visit to assess urgent safety improvements proposed for the junction.
Stated by Transport for London -
Action
Progress the Safer Junction scheme, including the Great Eastern Street/Curtain Road junction, through feasibility, design and construction.
Stated by Transport for London
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
The proposed junction safety schemes were paused because pandemic-related fare losses created funding constraints pending a long-term Government funding agreement.
Stated by Transport for London
-
Concerns raised1
Cycle lane layout failing to provide clear and safe positioning for cyclists crossing the junction
This report raised 3 other concerns. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.7
-
Action
Provide cyclists with a five-second advance green signal at Headley Way.
Stated by Oxfordshire County Council -
Action
Provide a dropped kerb directing cyclists from London Road to the Headley Way shared-use path.
Stated by Oxfordshire County Council -
Action
Remove the stone planter at Headley Way to increase space for pedestrians and cyclists.
Stated by Oxfordshire County Council
-
Action
Redesign and amend Headley Way road markings and cycle-lane markings to clarify cyclist movements through the junction.
Stated by Oxfordshire County Council -
Action
Implement recommendations from the completed Stage 4 Road Safety Audit in proportion to the risks identified.
Stated by Oxfordshire County Council -
Action
Commission and complete a Vulnerable Road Users audit of the relevant highway arrangements.
Stated by Oxfordshire County Council -
Action
Review key junctions posing potential risks to vulnerable road users and develop short-, medium- and long-term mitigations.
Stated by Oxfordshire County Council
-
Concerns raised1
Failure to make the Tollard Green junction and bend sufficiently distinguishable to approaching motorists
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
-
Action
Assess the site and review existing traffic-sign arrangements through experienced road-safety professionals.
Stated by Wiltshire Council -
Action
Add “SLOW” road markings to the Council’s road-marking programme for delivery in the coming months.
Stated by Wiltshire Council -
Action
Continue monitoring the hedgerow situation alongside the highway and landowner responsibilities.
Stated by Wiltshire Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
-
Position
Existing road signs accurately represent the layout and hazards, so no further amendments are proposed.
Stated by Wiltshire Council
-
Concerns raised2
High recurring collision risk at the Whitehouse Road and Forest Road junction
Insufficient road safety measures at the Whitehouse Road and Forest Road junction
Responses linked to these concernsEach statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.5
-
Action
Commission outline design options for junction improvements.
Stated by Isle of Wight Council -
Action
Conduct design review and consultation for junction improvement options.
Stated by Isle of Wight Council -
Action
Select a junction design option and commission its detailed design.
Stated by Isle of Wight Council
-
Action
Tender the improvement works and appoint a delivery contractor.
Stated by Isle of Wight Council -
Action
Construct the selected new junction layout to improve safety.
Stated by Isle of Wight Council
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
-
Position
Traffic lights would not eliminate incidents, so a physical junction layout change is preferred instead.
Stated by Island Roads Services Limited
-
Position
Traffic lights would not eliminate incidents; a physical layout change is preferred to require drivers to deviate from a straight-through route.
Stated by Isle of Wight Council