First report 24 Jan 2024•Latest report 24 Jan 2024
Recipient record
Reports, concerns and published responses
Other public bodies · Executive non-departmental public body. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.
Reports
1
Naming this recipient
Published responses
100%
Found for named reports
Concerns addressed
8
Across all linked responses
Stated actions
6
Described in responses
Reports over time
Reports over time
Reports naming this recipient by issue year.
Evidence profile
Report topics
Share of this recipient’s reports compared with all other recipients.
100%published responses found
6stated actions described
Topic comparisons are not available in the current evidence snapshot.
Concerns and recipient responses
Statements from Mining Remediation Authority linked to the concerns in each report. Select any concern, action or position to view the source wording.
Addressed to Coal Authority, now represented here by Mining Remediation Authority.
South Wales Central
Concerns raised8
Lack of a specific water safety safety-equipment policy
Absence of signage warning of the dangers of deep and fast-flowing water
Failure to make public activity risk reports readily cross-referenced and accessible to safety inspectors
Failure to consider provision of equipment for rescuing members of the public in difficulty
Inadequate annual safety inspection content, format and decision-making criteria
Lack of a specific water safety risk-assessment policy
Failure to ensure completion of remedial works identified during safety inspections
Failure to provide inspectors with guidance for assessing safeguards against deep and fast-flowing water
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised.5
Action
Implement a Water Safety Procedure guiding risk assessment and decisions on signage, fencing, information and water-rescue equipment.
Stated completedThe respondent said that this action was complete when they made their response on 12 February 2024.
Action
Give Project Managers authority to arrange immediate site repairs costing up to £25,000 without awaiting the budget process.
Stated completedThe respondent said that this action was complete when they made their response on 12 February 2024.
Action
Enhance site-inspection documentation to require pre-inspection checks of prior risk assessments and safety observations reported through Authority systems.
Stated completedThe respondent said that this action was complete when they made their response on 12 February 2024.
Action
Operate the Public Safety Risk Assessment process to classify sites, prioritise visits proportionately and track timely recommendations.
Stated completedThe respondent said that this action was complete when they made their response on 12 February 2024.
Action
Maintain a single system for recording, tracking, reporting and reviewing remedial works arising from public-safety inspections.
Stated completedThe respondent said that this action was complete when they made their response on 12 February 2024.
Respondent positions A position is what this recipient says about the concern when it does not describe a specific action.2
Position
Existing hazard-reporting and online safety systems are considered sufficient to record, action and provide relevant public safety information to inspectors.
Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
Blanket installation of public rescue equipment is not considered appropriate because of vandalism, theft, misuse, limited effectiveness and potential encouragement of water access.
Unable to actThe respondent said that a constraint prevented them from taking the relevant action.