This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.
On 20th April 2018 Ms Nadia Persaud opened an investigation touching upon the death of Ms Ashlie Clarie Lianna Timms
Ms Persaud opened an inquest on 1st June 2018, the inquest was heard, before a jury commencing on 21st March 2022 and concluding on 12th April 2022.
The jury arrived at a narrative conclusion.
“Ashlie Claire Liana Timms died from the effects of burns and inhalation of fire products on 20 April 2018, whilst a resident within a supported living setting at 20 B Connington Crescent Chingford London.
Due to the ignition of fabric materials by a fan heater, a significant fire developed within the premises.
The presence of a fire detection system, which was not installed to alert the emergency services, alerted staff employed to support and care for residents, to the presence of the fire.
As a result of staff interpreting the address location on the alarm display, which was known by the wider organisation to be incorrect, staff departed from basic fire evacuation procedures. This resulted in up to a 45 minute delay to summon emergency services, demonstrating a significant lack of urgency to do so.
With the additional actions of staff resetting the fire alarm on at least two occasions and the absence of implementing the deceased's personal emergency evacuation plan, the deceased was not evacuated.
The presence of an electronic code disabling locking mechanism for the deceased to navigate, at the main point of escape, presented additional obstacles for the deceased in an already highly stressful situation. All of which contributed towards her death.
With the absence of an effective fire safety audit in 2017. The discovery of departures from British fire standards and recommendations, conflicting organisational fire policies and fire risk assessments went unchallenged.
All areas identified above, in combination with the lack of a bespoke fire related policy and fire risk assessments contributed towards her death.”
The medical cause of death was found to be;
1.a. Burns and inhalation of the products of fire
Circumstances of the death
Ashlie Timms was a 46 year old woman who lived in a self-contained flat in a supported accommodation unit. Ms Timms suffered from physical disabilities, a moderate learning disability, and a borderline personality disorder.
On 20ᵗʰ April 2018, a fire broke out in Ashlie’s bedroom at a time between 01.30 and 02.00 hrs. The most likely cause of the fire was combustible material coming into contact with a portable electric fan heater located near the foot of Ashlie’s bed.
Fire detectors in Ashlie’s room triggered a fire alarm system which sounded in the unit.
Staff at the unit inspected the fire alarm panel which directed them to a room at the opposite side of the building to Ashlie’s flat. Staff did not evacuate the building or call for the emergency services in contravention of the operator’s policies and national guidance.
The fire alarm in the unit was not capable of automatically calling the fire and rescue services.
Staff searched the premises for signs of a fire and when they were unable to locate smoke or flames, they reset the fire alarm.
Staff later inspected Ashlie's flat and discovered a well-established fire. Thick smoke prevented them from entering and extracting Ashlie.
999 was called at 02.13 hrs.
Staff actions led to a delay of between 43 and 28 minutes in calling 999.
Firefighters attended the premises within 5 minutes of the 999 call. The fire spread throughout the building and was eventually brought under control at 05.30.
Ashlie was found deceased in the hallway of her flat, in front of the front door.
A fire investigation found that the lock on Ashlie’s door was operated by a 4 digit key-pad both internally and externally. Despite the presence of a fail-safe, activated by the fire alarm which would have deactivated these locks. The presence of a key-pad on an exit was described as both unusual and dangerous.
Fire safety procedures, policies and risk assessments in place at the unit were found to be unfit for purpose.
A London fire brigade fire safety audit of the premises on 3ʳᵈ October 2017 found that staff training and fire risk assessments were suitable and sufficient. The audit was determined to have been flawed.
Coroner’s concerns
1. The operator of the premises failed to ensure that staff on duty were competent to carry out a fire evacuation. Despite reflection and remediation in policies, processes and training, multiple staff members who gave evidence to the inquest, remained unable to describe the proper action to take in the event of a fire alarm.
2. Fire Alarms in three units operated Sequence Care Group remain non-compliant with the 2013 British Standard Guidance, which recommends that they should have a link to an Alarm Receiving Centre (“ARC”) which automatically contacts the emergency services when a fire alarm is activated.
3. The London Fire Brigade conducted fire safety audits at the premises which assessed the unit as displaying the highest standard of fire safety compliance. These findings were found to be entirely incongruent with procedures, equipment and staff training in place before and at the time of the fire. The London Fire Brigade have reviewed and changed processes since 2018 but they remain incomplete.
4. No clear and practical guidance exists on how specialist housing operators should manage the use of high-risk electrical devices such as portable electric fan heaters.
5. No clear guidance exists regarding the fitting of digital key-pad locks on doors in specialist housing.
6. Insufficient emphasis is placed upon recommendations contained within British Standards regarding automatic connections to ARCs in fire alarms fitted in specialist accommodation.
Concerns and recipient responses
Select any concern, action or position to view the source wording.
Report evidence summary
Concerns raised7
Non-compliant fire alarms lacking automatic links to an Alarm Receiving Centre
Each statement is shown once, even when linked to more than one concern.
Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.20
Action
Lead the review of the competency framework for Fire Safety Regulators and the enforcement toolkit for high-rise buildings.
Stated byNational Fire Chiefs CouncilStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Influence the content of new or amended fire protection and safety standards.
Stated byNational Fire Chiefs CouncilStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Report the staff competency concern to relevant committees to encourage debate and pursue improved outcomes.
Stated byNational Fire Chiefs CouncilStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
Action
Work with the Home Office on guidance review and revision to address risks concerning high-risk electrical devices and digital keypad locks.
Stated byNational Fire Chiefs CouncilStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Report the alarm connection concern to relevant British Standards committees to encourage debate and pursue improved outcomes.
Stated byNational Fire Chiefs CouncilStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
Action
Amend fire safety audit forms to require improved justification for overall and article-level compliance scores.
Stated byLondon Fire CommissionerStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
Action
Continue advocating with government, regulators and the sector for legislative change enabling enforcement of relevant British Standard requirements.
Stated byLondon Fire CommissionerStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Apply third-party accreditation to fire safety inspectors auditing or advising higher-risk premises, beginning with an initial assessment tranche.
Stated byLondon Fire CommissionerStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Attend the premises and conduct a regulatory audit under the Fire Safety Order after the 56-day reply period.
Stated byLondon Fire CommissionerStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
Action
Add resources and develop and roll out training for staff involved in management vetting of audit forms and Enforcement Notices.
Stated byLondon Fire CommissionerStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Expand manager vetting requirements for fire safety regulatory audits and promulgate the clarified policy to technical fire safety staff.
Stated byLondon Fire CommissionerStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
Action
Review LFB guidance on portable electric fan heaters in specialist housing.
Stated byLondon Fire CommissionerStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Press for guidance on digital keypad fitting that does not inhibit escape from domestic premises during a fire.
Stated byLondon Fire CommissionerStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Action
Consider strengthening standards commentary on zone plans, including their life-safety importance and potential non-conformity.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
Action
Consider recommending that users establish local fire-and-rescue-service policies for automatic fire-alarm responses and confirm premises coverage.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
Action
Provide annual face-to-face fire warden training to all employees, including new joiners at the next available session.
Stated byKennedysStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
Action
Provide premises-specific induction training and annual refresher training to permanent and agency staff.
Stated byKennedysStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
Action
Update two homes’ fire alarm systems and install Alarm Receiving Centre links, with completion scheduled for 24 June 2022.
Stated byKennedysStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
Action
Complete and activate the Alarm Receiving Centre link for one home’s fire alarm system.
Stated byKennedysStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
Action
Conduct annual fire-safety competency assessments using the revised checklist and reassess staff against it.
Stated byKennedysStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.15
Position
Enforcement of fire safety regulations is outside the organisation’s functions because it is not an enforcing authority and has no regulatory functions.
Stated byNational Fire Chiefs CouncilOutside remitThe respondent said that this matter was outside its role or authority.
Position
The existing specialised housing guide satisfactorily addresses risks associated with fitting digital keypad locks in specialist housing.
Stated byNational Fire Chiefs CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
Dynamic sector scrutiny, review and reform prevent providing a definite timetable for completing the proposed standards and competency-related work.
Stated byNational Fire Chiefs CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Existing statutory care-home guidance and the specialised housing guide satisfactorily address risks from high-risk electrical devices.
Stated byNational Fire Chiefs CouncilExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
LFB cannot enforce controls on tenants’ portable heaters where lease or tenancy terms limit providers’ options and officers lack enforcement powers.
Stated byLondon Fire CommissionerUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
British Standard recommendations cannot be directly enforced without legislative authority or a demonstrable safety risk arising from non-compliance.
Stated byLondon Fire CommissionerUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
LFB cannot enforce locking devices on exits from private domestic dwellings because they fall outside Fire Safety Order regulation.
Stated byLondon Fire CommissionerUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Position
Where alternative arrangements provide an equivalent safety level, no enforceable risk exists requiring compliance with British Standard ARC recommendations.
Stated byLondon Fire CommissionerExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.
Position
National fire safety guidance matters under the Fire Safety Order should be raised with the Home Office, which has the statutory guidance duty.
Stated byLondon Fire CommissionerRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Housing hazard guidance matters outside the Fire Safety Order should be raised with the Department for Levelling Up, Housing and Communities.
Stated byLondon Fire CommissionerRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Fire detection installation and servicing issues should be examined by subcommittee FSH/12/1, which is responsible for the relevant standards.
Stated byBritish Standards InstitutionRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Key-lock issues may be considered by subcommittee FSH/12/4 through a forthcoming amendment to BS 7273-4.
Stated byBritish Standards InstitutionRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
Fire precaution issues should be examined by technical committee FSH/14, which is responsible for relevant building fire-safety standards.
Stated byBritish Standards InstitutionRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
Position
The three homes did not follow British Standards guidance but were not non-compliant with the applicable requirements.
Stated byKennedysDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
Position
Completion of alarm system upgrades at two homes was delayed because the implementing team was absent due to Covid-19.
Stated byKennedysUnable to actThe respondent said that a constraint prevented them from taking the relevant action.
Other statements in published responses
These actions and other statements could not be clearly connected to one concern in this report.
Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.16
1
Operate the third-party professional accreditation scheme for Fire Safety Regulators.
Stated byNational Fire Chiefs CouncilStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
2
Operate the national learning platform supporting continuing professional development for Fire Safety Regulators.
Stated byNational Fire Chiefs CouncilStated completedThe respondent said that this action was complete when they made their response on 29 April 2022.
3
Work with the Care Quality Commission to formalise person-centred fire risk assessments within care providers’ care-planning processes.
Stated byNational Fire Chiefs CouncilStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
4
Send the Report and response to all English fire and rescue services to disseminate the concerns and proposed actions.
Stated byNational Fire Chiefs CouncilStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
5
Continue supporting the Fire Standards Board in its standards-related work.
Stated byNational Fire Chiefs CouncilStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
6
Continue supporting HMICFRS in its assessments and improvement-related work.
Stated byNational Fire Chiefs CouncilStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
7
Develop and roll out refreshed mandatory CPD on risks in care homes, extra-care, sheltered and supported-living premises.
Stated byLondon Fire CommissionerStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
8
Conduct a full review of training and CPD materials for vulnerable sleeping-risk premises.
Stated byLondon Fire CommissionerStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
9
Highlight portable-heater risks to housing providers in primary-authority partnerships and the G15 group.
Stated byLondon Fire CommissionerStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
10
Consider adding guidance that fire alarms must not be reset until the cause of the alarm is resolved.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
11
Consider adding guidance for users to request periodic reviews of fire-detector addresses.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
12
Review BS 5839-6:2019+A1:2020 against the identified fire-detection and alarm-system safety issues.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
13
Consider guidance addressing event-log capacity and the need for additional recording capacity in addressable systems.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
14
Consider creating a list of system variations that cannot be accepted as compliant and requiring their justification.
Stated byBritish Standards InstitutionStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
15
Train registered and deputy managers to conduct the annual competency assessments through SOCOTEC.
Stated byKennedysStated plannedThe respondent said that this action was planned when they made their response on 29 April 2022.
16
Carry out additional training sessions to address staff members’ outstanding training needs.
Stated byKennedysStated in progressThe respondent said that this action was in progress when they made their response on 29 April 2022.
Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.1
1
A code of practice has limits on recommendations, and technical limitations affect increasing fire-alarm event-log capacity.
Stated byBritish Standards InstitutionUnable to actThe respondent said that a constraint prevented them from taking the relevant action.