Concerns raised11
Failure to maintain a safe launch distance from a stopper
Exceeding permitted raft capacity for prevailing white water conditions
Lack of pre-activity liaison between rafting provider and Army
Lack of obligation for TIWAG to notify downstream rafting companies of significant discharges
Lack of preparatory training on a less challenging river
Lack of obligation for rafting operators to ascertain significant TIWAG discharges
Failure to dynamically risk assess changing river conditions before launch
Lack of water confidence testing
Failure to rectify identified boat faults
Lack of generic risk assessment for soldier suitability for rafting
Unavailability of a safety kayak
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised.2
-
Action
Prohibit rafting downstream of the storage tanks on days when a discharge is planned.
-
Action
Require evidence of a valid swimming qualification from every participant before future trips.