First report 27 Feb 2019•Latest report 27 Feb 2019
Recipient record
Reports, concerns and published responses
Private and voluntary organisations · Private limited company. This page brings together reports naming this recipient and response statements clearly connected to concerns raised in those reports.
Reports
1
Naming this recipient
Published responses
100%
Found for named reports
Concerns addressed
4
Across all linked responses
Stated actions
5
Described in responses
Reports over time
Reports over time
Reports naming this recipient by issue year.
Evidence profile
Report topics
Share of this recipient’s reports compared with all other recipients.
100%published responses found
5stated actions described
Topic comparisons are not available in the current evidence snapshot.
Concerns and recipient responses
Statements from Park Holidays UK Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.
West Sussex
Concerns raised4
Failure to directly inform site contractors of Lake rules
Lack of a physical barrier preventing young children entering the Lake
Inadequate warning signage at Lake entry areas
Failure to provide pictorial signage for people unable to read
Responses linked to these concerns
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised.2
Action
Erect pictorial “no swimming” signs alongside existing written warning signs.
Stated plannedThe respondent said that this action was planned when they made their response on 9 June 2019.
Action
Install additional warning signs around the Park, increasing signage from eight to 24 signs, including signs at both accessible Lake edges.
Stated completedThe respondent said that this action was complete when they made their response on 9 June 2019.
Respondent positions A position is what this recipient says about the concern when it does not describe a specific action.6
Position
The existing number and placement of warning signs are considered adequate to highlight deep-water dangers and prohibit swimming.
Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
It is considered impractical to warn every contractor about lake dangers because risks and assessments are limited to contractors performing relevant tasks.
Unable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Physical barriers around the lake are considered impractical because fisheries concessions require access for fishing and some lakes support water skiing.
Unable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Contractor competence checks, task-specific risk assessments, and existing signage are considered sufficient to address contractors’ awareness of lake rules.
Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
Children unable to read are considered adequately protected by required supervision and parental advice in the safety information pack.
Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
Physical barriers are considered unnecessary because natural vegetation barriers and parental safety advice control the risk of children entering the lake.
Existing arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.