Amanda Coppen · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 19 Aug 2016•Inner South London

Published report and response evidence

This report’s concerns and statements found in recipients’ published responses. Statements are included even where no link to an individual concern is recorded. A link shows an evidence connection; it does not assign responsibility.

View original report
Concerns
3

Raised in this report

Recipients
3

Named on the report

Responses found
3

Of 3 recipients

Stated actions
7

Described in responses

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised3

  1. Road layout misleading pedestrians and motorists about traffic direction
    Part of recurring concern: Inadequate control of pedestrian crossing risksPart of recurring concern: Unsafe busway and adjacent-road designPart of recurring concern: Unsafe road design and layout
  2. Potential risk to schoolchildren from increased pedestrian use of junction
  3. Presence of ordinary traffic in the dedicated busway

Stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.7

  1. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Implement the proposed dual-carriageway and bus-lane changes to the road layout at the earliest opportunity, subject to considering consultation responses.

  2. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Conduct joint public consultation on converting the existing arrangement to a dual carriageway with bus lanes.

  3. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Install a raised zebra crossing south of the junction to provide safer pedestrian routes between Millennium Village, the existing school, Pilot Busway and West Parkside.

  4. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Complete feasibility work identifying conversion of the existing layout to a dual carriageway with bus lanes to address road-safety concerns.

  5. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Introduce a 20-mile-per-hour speed limit with road markings and signage along Pilot Busway and West Parkside.

  6. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Improve junction signage and road markings to increase pedestrian awareness of oncoming traffic.

  7. Greater London Authority and Royal Borough of Greenwich and Transport for London

    Review pedestrian safety provisions, including footways and crossings, for the school expansion.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Road layout misleading pedestrians and motorists about traffic direction

Wider context from the report

“The evidence at the inquest was that Ms Coppen was crossing the busway on a signal controlled pedestrian crossing while the signal was red to pedestrians and green to traffic. However, the evidence also suggested that the layout of Pilot Busway and the neighbouring road (West Parkside) is unusual: they run side by side; West Parkside consists of a single carriageway in each direction; Pilot Busway consists of a single dedicated bus lane in each direction. The evidence was that this layout could mislead road users (pedestrians and motorists) into believing that this is a standard dual carriageway. Ordinary traffic has been seen in the dedicated busway, and pedestrians could be misled into looking the wrong way when crossing the road. ”

Is this part of a recurring concern?

Yes — Inadequate control of pedestrian crossing risks; Unsafe busway and adjacent-road design; Unsafe road design and layout.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Potential risk to schoolchildren from increased pedestrian use of junction

Wider context from the report

“I understand that a new school is shortly to be built close to this junction. This may increase the numbers of pedestrians using the junction and there is a potential risk to schoolchildren. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Presence of ordinary traffic in the dedicated busway

Wider context from the report

“The evidence at the inquest was that Ms Coppen was crossing the busway on a signal controlled pedestrian crossing while the signal was red to pedestrians and green to traffic. However, the evidence also suggested that the layout of Pilot Busway and the neighbouring road (West Parkside) is unusual: they run side by side; West Parkside consists of a single carriageway in each direction; Pilot Busway consists of a single dedicated bus lane in each direction. The evidence was that this layout could mislead road users (pedestrians and motorists) into believing that this is a standard dual carriageway. Ordinary traffic has been seen in the dedicated busway, and pedestrians could be misled into looking the wrong way when crossing the road. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Implement the proposed dual-carriageway and bus-lane changes to the road layout at the earliest opportunity, subject to considering consultation responses.

Verbatim wording from the response

“It is the practice of both TfL and Greenwich to undertake local public consultation on significant changes to their road networks. Consistent with those practices, a joint public consultation exercise is underway to seek public and stakeholder opinion on the conversion of the existing arrangement to a dual carriageway with bus lane provision.”

Source location

2016-0299-Response-by-Transport-for-London
Page 2 · response
Published 19 August 2016

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Conduct joint public consultation on converting the existing arrangement to a dual carriageway with bus lanes.

Verbatim wording from the response

“It is the practice of both TfL and Greenwich to undertake local public consultation on significant changes to their road networks. Consistent with those practices, a joint public consultation exercise is underway to seek public and stakeholder opinion on the conversion of the existing arrangement to a dual carriageway with bus lane provision.”

Source location

2016-0299-Response-by-Transport-for-London
Page 2 · response
Published 19 August 2016

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install a raised zebra crossing south of the junction to provide safer pedestrian routes between Millennium Village, the existing school, Pilot Busway and West Parkside.

Verbatim wording from the response

“As stated in your report, following the fatality a site visit was held on 14 January 2016 and was attended by representatives of all three organisations and the Metropolitan Police. Since then, a number of actions have been undertaken to improve road safety at the junction and in the vicinity.”

Source location

2016-0299-Response-by-Transport-for-London
Page 1 · response
Published 19 August 2016

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Complete feasibility work identifying conversion of the existing layout to a dual carriageway with bus lanes to address road-safety concerns.

Verbatim wording from the response

“TfL and Greenwich have been working on developing a solution to address road safety concerns, arising from the unique nature of the road layout. We recognise that significant development is taking place in the area, including the construction of a new school, and that additional movements associated with those developments will increase concerns about road safety.”

Source location

2016-0299-Response-by-Transport-for-London
Page 2 · response
Published 19 August 2016

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Introduce a 20-mile-per-hour speed limit with road markings and signage along Pilot Busway and West Parkside.

Verbatim wording from the response

“As stated in your report, following the fatality a site visit was held on 14 January 2016 and was attended by representatives of all three organisations and the Metropolitan Police. Since then, a number of actions have been undertaken to improve road safety at the junction and in the vicinity.”

Source location

2016-0299-Response-by-Transport-for-London
Page 1 · response
Published 19 August 2016

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Improve junction signage and road markings to increase pedestrian awareness of oncoming traffic.

Verbatim wording from the response

“As stated in your report, following the fatality a site visit was held on 14 January 2016 and was attended by representatives of all three organisations and the Metropolitan Police. Since then, a number of actions have been undertaken to improve road safety at the junction and in the vicinity.”

Source location

2016-0299-Response-by-Transport-for-London
Page 1 · response
Published 19 August 2016

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Review pedestrian safety provisions, including footways and crossings, for the school expansion.

Verbatim wording from the response

“TfL and Greenwich are also reviewing pedestrian safety provisions, including footway and crossings, which are to be provided as expansion of the school takes place.”

Source location

2016-0299-Response-by-Transport-for-London
Page 1 · response
Published 19 August 2016

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
3/3

Data last updated 7 September 2026