What this concern includes
Includes failures in the dedicated patient-hoist operation process, including staff or carer competence, adherence to required staffing and lifting procedures, user and carer awareness of hoist risks, emergency-lowering arrangements, relevant safety guidance and escalation of unsafe hoist practices.
What is not included
- Excludes generic moving-and-handling, staffing, training or documentation deficiencies where patient-hoist operation is not the material safety condition.
- Excludes failures involving beds, slings, wheelchairs or other equipment unless the assertion explicitly concerns safe operation of a patient hoist.
- Excludes hoist design, inspection, maintenance or component defects where no failure in operating or managing the hoist is identified.
- Excludes pressure-relief practices, falls or other clinical-care concerns where patient-hoist operation is not the deficient control.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Reports and published responses 3 reports
See individual reports that have raised this concern, and the actions taken in response
-
Concerns raised2
Lack of user and carer awareness of positional asphyxia risks during hoisting
Failure to train carers in emergency lowering using the hoist red cord
This report raised 4 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
- London Borough of Southwark
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
London Borough of Southwark
Develop and establish a self-hoisting policy and checklist covering risk warnings, equipment checks, emergency plans, fault reporting and competency confirmation.
-
Concerns raised1
Inadequate staff training on hoist use
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
-
Concerns raised1
Failure to ensure staff understand and follow hoist safety training
This report raised 2 other concerns. They are not shown here because they do not form part of this recurring concern.
Linked response
- Sunrise Medical Limited
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Sunrise Medical Limited
Publish a model-specific Sunrise hoist instruction manual containing sling safety, maintenance and operation guidance.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.