Recipient

C.M.F. Limited

First report 22 Oct 2015•Latest report 22 Oct 2015

Recipient record

Reports, concerns and published responses

Private and voluntary organisations · Private limited company. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.

Reports
1

Naming this recipient

Published responses
100%

Found for named reports

Concerns addressed
6

Across all linked responses

Stated actions
7

Described in responses

Reports over time

Reports over time

Reports naming this recipient by issue year.

Evidence profile

Report topics

Share of this recipient’s reports compared with all other recipients.

100%published responses found
7stated actions described

Topic comparisons are not available in the current evidence snapshot.

Concerns and recipient responses

Statements from C.M.F. Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.

  1. Inner North London

    AI-generated summary

    Richard LACO · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Richard Laco died on a building site at the Francis Crick Institute when a landing fell on him while it was being tilted into place. The fitting process used a different methodology from earlier landings, but the method statement, risk assessment and lift plan did not describe the process or provide key safety instructions. The report also raised concerns about inadequate understanding of the planning and approval requirements among some site witnesses.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to C.M.F. Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure of method statements, risk assessments and lift plans to address changed landing-fitting processes

    Wider context from the report

    “1. The fitting of the two below ground landings in core D of the development at the Francis Crick Institute utilised a different methodology to the landings already fitted in cores A and F. The shape of the landings was trapezoid rather than rectangular; and they were lowered vertically to ground level and then later raised & tilted to pass the side fins; rather than simply being lowered from the top directly into place. However, no part of the method statement, risk assessment or lift plan recognised that. There was no description of the different process; there was no instruction to stop the procedure if positive fixings (i.e. feeding the slings through eye bolts) could not be achieved; and there was no indication that the wide rather than the narrow end of the landing should be tilted down with the tag lines. The need for such a plan was not identified by CMF in drafting the planning documents, nor by LOR in checking and approving them. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to C.M.F. Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Insufficient process understanding among personnel responsible for planning and approving landing-fitting work

    Wider context from the report

    “2. Not only was there no appropriate plan in place for the fitting of the two basement landings in core D, at inquest nearly two years after the event, some site witnesses did not appear to see the need for such a plan. Some witnesses did not appear familiar with basic terminology, despite still holding a pivotal role in planning/approving the plans for such processes, and gave evidence that did not demonstrate clarity of understanding of the processes. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to C.M.F. Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Unavailability of an appropriate plan for basement landing fitting

    Wider context from the report

    “2. Not only was there no appropriate plan in place for the fitting of the two basement landings in core D, at inquest nearly two years after the event, some site witnesses did not appear to see the need for such a plan. Some witnesses did not appear familiar with basic terminology, despite still holding a pivotal role in planning/approving the plans for such processes, and gave evidence that did not demonstrate clarity of understanding of the processes. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to C.M.F. Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to specify the correct landing orientation for tag-line tilting

    Wider context from the report

    “1. The fitting of the two below ground landings in core D of the development at the Francis Crick Institute utilised a different methodology to the landings already fitted in cores A and F. The shape of the landings was trapezoid rather than rectangular; and they were lowered vertically to ground level and then later raised & tilted to pass the side fins; rather than simply being lowered from the top directly into place. However, no part of the method statement, risk assessment or lift plan recognised that. There was no description of the different process; there was no instruction to stop the procedure if positive fixings (i.e. feeding the slings through eye bolts) could not be achieved; and there was no indication that the wide rather than the narrow end of the landing should be tilted down with the tag lines. The need for such a plan was not identified by CMF in drafting the planning documents, nor by LOR in checking and approving them. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to C.M.F. Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to include stop instructions for unsuccessful positive fixings during landing fitting

    Wider context from the report

    “1. The fitting of the two below ground landings in core D of the development at the Francis Crick Institute utilised a different methodology to the landings already fitted in cores A and F. The shape of the landings was trapezoid rather than rectangular; and they were lowered vertically to ground level and then later raised & tilted to pass the side fins; rather than simply being lowered from the top directly into place. However, no part of the method statement, risk assessment or lift plan recognised that. There was no description of the different process; there was no instruction to stop the procedure if positive fixings (i.e. feeding the slings through eye bolts) could not be achieved; and there was no indication that the wide rather than the narrow end of the landing should be tilted down with the tag lines. The need for such a plan was not identified by CMF in drafting the planning documents, nor by LOR in checking and approving them. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to C.M.F. Limited; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to identify the need for a task-specific landing-fitting plan during drafting and approval

    Wider context from the report

    “1. The fitting of the two below ground landings in core D of the development at the Francis Crick Institute utilised a different methodology to the landings already fitted in cores A and F. The shape of the landings was trapezoid rather than rectangular; and they were lowered vertically to ground level and then later raised & tilted to pass the side fins; rather than simply being lowered from the top directly into place. However, no part of the method statement, risk assessment or lift plan recognised that. There was no description of the different process; there was no instruction to stop the procedure if positive fixings (i.e. feeding the slings through eye bolts) could not be achieved; and there was no indication that the wide rather than the narrow end of the landing should be tilted down with the tag lines. The need for such a plan was not identified by CMF in drafting the planning documents, nor by LOR in checking and approving them. ”
    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Stop lifting when circumstances, environmental changes or attachment deviations compromise the operation, then assess and approve lift-plan modifications before resuming.

    Verbatim wording from the response

    “6. If at any stage the lifting operation becomes compromised by unforeseen circumstances or changes to the local environment, lifting will cease as soon as it is safe to do so. The appointed person will then assess the changes and implement the modification within the lift plan before lifting resumes. Similarly the slinger signaller must not deviate from using the prescribed attachments or accessories defined in the lift plan and schedule of common lifts. Any deviation will cause lifting to cease until the approved person has assessed the implications.”

    Source location

    Richard-Laco-Response2
    Page 3 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Require qualified appointed persons to plan lifting operations using CMF’s native lift-plan procedure.

    Verbatim wording from the response

    “2. The lifting operations are to be planned by a qualified appointed person for lifting and not by site managers who may not have formal qualifications for lifting operations despite having extensive experience of lifting. A lift plan is to be completed using the CMF native lift plan procedure to ensure consistency and content.”

    Source location

    Richard-Laco-Response2
    Page 2 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Submit lifting plans, temporary-works requirements and relevant design considerations to the Principal Contractor for approval before lifting.

    Verbatim wording from the response

    “3. Lifting plans together with any temporary works requirement or relevant design considerations are to be submitted to and approved by the Principal Contractor for projects before lifting commences.”

    Source location

    Richard-Laco-Response2
    Page 2 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Use purpose-designed lifting holes or bespoke lifting carriages, identified during design with advice from the appointed person.

    Verbatim wording from the response

    “1. All members to be lifted will either have adequately sized holes that allow for the fixing of positive anchorages for lifting accessories or for alternative bespoke lifting carriages. These will be identified during the design stage and advice obtained from the appointed person.”

    Source location

    Richard-Laco-Response2
    Page 2 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Implement an alternative landing-lifting method using bolted lifting frames, anchored lifting eyes, chains, separate winches and an additional slab opening.

    Verbatim wording from the response

    “Following the incident and after intensive investigations into best practice for an alternative method of lifting, it was determined to proceed with a lift plan that involved tilting the landing past the fin plates. An additional lifting frame was designed to be fixed to the landing with bolts that would facilitate the use of lifting eyes. The use of slings for lifting was substituted by chains attached to the lifting eyes. A second winch was introduced and another hole made in the slab so the tilt of the landing could be carried out by raising and lowering of separate winches rather than taglines. The trapezoidal landings above the ground floor slab were installed in accordance with the original lift plan methodology as this was still considered to be the best practice although the use of slings was again substituted for chains attached to directly anchored lifting eyes.”

    Source location

    Richard-Laco-Response2
    Page 2 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Require appointed persons to brief lift teams on approved plans, temporary works, design considerations and individual responsibilities.

    Verbatim wording from the response

    “4. All approved lifting plans will be explained to the lift team by the appointed person to ensure everyone in the lift team understands and that all members of the lift team are fully conversant with their respective duties or responsibilities. This is also to include any temporary work associated with the lift and/or important design considerations.”

    Source location

    Richard-Laco-Response2
    Page 2 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Require appointed-person re-briefings after lift-supervisor absence and whenever a lift plan remains in force for more than 90 days.

    Verbatim wording from the response

    “5. After delegation of the lift plan to the lift supervisor, absence of this person through illness or other reason will require a re-briefing by the appointed person to ensure replacement and entire lift team are briefed before lifting resumes. In any event if the lift plan is in force for more than 90 days, a re-briefing of the lift team will be a requirement.”

    Source location

    Richard-Laco-Response2
    Page 2 · response
    Published 22 October 2015

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    The irregular landing shape was not sufficiently significant to require changing the lifting plan, and factory trials raised no concerns.

    Verbatim wording from the response

    “The Project Lifting Plan produced by CMF on 25th May 2013 for lifts within the cores was revised on the 22nd August 2013 (Revision C) to include photographs of trial lifts conducted by CMF at its factory. The revisions were made in anticipation of lifts to be conducted within Cores F and D. The lifting plan in this revised format was intended for use in Core D, despite the irregular shape of the landings on one side of the core. The shape of the landing was not considered by CMF to be of sufficient significance to necessitate a change to the lift plan.”

    Source location

    Richard-Laco-Response2
    Page 1 · response
    Published 22 October 2015

    Open published response
Back to top

Published response patterns

Compared with other recipients in reports included in PFD Monitor

Describes published response evidence, not performance.

Published responses found

100%
100%All other recipients 58%
0%100%

How actions were described at the time

This respondent
14%86%
All other recipients
47%25%27%<1%<1%
  • Completed
  • In progress
  • Planned
  • Unclear
  • Partially completed

Statuses reflect what recipients said at the time. PFD Monitor does not verify whether actions happened.

Types of action described in responses

Percentages use all actions described by each group. An action may have more than one type, so percentages do not total 100%.

Information checked against published PFD reports and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Data last updated 7 September 2026