PFD report

Ryan Gareth TAYLOR · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 25 May 2021•Cornwall and Isles of Scilly

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
2

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
1

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised2

  1. Failure to implement feasible road drainage improvements
    Part of recurring concern: Inadequate controls for icy and slippery surfacesPart of recurring concern: Inadequate drainage control of hazardous surface water on public routesPart of recurring concern: Inadequate road drainage allowing hazardous surface water to remain on carriageways
  2. Converging surface water on the A390 during heavy rainfall
    Part of recurring concern: Inadequate drainage control of hazardous surface water on public routesPart of recurring concern: Inadequate road drainage allowing hazardous surface water to remain on carriagewaysPart of recurring concern: Unreliable road-surface grip for vehicles
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.1

  1. Action

    Improve drainage by installing combined kerb drainage, additional surface-water gullies, and increased carrier-drain capacity.

    Stated by Corserv Solutions LimitedStated completedThe respondent said that this action was complete when they made their response on 4 January 2023.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to implement feasible road drainage improvements

Wider context from the report

“(1) During periods of heavy rainfall surface water from the adjoining road known as Coliza Hill is likely to converge with surface water on the A390 in the vicinity of where Ryan initially lost control of his car. (2) A rear wheel drive car had been involved in an aquaplaning incident at the same location in similar conditions, four years before this collision. (3) Improvements to road drainage are feasible in this particular location but have not yet been implemented. These improvements may diminish the risks of vehicles aquaplaning due to converging surface water. ”

Is this part of a recurring concern?

Yes — Inadequate controls for icy and slippery surfaces; Inadequate drainage control of hazardous surface water on public routes; Inadequate road drainage allowing hazardous surface water to remain on carriageways.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Converging surface water on the A390 during heavy rainfall

Wider context from the report

“(1) During periods of heavy rainfall surface water from the adjoining road known as Coliza Hill is likely to converge with surface water on the A390 in the vicinity of where Ryan initially lost control of his car. (2) A rear wheel drive car had been involved in an aquaplaning incident at the same location in similar conditions, four years before this collision. (3) Improvements to road drainage are feasible in this particular location but have not yet been implemented. These improvements may diminish the risks of vehicles aquaplaning due to converging surface water. ”

Is this part of a recurring concern?

Yes — Inadequate drainage control of hazardous surface water on public routes; Inadequate road drainage allowing hazardous surface water to remain on carriageways; Unreliable road-surface grip for vehicles.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Improve drainage by installing combined kerb drainage, additional surface-water gullies, and increased carrier-drain capacity.

Verbatim wording from the response

“Significant improvements have now been made to the drainage in the area of Mr Taylor’s accident, at a cost of approximately £370,000. Nearly 500m of combined kerb drainage has been installed, along with additional surface water gullies. The capacity of over 400m of the underlying carrier drains has been increased accordingly to take the additional water flow.”

Source location

Response from Cormac and Cornwall Council
Page 1 · response
Published 4 January 2023

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026