Uncontrolled structural-collapse risks in properties
First to latest report 17 Jan 2020 — 5 Aug 2024
Reports that mention this concern
2
Times this concern has been raised
2
Stated actions linked to this concern
5
What this concern includes
Includes continuing hazards or control failures involving structural elements of properties, including walls, floors and comparable building components, where collapse could cause death or serious injury; include the anchor's unsafe wall dimensions and the separate report's at-risk property floors.
What is not included
Excludes isolated structural damage or a single collapse where no continuing or comparable risk to other properties is identified.
Excludes general building maintenance, electrical, damp, fire, access or environmental hazards unless structural collapse is the material unsafe condition.
Excludes road, bridge, retaining-wall and other infrastructure-collapse concerns unless the assertion concerns structural elements of occupied or adjoining properties.
Excludes construction-process, inspection or accountability deficiencies when no material structural-collapse risk is asserted.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Cadent Gas Limited1
Eastleigh Borough Council1
Safe Gas Network Ltd1
Scotland Gas Networks plc1
Southampton City Council1
The Institution of Gas Engineers and Managers1
Wales & West Utilities Limited1
English district council1
English unitary authority1
Private limited company1
Professional body1
Public limited company1
Reports and published responses 2 reports
See individual reports that have raised this concern, and the actions taken in response
Hampshire, Southampton and Portsmouth
Concerns raised1
Unsafe dimensions of walls in adjoining properties creating a collapse risk during severe storms
Linked response
Eastleigh Borough Council
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.3
Eastleigh Borough Council
Survey surrounding garden walls to identify properties with similar potentially unstable designs.
Eastleigh Borough Council
Send residents letters explaining the collapse, potential stability issues and advice to seek experienced builder or engineer guidance.
Eastleigh Borough Council
Revisit the site after six months to reassess whether any garden walls present immediate risk or require remedial action.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
Eastleigh Borough Council
Responsibility for garden-wall stability rests with the initial contractor and subsequent property owners, rather than the local authority.
Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Eastleigh Borough Council
No walls currently show immediate risk, so immediate remedial action is not considered necessary, subject to a six-month review.
Disputes the concernThe respondent disagreed with part of the concern or the basis for it.
Rutland and North Leicestershire
Concerns raised1
Risk of floors failing in properties within the immediate area
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Linked responses
Cadent Gas Limited
Health and Safety Executive
Northern Gas Networks Limited
Scotland Gas Networks plc
Southern Gas Networks PLC
Wales & West Utilities Limited
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
Health and Safety Executive
Engage affected residents through a local meeting and distributed leaflets explaining the property risk and mitigating actions.
Health and Safety Executive
Provide local gas engineers with guidance on responding when attending affected properties.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.2
Cadent Gas Limited and Northern Gas Networks Limited and Scotland Gas Networks plc and Southern Gas Networks PLC and Wales & West Utilities Limited
The GDNs had no power to take action concerning the 254 properties at risk of floor failure.
Outside remitThe respondent said that this matter was outside its role or authority.
Cadent Gas Limited and Northern Gas Networks Limited and Scotland Gas Networks plc and Southern Gas Networks PLC and Wales & West Utilities Limited
The HSE would separately consider action concerning the 254 properties at risk of floor failure.
Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.