Recipient

Cheshire East Council

First report 30 Jan 2017•Latest report 1 Nov 2019

Recipient record

Reports, concerns and published responses

Local government · English unitary authority. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.

Reports
4

Naming this recipient

Published responses
75%

Found for named reports

Concerns addressed
2

Across all linked responses

Stated actions
3

Described in responses

Reports over time

Reports over time

Reports naming this recipient by issue year.

Evidence profile

Report topics

Share of this recipient’s reports compared with all other recipients.

75%published responses found
3stated actions described

Topic comparisons are not available in the current evidence snapshot.

Concerns and recipient responses

Statements from Cheshire East Council linked to the concerns in each report. Select any concern, action or position to view the source wording.

  1. Cheshire

    AI-generated summary

    Liyakat Ali SIDAT and 2 others · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    On 4 November 2018, Liyakat Ali Sidat was driving on the A34 Melrose Way when he overtook two vehicles on a bend and collided with an oncoming vehicle. He, his wife Salma Bibi Sidat and their daughter Hajra Bibi Sidat sustained fatal injuries; concerns focused on the danger of the bend, the absence of a continuous white line to prevent overtaking, and the risk posed by overtaking on that stretch of road.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Cheshire East Council; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of a continuous white line at the Melrose Way bend to prevent overtaking

    Wider context from the report

    “(1) The A34 bypass (Melrose Way Bend) presents a danger to life. (2) The Melrose Way section has no continuous white line at the bend section preventing overtaking. It is dangerous to overtake on that stretch of road witness evidence referred to how dark it was and lives are at risk if overtaking is allowed to continue there. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Cheshire East Council; that does not assign responsibility.

    PFD Monitor interpretation

    Danger to life at the A34 bypass (Melrose Way Bend)

    Wider context from the report

    “(1) The A34 bypass (Melrose Way Bend) presents a danger to life. (2) The Melrose Way section has no continuous white line at the bend section preventing overtaking. It is dangerous to overtake on that stretch of road witness evidence referred to how dark it was and lives are at risk if overtaking is allowed to continue there. ”
    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Replace the existing hazard centreline marking with a hatched hazard centreline.

    Verbatim wording from the response

    “In response to your letter dated 16th January 2020 we can advise that the meeting of 15th November 2019 has taken place and reviewed the Road Safety Assessment report for the A34 Melrose Way prepared by the Council’s Senior Road Safety Engineer. The report recommended that the existing hazard centreline marking is replaced with a hatched hazard centreline. This will give a visual carriageway narrowing effect and put greater distance between the traffic travelling in both directions and may help heighten driver awareness when considering overtaking manoeuvres. This recommendation has been accepted by the Council and the works are programmed to be carried out in March.”

    Source location

    2019-0370-Response-from-Cheshire-East-Highways
    Page 1 · response
    Published 13 December 2019

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Review the Road Safety Assessment for the A34 Melrose Way.

    Verbatim wording from the response

    “In response to your letter dated 16th January 2020 we can advise that the meeting of 15th November 2019 has taken place and reviewed the Road Safety Assessment report for the A34 Melrose Way prepared by the Council’s Senior Road Safety Engineer. The report recommended that the existing hazard centreline marking is replaced with a hatched hazard centreline. This will give a visual carriageway narrowing effect and put greater distance between the traffic travelling in both directions and may help heighten driver awareness when considering overtaking manoeuvres. This recommendation has been accepted by the Council and the works are programmed to be carried out in March.”

    Source location

    2019-0370-Response-from-Cheshire-East-Highways
    Page 1 · response
    Published 13 December 2019

    Open published response
  2. Cheshire

    AI-generated summary

    David Holman · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    David Holman died instantly on 13 July 2016 after riding his pedal cycle from the pavement into the path of an oncoming HGV on the A556 at Plumley. Concerns were raised about the absence of a cycle lane, an obstructing road-sign support, and a dip in the kerb, which may have contributed to him leaving the footpath and could increase the risk of a similar occurrence.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Cheshire East Council; that does not assign responsibility.

    PFD Monitor interpretation

    Dip in the kerb edge

    Wider context from the report

    “It appears that there is no cycle lane there and the road gets very busy, so the footpath was being ridden along. There is a road sign situated just after the area at which the descent into the road is thought to have taken place. One support of this goes into the footpath causing an obstruction. There is also a dip in the kerb edge there. No one seemed to know why it was situated there as there is no field entrance or other opening opposite it. It was thought possible that either one or the other or both of these things could have had some effect in the causation of him leaving the footpath. We should appreciate your consideration of these facts to see if any changes need to be made to less the chance of a similar occurrence happening. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Cheshire East Council; that does not assign responsibility.

    PFD Monitor interpretation

    Obstruction of the footpath by a road-sign support

    Wider context from the report

    “It appears that there is no cycle lane there and the road gets very busy, so the footpath was being ridden along. There is a road sign situated just after the area at which the descent into the road is thought to have taken place. One support of this goes into the footpath causing an obstruction. There is also a dip in the kerb edge there. No one seemed to know why it was situated there as there is no field entrance or other opening opposite it. It was thought possible that either one or the other or both of these things could have had some effect in the causation of him leaving the footpath. We should appreciate your consideration of these facts to see if any changes need to be made to less the chance of a similar occurrence happening. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Cheshire East Council; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of a cycle lane on a busy road

    Wider context from the report

    “It appears that there is no cycle lane there and the road gets very busy, so the footpath was being ridden along. There is a road sign situated just after the area at which the descent into the road is thought to have taken place. One support of this goes into the footpath causing an obstruction. There is also a dip in the kerb edge there. No one seemed to know why it was situated there as there is no field entrance or other opening opposite it. It was thought possible that either one or the other or both of these things could have had some effect in the causation of him leaving the footpath. We should appreciate your consideration of these facts to see if any changes need to be made to less the chance of a similar occurrence happening. ”
    Open source report
Back to top

Published response patterns

Compared with other recipients in reports included in PFD Monitor

Describes published response evidence, not performance.

Published responses found

75%
75%All other recipients 58%
0%100%

How actions were described at the time

This respondent
33%67%
All other recipients
47%25%27%<1%<1%
  • Completed
  • In progress
  • Planned
  • Unclear
  • Partially completed

Statuses reflect what recipients said at the time. PFD Monitor does not verify whether actions happened.

Types of action described in responses

Percentages use all actions described by each group. An action may have more than one type, so percentages do not total 100%.

Information checked against published PFD reports and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Data last updated 7 September 2026