First report 20 Feb 2025•Latest report 20 Feb 2025
Recipient record
Reports, concerns and published responses
Private and voluntary organisations · Private limited company. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.
Reports
1
Naming this recipient
Published responses
100%
Found for named reports
Concerns addressed
3
Across all linked responses
Stated actions
5
Described in responses
Reports over time
Reports over time
Reports naming this recipient by issue year.
Evidence profile
Report topics
Share of this recipient’s reports compared with all other recipients.
100%published responses found
5stated actions described
Topic comparisons are not available in the current evidence snapshot.
Concerns and recipient responses
Statements from Affinity Water Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.
Essex
Concerns raised4
Inadequate Code of Practice guidance for calculating street works distances where standard reference points or markings are unavailable or variable
Difficulties in calculating distances for roadworks set up in darkness
Failure to place road works warning signs without obscuring visibility of joining traffic
Absence of a requirement to notify fatalities within roadworks on permit applications
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised.2
Action
Strengthen planning and execution of emergency roadworks and implement stricter contractor-oversight protocols, supported by regular audits and assessments.
Stated completedThe respondent said that this action was complete when they made their response on 25 February 2025.
Action
Work collaboratively with the Department for Transport and councils on proposed Code revisions or new rules for permit applications and safe roadworks.
Stated plannedThe respondent said that this action was planned when they made their response on 25 February 2025.
Respondent positions A position is what this recipient says about the concern when it does not describe a specific action.2
Position
Affinity disputes that fatal incidents must be notified on retrospective roadworks permit applications, stating that no such requirement exists.
Disputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
Responding to the second concern falls outside Affinity’s remit because the Department for Transport publishes and controls the Safety at Street Works Code.
Outside remitThe respondent said that this matter was outside its role or authority.