PFD report

Donald John Drummond MITCHELL · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 17 Jan 2025•South Wales Central

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
1

Raised in this report

Recipients
2

Named on the report

Responses found
1

Of 2 recipients

Stated actions
10

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised1

  1. Unsafe cyclist conditions along the A48 between Pyle and Ewenny
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.5

  1. Action

    Assess existing A48 speed limits against current Welsh local speed-limit guidance.

    Stated by Bridgend County Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 24 January 2025.
  2. Action

    Undertake speed surveys on both sides of the Wells Street junction with the A48.

    Stated by Bridgend County Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 24 January 2025.
  3. Action

    Review existing signs and road markings against current traffic-sign regulations and guidance.

    Stated by Bridgend County Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 24 January 2025.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.2

  1. Position

    Highway safety measures will be implemented where appropriate only if the threshold for accidents at individual sites is met.

    Stated by Bridgend County Borough CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Unsafe cyclist conditions along the A48 between Pyle and Ewenny

Wider context from the report

“(1) Between 2015 and 2024, along the A48 between Pyle and Ewenny which is a 5.75 mile stretch of road, there have been 4 fatal collisions and 8 serious collisions. Of these collisions, 5 involved cyclists. (2) On the basis of the evidence of the nature of the road between Ewenny roundabout and Pyle roundabout (which varies between a single and dual carriageway), the speed limit in place (which varies between 40mph and up to national speed limit), the current absence of an active travel route or modifications to the route to specifically cater for cyclist safety, along with the data available as to the number of collisions along this route relating to cyclist, I remain concerned that there is a risk of future deaths occurring along this route unless action is taken. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Assess existing A48 speed limits against current Welsh local speed-limit guidance.

Verbatim wording from the response

“The Traffic Management Department has undertaken an internal desktop review followed by site assessments of the A48 between Ewenny Roundabout and Pyle Roundabout with the outcome as follows:”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Undertake speed surveys on both sides of the Wells Street junction with the A48.

Verbatim wording from the response

“The Traffic Management Department has undertaken an internal desktop review followed by site assessments of the A48 between Ewenny Roundabout and Pyle Roundabout with the outcome as follows:”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Review existing signs and road markings against current traffic-sign regulations and guidance.

Verbatim wording from the response

“The Traffic Management Department has undertaken an internal desktop review followed by site assessments of the A48 between Ewenny Roundabout and Pyle Roundabout with the outcome as follows:”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue studying high-level options for an active travel link alongside the A48 between Pïcton Court and Laleston roundabouts.

Verbatim wording from the response

“The active travel department continue to undertake a study to provide high level options for an Active Travel Link alongside the A48 between Pïcton Court roundabout and Laleston Roundabout. The Council reviews and updates its list of strategic transport schemes annually and will present to Cabinet later this year with further information on timelines and funding for all projects.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue monitoring reported personal injury collision data to identify accident clusters and trends.

Verbatim wording from the response

“As part of our statutory functions and commitment to our communities and road safety, Bridgend County Borough Council continues to monitor personal injury collision data reported on the public highway to identify accident clusters and trends. Any treatable pattern of accidents identified will have proportional remedial measures put forward for funding and will be prioritised against other locations across the borough.”

Source location

Response from Bridgend County Borough Council
Page 3 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Highway safety measures will be implemented where appropriate only if the threshold for accidents at individual sites is met.

Verbatim wording from the response

“As part of our statutory functions and commitment to our communities and road safety, Bridgend County Borough Council continues to monitor personal injury collision data reported on the public highway to identify accident clusters and trends. Any treatable pattern of accidents identified will have proportional remedial measures put forward for funding and will be prioritised against other locations across the borough.”

Source location

Response from Bridgend County Borough Council
Page 3 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Existing speed limits conform to Welsh guidance, which does not recommend speed limits for individual, isolated locations.

Verbatim wording from the response

“• Existing speed limits have been assessed in line with current Setting Local Speed Limit in Wales (SLSLW) guidance. Considering the character and nature of this road the set speed limits conform to the SLSLW criteria, and the criteria does not recommend the use of speed limits to tackle individual, isolated locations.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.5

  1. 1

    Maintain lighting and LED lanterns along the A48 between Laleston and Broadlands roundabouts, with regular connection checks.

    Stated by Bridgend County Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 24 January 2025.
  2. 2

    Continue highway defect inspections on the A48 carriageway in accordance with highway maintenance guidance.

    Stated by Bridgend County Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 24 January 2025.
  3. 3

    Continue considering the identified actions to determine whether improvements at the location should be prioritised.

    Stated by Bridgend County Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 24 January 2025.
  4. 4

    Review and update the strategic transport schemes list annually.

    Stated by Bridgend County Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 24 January 2025.
  5. 5

    Present further information on strategic transport project timelines and funding to Cabinet.

    Stated by Bridgend County Borough CouncilStated plannedThe respondent said that this action was planned when they made their response on 24 January 2025.

Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.1

  1. 1

    Existing signs and road markings comply with current guidance, so no additional works are required at this time.

    Stated by Bridgend County Borough CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Maintain lighting and LED lanterns along the A48 between Laleston and Broadlands roundabouts, with regular connection checks.

Verbatim wording from the response

“Additionally, I can confirm that the whole section from Laleston Roundabout through to Broadlands Roundabout is in light since April/May 21 and fitted with LED lanterns, with connections regularly checked in accordance with maintenance procedures.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue highway defect inspections on the A48 carriageway in accordance with highway maintenance guidance.

Verbatim wording from the response

“The highway maintenance department continues to carry out highway defect inspections on this carriageway in alignment with the Code of Practise for Highway Maintenance and the County Surveyors Society (Wales) review of the 2016 code.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue considering the identified actions to determine whether improvements at the location should be prioritised.

Verbatim wording from the response

“Consideration of the actions highlighted above will continue, with a view to determining if any improvements at this location are justified as a priority, over and above other schemes alongside our annual program of road safety schemes which are submitted to Welsh Government for consideration.”

Source location

Response from Bridgend County Borough Council
Page 3 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Review and update the strategic transport schemes list annually.

Verbatim wording from the response

“The active travel department continue to undertake a study to provide high level options for an Active Travel Link alongside the A48 between Pïcton Court roundabout and Laleston Roundabout. The Council reviews and updates its list of strategic transport schemes annually and will present to Cabinet later this year with further information on timelines and funding for all projects.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Present further information on strategic transport project timelines and funding to Cabinet.

Verbatim wording from the response

“The active travel department continue to undertake a study to provide high level options for an Active Travel Link alongside the A48 between Pïcton Court roundabout and Laleston Roundabout. The Council reviews and updates its list of strategic transport schemes annually and will present to Cabinet later this year with further information on timelines and funding for all projects.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Existing signs and road markings comply with current guidance, so no additional works are required at this time.

Verbatim wording from the response

“• Review of existing signs and road markings in line with current Traffic Signs Regulations & General Directions 2016 Guidance has been undertaken with no additional works being required at this time.”

Source location

Response from Bridgend County Borough Council
Page 2 · response
Published 24 January 2025

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/2

Data last updated 7 September 2026