PFD report

Private Robert WOOD and Private Dean HUTCHINSON · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 3 Jun 2014•Wiltshire and Swindon

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
5

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
7

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised5

  1. Fire Diary failing to prioritise fire risk assessment reviews before changes of use or structural alterations
    Part of recurring concern: Fire risk assessment processes failing to respond to material changesPart of recurring concern: Inadequate clarity of fire-safety standards and guidance
  2. Failure to conduct genuinely random silent-hours checks
  3. Fire Diary lacking guidance on contacting expert advice about electrical overloading concerns
    Part of recurring concern: Inadequate clarity of fire-safety standards and guidance
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.5

  1. Action

    Implement the revised DFRMO Fire Risk Assessment template across Defence by the end of October 2014.

    Stated by Ministry of DefenceStated plannedThe respondent said that this action was planned when they made their response on 3 June 2014.
  2. Action

    Amend the DFRMO Fire Diary to require competent fire-risk assessment advice before premises changes or when assessments may be invalid, and strengthen electrical-overloading guidance.

    Stated by Ministry of DefenceStated completedThe respondent said that this action was complete when they made their response on 3 June 2014.
  3. Action

    Amend Fire Non-Commissioned Officer course content to increase time and emphasis on electrical-overloading fire risks.

    Stated by Ministry of DefenceStated completedThe respondent said that this action was complete when they made their response on 3 June 2014.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Fire Diary failing to prioritise fire risk assessment reviews before changes of use or structural alterations

Wider context from the report

“(1) In evidence from ████████ from the Defence Fire Risk Management Organisation, I looked at the modification to the Fire Diary on the subject of fire risk assessments. I have attached a copy of the relevant extract marked “B” and the relevant section is already highlighted. It talks of a review of the fire risk assessment where there has been or there is planned to be a change in use or structure alteration. In evidence a number of witnesses, in particular ████████ who carries out fire risk assessments, agreed that advice should be sought quickly before any change of use or structural alteration. I appreciate that there will be incidences whereby a change of use can take place extremely quickly however I considered that this section did not weight a preference in favour of a review prior to a change of use or any structural alteration taking place. It is my view that the current version gives equal weighting to the 2 options available when the evidence I heard was in favour of advice being sought before a change of use was carried out or any structural alteration taking place. In this particular case the alterations were phased alterations over a period of time and whilst I formed the view that it was speculative on the facts of this particular case that such a review before the change would have made a difference that cannot be said for future incidences. As the evidence I heard supports a preference for such reviews to be undertaken before a change of use or structural alteration takes place I would ask that this be reviewed insofar as the wording is concerned. ”

Is this part of a recurring concern?

Yes — Fire risk assessment processes failing to respond to material changes; Inadequate clarity of fire-safety standards and guidance.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to conduct genuinely random silent-hours checks

Wider context from the report

“(4) It may seem a matter of common sense but in relation to the issue of random checks (“silent hours checks”), what was happening insofar as the Transport Troop tent was concerned in relation to satisfying the obligation to carry out checks between the hours of 2300 hours to 0500 hours the following day was that those responsible if they happened to worked late beyond 2300 hours say until 0000 would regard that as sufficient. More senior officers who gave evidence recognised that such checks to be effective needed to be random. I found this to be failure at individual levels and I would be grateful if the matter could be considered to be used as a training example to reinforce the point to Junior Officers and NCOs on the subject of random checks. I found that random checks been undertaken that it more likely than not would have acted as a deterrent and stopped the practice of all sleeping on duty at night. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Fire Diary lacking guidance on contacting expert advice about electrical overloading concerns

Wider context from the report

“(2) Instruction and training is now given specifically to Junior Fire NCOs as regards recognising the possibility of overloading in relation to electrical appliances. In my decision I found that the absence of such training was a systemic failure contributing to the deaths of both Rob and Dean. In evidence from Captain Hamilton from the Royal Engineers he explained insofar as the chiller cabinet that was used inside the Transport Troop tent was concerned that whilst that may have a specific amperage in relation to the draw of current, he commented that at the start of a cycle when the compressor becomes activated that figure can be multiplied by a factor of between 6 to 10. For example a 2 amp appliance suddenly draws a current of between 12 and 20 amps. He commented that in order to recognise such an issue that this required quite specific training and knowledge attributable to the qualifications of an electrician. As the Fire Diary is the guide to any Junior Fire NCO I would be grateful if you could please confirm that this document includes guidance to relevant Fire NCOs as regards who to contact if they have a concern as regard overloading in order to seek expert advice on the matter. What became very clear during the course of the Inquest is that such matters sometimes have to be explained in very clear terms and levelled so as to be understood at the lowest level of service men/women. ”

Is this part of a recurring concern?

Yes — Inadequate clarity of fire-safety standards and guidance.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure of fire risk assessments to identify sleeping in office accommodation

Wider context from the report

“(3) A copy of the fire risk assessment is, of course, given to the relevant Fire NCO and, of course, the sleeping issue is very much highlighted to all fire risk assessment assessors. In the actual fire risk assessment of the General Support Squadron area that was undertaken on the 3 December 2010 it was not picked up by the relevant fire NCO who, of course, subsequently received a copy of the document stating that sleeping was not taking place. I would be grateful if you could please review the matter in relation to the risk assessment document with a view to considering whether it would be sensible to put a note possibly in bold and/or even capitals on the subject of the declaration in relation to sleeping in office accommodation to act as a reminder to the Fire NCO to check the point. Whilst ████████ referred to the guidance, referring to the use of cots/beds, soldiers of course are resourceful and will sleep at a desk or even on the floor. ”

Is this part of a recurring concern?

Yes — Inadequate fire risk assessments.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Lack of specific Junior Fire NCO training to recognise electrical appliance overloading

Wider context from the report

“(2) Instruction and training is now given specifically to Junior Fire NCOs as regards recognising the possibility of overloading in relation to electrical appliances. In my decision I found that the absence of such training was a systemic failure contributing to the deaths of both Rob and Dean. In evidence from Captain Hamilton from the Royal Engineers he explained insofar as the chiller cabinet that was used inside the Transport Troop tent was concerned that whilst that may have a specific amperage in relation to the draw of current, he commented that at the start of a cycle when the compressor becomes activated that figure can be multiplied by a factor of between 6 to 10. For example a 2 amp appliance suddenly draws a current of between 12 and 20 amps. He commented that in order to recognise such an issue that this required quite specific training and knowledge attributable to the qualifications of an electrician. As the Fire Diary is the guide to any Junior Fire NCO I would be grateful if you could please confirm that this document includes guidance to relevant Fire NCOs as regards who to contact if they have a concern as regard overloading in order to seek expert advice on the matter. What became very clear during the course of the Inquest is that such matters sometimes have to be explained in very clear terms and levelled so as to be understood at the lowest level of service men/women. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Implement the revised DFRMO Fire Risk Assessment template across Defence by the end of October 2014.

Verbatim wording from the response

“Your third concern has been addressed as part of the ongoing review of the DFRMO Fire Risk Assessment template. The template has been updated to further emphasise the need to record if any sleeping is taking place on the premises regardless of its primary purpose. The review is not yet complete but I have attached the latest draft with the changes highlighted for your information. The revised version is planned to be implemented by the end of October 2014.”

Source location

2014-0556-Response
Page 1 · response
Published 3 June 2014

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Amend the DFRMO Fire Diary to require competent fire-risk assessment advice before premises changes or when assessments may be invalid, and strengthen electrical-overloading guidance.

Verbatim wording from the response

“In response to your first two concerns, the Defence Fire Risk Management Organisation (DFRMO) Fire Diary has been amended to make it clear that the advice of a competent fire risk assessor must be sought before any changes take place within a premise or if there is a suspicion that the fire risk assessment is no longer valid; and to provide additional guidance and advice on the risks of electrical overloading including the need to contact a competent electrician if there are concerns. The revised Fire Diary is enclosed for your information. The Fire Non-Commissioned Officer (NCO) course content has also been amended and now allocates more time and emphasis on the fire risks associated with electrical overloading. A copy of the PowerPoint presentation delivered on this course is also enclosed for your information.”

Source location

2014-0556-Response
Page 1 · response
Published 3 June 2014

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Amend Fire Non-Commissioned Officer course content to increase time and emphasis on electrical-overloading fire risks.

Verbatim wording from the response

“In response to your first two concerns, the Defence Fire Risk Management Organisation (DFRMO) Fire Diary has been amended to make it clear that the advice of a competent fire risk assessor must be sought before any changes take place within a premise or if there is a suspicion that the fire risk assessment is no longer valid; and to provide additional guidance and advice on the risks of electrical overloading including the need to contact a competent electrician if there are concerns. The revised Fire Diary is enclosed for your information. The Fire Non-Commissioned Officer (NCO) course content has also been amended and now allocates more time and emphasis on the fire risks associated with electrical overloading. A copy of the PowerPoint presentation delivered on this course is also enclosed for your information.”

Source location

2014-0556-Response
Page 1 · response
Published 3 June 2014

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue reviewing the DFRMO Fire Risk Assessment template to emphasise recording sleeping on premises regardless of primary purpose.

Verbatim wording from the response

“Your third concern has been addressed as part of the ongoing review of the DFRMO Fire Risk Assessment template. The template has been updated to further emphasise the need to record if any sleeping is taking place on the premises regardless of its primary purpose. The review is not yet complete but I have attached the latest draft with the changes highlighted for your information. The revised version is planned to be implemented by the end of October 2014.”

Source location

2014-0556-Response
Page 1 · response
Published 3 June 2014

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Amend CLM training documentation to use this incident as an example of incorrect sub-unit duty NCO duties, for delivery from 30 September 2014.

Verbatim wording from the response

“In response to your fourth concern, the Army plans to use this incident as an example of what happens when ‘duties’ are not conducted in the correct way. This will include, as part of the biannual command, leadership and management (CLM) training update, an amendment to the training documentation related to the duties of a sub-unit duty NCO to incorporate this incident as an example. The revised documentation will be used by training deliverers from 30 September 2014 onwards.”

Source location

2014-0556-Response
Page 1 · response
Published 3 June 2014

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.2

  1. 1

    Inform Top Level Budget Chief Environment and Safety Officers of the actions taken and the need to implement necessary changes and update relevant documentation.

    Stated by Ministry of DefenceStated completedThe respondent said that this action was complete when they made their response on 3 June 2014.
  2. 2

    Publish a Defence Instruction or Notice covering the fire-safety issues and required action, with wide distribution across Defence.

    Stated by Ministry of DefenceStated completedThe respondent said that this action was complete when they made their response on 3 June 2014.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Inform Top Level Budget Chief Environment and Safety Officers of the actions taken and the need to implement necessary changes and update relevant documentation.

Verbatim wording from the response

“You should note that while the above action in relation to the fire risk assessment template is applicable across Defence, the matters relating to the Fire Diary only apply to the Army. The other Services do not use the DFRMO Fire Diary; all fire safety related information is contained in Unit Stations Standing Orders, Fire Orders, Standard Operating Procedures and Fire Notices. DFRMO has written to all Top Level Budget¹ Chief Environment and Safety Officers to inform them of actions DFRMO has taken in response to your concerns and to make them aware of the need to implement any necessary changes and update the relevant documentation.”

Source location

2014-0556-Response
Page 2 · response
Published 3 June 2014

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Publish a Defence Instruction or Notice covering the fire-safety issues and required action, with wide distribution across Defence.

Verbatim wording from the response

“A Defence Instruction or Notice² has also been published covering these issues and the action that is required to address them, to ensure that the matters receive the widest distribution and any gaps in distribution are covered. This was published earlier this month; I enclose a copy for your information.”

Source location

2014-0556-Response
Page 2 · response
Published 3 June 2014

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026