What this concern includes
Includes failures of controls specifically dedicated to prison-cell electrical safety, including timely remedial maintenance of electrical faults and authorised, risk-assessed and time-limited isolation of cell power.
What is not included
- Excludes generic prison maintenance, staffing or lockdown-capacity deficiencies unless they directly concern the safety control of cell electrical systems.
- Excludes general electrical-equipment maintenance outside prison cells.
- Excludes unrelated cell hazards, fire-detection systems, telephones, call bells or other prison safety systems unless the assertion specifically concerns electrical safety of the cell system.
- Excludes the underlying risk of self-harm or fire where no deficiency in a prison-cell electrical safety control is identified.
Trends
Reports over time
Reports mentioning this concern, over time
Reports about this concern issued each year.
* 2026 is projected from reports observed to 7 Sep 2026.
Most frequent recipients
Most frequent recipients
Reports about this concern sent to each recipient.
Reports and published responses 2 reports
See individual reports that have raised this concern, and the actions taken in response
-
Concerns raised1
Lack of policy governing the isolation of power to cells
This report raised 9 other concerns. They are not shown here because they do not form part of this recurring concern.
No linked response statementsNo respondent-stated action or position is linked to these concerns in the published data.
-
Concerns raised1
Delays in remedial maintenance for cell electrical faults during lockdown
Linked response
- Serco Home Affairs, HMP Dovegate
Stated actions An action is something a respondent says it has done, is doing, or plans to do in response to the concern raised.1
-
Serco Home Affairs, HMP Dovegate
Maintain an out-of-hours process for promptly reporting and rectifying cell electricity faults through an on-call facilities officer and Duty Manager escalation.
Actions and positions describe what organisations say in published responses. Implementation is not independently verified.
Data last updated 7 September 2026