First reported 17 Sep 2013•Latest report 30 Dec 2022
Definition
What this concern includes
Includes deficiencies in road drainage, gullies, cambers, slopes, roadway profiles or related permanent engineering controls where they allow rainwater, runoff or other surface water to accumulate, cross or remain on a carriageway, including the anchor's regular water spillage onto the B5302 and comparable failures on other roads.
Not included
Excludes generic road-surface defects, slippery surfaces or flooding hazards where no inadequate drainage or related water-removal control is identified.
Excludes temporary weather conditions where the recurring unsafe condition is not a deficient road-drainage or roadway-engineering control.
Excludes failures limited to warning signage, inspection, reporting or repair processes unless they directly concern the drainage or engineering control that allows hazardous surface water to remain.
Excludes non-road drainage or water hazards, including premises, rail, pedestrian and waterway settings.
Reports
10
Distinct published reports
Individual concerns
12
A report can raise multiple concerns
Date range
2013–2022
First to latest report issue date
Stated actions
37
Described in published responses
Reports over time
Reports over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Cornwall Council2
National Highways2
Connect Plus (M25) Limited1
Department for Transport1
Devon County Council1
Devon Highways1
Dorset Council1
Gloucestershire County Council1
North Lincolnshire Council1
North Yorkshire Council1
English unitary authority5
English county council2
National road infrastructure body2
Ministerial department1
Private limited company1
Sub-organisation1
Concerns and responses across reports
Only concerns grouped under this recurring concern are included. Select any concern, action or position to view the source wording.
Surrey
Concerns raised1
Persistent road-surface flat spot and associated aquaplaning hazard
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.18
Action
Commission an independent review of the existing fixed warning sign’s effectiveness and possible visibility improvements.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Install temporary surface-water warning signs at Marker Posts 36/7 and 36/4.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 9 January 2023.
Action
Implement a wet-weather monitoring protocol and activate “Surface Water – Slow” variable-message signs when appropriate.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 9 January 2023.
Action
Commission an independent review of the drainage system to identify improvements likely to reduce carriageway flooding.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Commission investigations into carriageway reprofiling options, including outline designs and construction feasibility and cost.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Carry out weekly visual inspections of slot drains and catchpit surfaces to identify debris accumulation.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Develop and operate a severe-weather surface-water response procedure covering patrol deployment, incident logging, secondary response and CCTV monitoring.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Develop and issue an inspection guide defining acceptable debris levels for hardstrips, central reserves and slot drains.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Trial catchpit sensors to monitor water levels and flow and inform intervention frequency.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Maintain the newly installed temporary flooding warning signs and inspect them weekly for presence and function.
Stated by Connect Plus (M25) LimitedStated completedThe respondent said that this action was complete when they made their response on 9 January 2023.
Action
Undertake scheduled drainage inspections, cleansing of blocked or silted assets, and sweeping of the hardstrip and central reserve.
Stated by Connect Plus (M25) LimitedStated plannedThe respondent said that this action was planned when they made their response on 9 January 2023.
Action
Carry out vegetation cutting and remove excess vegetation from the adjacent landscape plot to reduce leaf burden.
Stated by Connect Plus (M25) LimitedStated plannedThe respondent said that this action was planned when they made their response on 9 January 2023.
Action
Review drainage maintenance and inspection requirements, assess best practice and determine whether enhanced requirements are justified.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Review and develop contingency plans for proactive management of heavy rain, surface water and associated warnings or restrictions.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Investigate flooding-hotspot anomalies and identify justified potential improvements to the drainage system.
Stated by Connect Plus (M25) LimitedStated plannedThe respondent said that this action was planned when they made their response on 9 January 2023.
Action
Assess carriageway profile and develop sufficiently detailed remediation proposals for cost-benefit analysis where issues are identified.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Review whether alternative carriageway surfacing could provide beneficial risk mitigation.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Action
Undertake a standards-based review of signage requirements, including whether the fixed warning sign should be illuminated.
Stated by Connect Plus (M25) LimitedStated in progressThe respondent said that this action was in progress when they made their response on 9 January 2023.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
National Highways retains control of safety-critical technology, including decisions on speed-limit signs and variable message warnings.
Stated by Connect Plus (M25) LimitedRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Mid Kent and Medway
Concerns raised1
Failure of road drainage to prevent water running across the carriageway
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.4
Action
Jet and survey the London-bound drainage system to improve drainage efficiency and identify remedial requirements.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 19 December 2022.
Action
Complete drainage remedial works, including cleaning channels, drains, gullies and catchpits, repairing drainage pitches, installing a drainage pipe and adding an asphalt kerb.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 19 December 2022.
Action
Deliver the M20 Medway and Allington Deck Refurbishment scheme, including carriageway refurbishment and higher-grip, faster-draining Hot Rolled Asphalt surfacing.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 19 December 2022.
Action
Replace the distributor road’s vehicle restraint system and drainage as part of the refurbishment scheme.
Stated by National HighwaysStated plannedThe respondent said that this action was planned when they made their response on 19 December 2022.
North Lincolnshire and Grimsby
Concerns raised1
Failure to identify and remedy blocked drainage gullies
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
No further action is considered necessary beyond monitoring the highway under the Council’s existing inspection system.
Stated by North Lincolnshire CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
North Yorkshire and York including North Yorkshire Western District
Concerns raised1
Failure of roadway drainage and engineering to safely clear and channel storm and rainwater
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
No linked response statements
No respondent-stated action or position is linked to these concerns in the published data.
Cornwall and Isles of Scilly
Concerns raised2
Failure to implement feasible road drainage improvements
Converging surface water on the A390 during heavy rainfall
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
Action
Improve drainage by installing combined kerb drainage, additional surface-water gullies, and increased carrier-drain capacity.
Stated by Corserv Solutions LimitedStated completedThe respondent said that this action was complete when they made their response on 4 January 2023.
Cornwall and Isles of Scilly
Concerns raised1
Failure to implement feasible road drainage improvements
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
Action
Replace existing Coliza Hill slip-road gully grids with larger-capacity gratings.
Stated by Cornwall CouncilStated plannedThe respondent said that this action was planned when they made their response on 27 May 2021.
Action
Undertake detailed drainage and topographical surveys of the main road alignment.
Stated by Cornwall CouncilStated plannedThe respondent said that this action was planned when they made their response on 27 May 2021.
Gloucestershire
Concerns raised1
Failure of roadside drainage to prevent standing and running water on the A424
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
The site was not considered to have an established flooding or drainage problem, based on only one slight prior incident and no subsequent reports.
Stated by Gloucestershire County CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Dorset
Concerns raised1
Failure of surface-water drainage on the road stretch
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.2
Action
Resurface the B3091, adjusting the road camber to improve drainage and reduce surface water.
Stated by Dorset CouncilStated completedThe respondent said that this action was complete when they made their response on 29 July 2019.
Action
Clean the drainage system serving the affected highway section.
Stated by Dorset CouncilStated completedThe respondent said that this action was complete when they made their response on 29 July 2019.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
Existing resurfacing improvements are considered sufficient, so no further work is planned at this location for the time being.
Stated by Dorset CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Exeter and Greater Devon
Concerns raised2
Inadequate carriageway drainage capacity for heavy rain
Failure to keep central reservation drainage clear
This report raised 1 other concern. They are not shown here because they do not form part of this recurring concern.
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.5
Action
Provide temporary sandbag mitigation to direct excess rainwater into the gully and away from the carriageway.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 1 July 2018.
Action
Install an additional gully adjacent to the existing gully to increase rainwater interception and prevent water reaching the carriageway.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 1 July 2018.
Action
Design and construct a further gully approximately 100 metres uphill to increase drainage capacity and reduce water reaching the lower gully.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 1 July 2018.
Action
Conduct a wider drainage study with detailed modelling to identify further work mitigating the risk of a similar collision.
Stated by National HighwaysStated in progressThe respondent said that this action was in progress when they made their response on 1 July 2018.
Action
Flag the location as a flooding hotspot and conduct weekly inspections with material removal or service-provider intervention when required.
Stated by National HighwaysStated completedThe respondent said that this action was complete when they made their response on 1 July 2018.
Exeter & Greater Devon
Concerns raised1
Inadequate drainage to prevent water crossing the road and washing away road gritting
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.5
Action
Undertake further weather-response treatments on the A396 in support of precautionary winter gritting routes.
Stated by Devon County CouncilStated plannedThe respondent said that this action was planned when they made their response on 17 September 2013.
Action
Use drainage features and best-practice measures within the 2013/14 winter maintenance approach.
Stated by Devon County CouncilStated plannedThe respondent said that this action was planned when they made their response on 17 September 2013.
Action
Continue inspections, intelligence gathering and risk assessment to inform responses to severe weather and drainage conditions.
Stated by Devon County CouncilStated in progressThe respondent said that this action was in progress when they made their response on 17 September 2013.
Action
Complete works at the A396 junction and review drainage management at that location.
Stated by Devon County CouncilStated completedThe respondent said that this action was complete when they made their response on 17 September 2013.
Action
Communicate the commitment to fit-for-purpose winter maintenance work and improve communication and management of drainage features among relevant staff.
Stated by Devon County CouncilStated in progressThe respondent said that this action was in progress when they made their response on 17 September 2013.
Respondent positions A position is what a respondent says about the concern when they do not describe a specific action.1
Position
Flooding at the A396 was difficult to predict, and inspections had not identified recurring drainage issues at the location.
Stated by Devon County CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.