Recipient

Kirklees Borough Council

First report 27 May 2015•Latest report 15 Apr 2021

Recipient record

Reports, concerns and published responses

Local government · English metropolitan district council. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.

Reports
4

Naming this recipient

Published responses
50%

Found for named reports

Concerns addressed
3

Across all linked responses

Stated actions
4

Described in responses

Reports over time

Reports over time

Reports naming this recipient by issue year.

Evidence profile

Report topics

Share of this recipient’s reports compared with all other recipients.

50%published responses found
4stated actions described

Topic comparisons are not available in the current evidence snapshot.

Concerns and recipient responses

Statements from Kirklees Borough Council linked to the concerns in each report. Select any concern, action or position to view the source wording.

  1. West Yorkshire (Western)

    AI-generated summary

    Danielle Lea Broadhead · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Danielle Lea Broadhead lost control of her vehicle on Barnsley Road, Flockton, after clipping a kerb where a grass verge becomes a pedestrian pavement on a bend, and collided with a tree. She sustained fatal head injuries; the substantive concerns were whether the road layout met regulations and standards and whether measures were needed to highlight the kerb to oncoming motorists.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Inadequate measures highlighting the commencement of the kerb to oncoming motorists

    Wider context from the report

    “• To review and consider the existing road layout to ensure that it meets the correct regulations and standards. • To consider the appropriateness of measures which highlight the commencement of the kerb to oncoming motorists. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Failure of the existing road layout to meet correct regulations and standards

    Wider context from the report

    “• To review and consider the existing road layout to ensure that it meets the correct regulations and standards. • To consider the appropriateness of measures which highlight the commencement of the kerb to oncoming motorists. ”
    Open source report

    Source evidence

    How this respondent action was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Extend the northern footway, install dropped kerbs, and modify the kerb line to create a safer 90-degree pedestrian crossing point.

    Verbatim wording from the response

    “It was agreed at the site meeting that there was no certainty of the kerb being a factor in the collision. However, it was identified that there could be a potential risk to pedestrians at this point on the network, and as there was a planned footway resurfacing scheme for Barnsley Road between Flockton and Grange Moor, Highway Officers decided to investigate the potential to amend this detail.”

    Source location

    2021-0104-Response-from-Kirklees-Council-Redacted
    Page 3 · response
    Published 16 April 2021

    Open published response

    Source evidence

    How this respondent position was interpreted

    PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

    PFD Monitor interpretation

    Existing edge and centre-line markings comply with applicable requirements and direct drivers away from the kerb transition.

    Verbatim wording from the response

    “The location of the kerb, where there is a change from grassed verge to made footway, is approximately 500m to the West of the junction of Haigh Lane opposite a private drive entrance. At the point of the change there is an existing edge of carriageway line leading drivers away from where the kerb starts. This line was last re-instated in 2016 as part of the road surface dressing works. The Google image above was captured in Sept 2020. The centre lane is made up of a double white line system (also reinstated in 2016) both have been installed in accordance with “Traffic Signs Regulations and General Directions 2016” and associated “TSM Chapter 5 – Road Markings” The change from verge to footway is made by transition kerbs, into full height kerb, with the verge and made tarmac footway being same width.”

    Source location

    2021-0104-Response-from-Kirklees-Council-Redacted
    Page 2 · response
    Published 16 April 2021

    Open published response
  2. West Yorkshire (West)

    AI-generated summary

    Muhammed Wajid · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Muhammed Wajid was removed from Scammonden Bridge by police on 12 September 2018 and admitted voluntarily to Lynfield Mount Hospital. The following morning, he was permitted unaccompanied leave, travelled by taxi to the bridge and jumped to his death; concerns included the bridge’s history of suicides and uncertainty about whether previously proposed preventive measures had been fully implemented.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Suicide hazard at Scammonden Bridge

    Wider context from the report

    “(1) Scammonden Bridge is a locally notorious location for suicides. (2) Reports to prevent future deaths have been made to Kirklees Council and Highways England under the above statutory provisions following deaths occurring in similar circumstances. (3) Kirklees Council and Highways England have reported proposed steps to prevent future deaths to the coroner following a similar report. The coroner is not aware whether those steps have been fully actioned. ”
    Open source report
  3. West Yorkshire Eastern

    AI-generated summary

    Jessica Louise Duckworth · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Jessica Louise Duckworth, aged 23, died after falling from the Scammonden Bridge over the M62 motorway and being struck by passing vehicles. The report raised concern that the bridge was a notorious suicide location and that fencing or other measures should be considered to prevent people falling from it.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Risk of people falling from a bridge at a known suicide spot

    Wider context from the report

    “As the location has achieved notoriety as a suicide spot consideration should be given to installing fencing or other measures to prevent people falling from the bridge. ”
    Open source report
  4. West Yorkshire (West)

    AI-generated summary

    Nicholas Gary Stocks · Prevention of Future Deaths report

    This summary was generated using AI from the published report. Please read the original report for the complete account.

    Report summary

    Nicholas Gary Stocks was struck and fatally injured by a vehicle after a collision at the junction of Dry Hill Lane and the A635 Barnsley Road in Huddersfield on 27 September 2012. The report raised concerns about damaged and poorly maintained give-way signs and road markings, inadequate reporting and repair systems, highway inspection practices, risk assessment, and coordination between West Yorkshire Police and Kirklees Council.

    Read the report on judiciary.uk

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    50 mph speed limit at the incident junction approaches

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Inconsistent highway inspection practices

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to undertake risk assessments and determine urgency of remedial work after road traffic collisions

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to follow up remedial work assigned to other agencies

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Potentially inadequate street lighting at road junction approaches

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to identify and report defective road markings for repair

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Lack of ongoing training and assessment of Safety Inspectors

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Absence of visible signs or road markings at an approaching Give Way junction

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to appropriately assess and act on public reports of highway defects

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Unclear allocation of responsibility for inspecting road junctions

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Failure to fully report matters of concern identified at road traffic collision scenes

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report

    Source evidence

    How this individual concern was interpreted

    PFD Monitor created a concise, searchable interpretation from the report wording shown below. The report was sent to Kirklees Borough Council; that does not assign responsibility.

    PFD Monitor interpretation

    Unavailability of an appropriately manned emergency reporting route

    Wider context from the report

    “West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”
    Open source report
Back to top

Published response patterns

Compared with other recipients in reports included in PFD Monitor

Describes published response evidence, not performance.

Published responses found

50%
50%All other recipients 58%
0%100%

How actions were described at the time

This respondent
25%50%25%
All other recipients
47%25%27%<1%<1%
  • Completed
  • In progress
  • Planned
  • Unclear
  • Partially completed

Statuses reflect what recipients said at the time. PFD Monitor does not verify whether actions happened.

Types of action described in responses

Percentages use all actions described by each group. An action may have more than one type, so percentages do not total 100%.

Information checked against published PFD reports and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Data last updated 7 September 2026