20 Feb 2025 Paul Stephen Collingridge · Prevention of Future Deaths report Essex
View report summary
Concerns raised 4 Inadequate Code of Practice guidance for calculating street works distances where standard reference points or markings are unavailable or variable View source Difficulties in calculating distances for roadworks set up in darkness View source Failure to place road works warning signs without obscuring visibility of joining traffic View source Absence of a requirement to notify fatalities within roadworks on permit applications View source See 1 more concern
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised. 4
Action
Devise and roll out a toolbox talk addressing sight-line issues and the procedure changes across the business.
View source
Action
Complete a full review of emergency works procedures.
View source
Action
Roll out new detailed design layouts and sign-placement guidance for all traffic-light schemes and road speeds.
View source
Action
Add a process-flow question requiring operatives to record whether signage sight lines have been checked and assessed as appropriate.
View source See 1 more action
×
AI-generated summary
Paul Stephen Collingridge · Prevention of Future Deaths report
This summary was generated using AI from the published report. Please read the original report for the complete account.
Report summary
Paul Stephen Collingridge, aged 28, died on 6 December 2022 from multiple traumatic injuries after his motorcycle high-sided near overnight roadworks and he was struck by oncoming traffic. The report raised concerns about the setting out and measurement of roadworks in darkness and on curved roads, the placement of a warning sign that obscured visibility, and the absence of a requirement to report a fatality on a retrospective permit application.
Read the report on judiciary.uk
× Source evidence
How this individual concern was interpreted PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Hatton Traffic Management Limited; that does not assign responsibility.
PFD Monitor interpretation Inadequate Code of Practice guidance for calculating street works distances where standard reference points or markings are unavailable or variable
Wider context from the report “(2) The Safety of Street Works Code of Practice sets out how to take measurements to set out street works that include utilising street furniture that are at set distances and standard road markings that have standard lengths on carriageways with specific road speeds.
a. Some carriageways do not have street furniture
b. Some of the road markings on the carriage where the fatal collision did not comply to standard lengths and therefore the markings can have variations.
c. The Code of Practice does not set out how to calculate the distance where there is road curvature where the road markings have differing lengths on opposing sides where the markings are delineated on bends in a carriageway.
” Open source report × Source evidence
How this individual concern was interpreted PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Hatton Traffic Management Limited; that does not assign responsibility.
PFD Monitor interpretation Difficulties in calculating distances for roadworks set up in darkness
Wider context from the report “(1) Where Road Works Permits are required by utility companies these are often urgent to carry out vital repairs. This can mean that roadworks are set up in hours of darkness and may cause difficulties calculating distances as set out in the Safety at Street Works Code of Practice.
” Open source report × Source evidence
How this individual concern was interpreted PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Hatton Traffic Management Limited; that does not assign responsibility.
PFD Monitor interpretation Failure to place road works warning signs without obscuring visibility of joining traffic
Wider context from the report “(3) A road works warning sign was placed at the junction that joined the carriageway of a road that obscured visibility of traffic joining the main carriageway . Whilst this did not cause or contribute to this incident this was not in accordance with the Code of Practice .
” Open source report × Source evidence
How this individual concern was interpreted PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Hatton Traffic Management Limited; that does not assign responsibility.
PFD Monitor interpretation Absence of a requirement to notify fatalities within roadworks on permit applications
Wider context from the report “(4) The fatal incident that occurred on 6 December 2022 was not notified on the retrospective permit application for roadworks on the following day. There is no requirement for a fatality within roadworks be notified on application for an application for a permit .
” Open source report
×
Source evidence
How this respondent action was interpreted
PFD Monitor created a concise, searchable interpretation from the published response wording shown below.
PFD Monitor interpretation Devise and roll out a toolbox talk addressing sight-line issues and the procedure changes across the business.
Verbatim wording from the response “A specific toolbox talk addressing this issue and the above changes, was devised and rolled out across the business on 30th January 2025.”
Source location Response from Hatton Traffic Management Page 1 · response Published 25 February 2025
Open published response
×
Source evidence
How this respondent action was interpreted
PFD Monitor created a concise, searchable interpretation from the published response wording shown below.
PFD Monitor interpretation Complete a full review of emergency works procedures.
Verbatim wording from the response “Insofar as recommendation 5 (3) is concerned, HTML can confirm that it undertook a full review of emergency works procedures which resulted in new design layouts for all traffic light schemes on all road speeds. These provide additional more detailed guidance and direction on the placement of signs and were rolled out across the business on 23rd January 2025.”
Source location Response from Hatton Traffic Management Page 1 · response Published 25 February 2025
Open published response
×
Source evidence
How this respondent action was interpreted
PFD Monitor created a concise, searchable interpretation from the published response wording shown below.
PFD Monitor interpretation Roll out new detailed design layouts and sign-placement guidance for all traffic-light schemes and road speeds.
Verbatim wording from the response “Insofar as recommendation 5 (3) is concerned, HTML can confirm that it undertook a full review of emergency works procedures which resulted in new design layouts for all traffic light schemes on all road speeds. These provide additional more detailed guidance and direction on the placement of signs and were rolled out across the business on 23rd January 2025.”
Source location Response from Hatton Traffic Management Page 1 · response Published 25 February 2025
Open published response
×
Source evidence
How this respondent action was interpreted
PFD Monitor created a concise, searchable interpretation from the published response wording shown below.
PFD Monitor interpretation Add a process-flow question requiring operatives to record whether signage sight lines have been checked and assessed as appropriate.
Verbatim wording from the response “In addition, an additional question has been added to the installation process flow which requires the relevant operative to answer and record whether sight lines to signage have been checked and assessed as appropriate.”
Source location Response from Hatton Traffic Management Page 1 · response Published 25 February 2025
Open published response