Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
2

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
4

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised2

  1. Insufficient path width for safe sharing by pedestrians and cyclists
    Part of recurring concern: Insufficient width for safe cyclist passagePart of recurring concern: Unsafe shared cycle and pedestrian route design
  2. Failure to control cyclists’ use and speed in close proximity to pedestrians
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.3

  1. Action

    Undertake volunteer vegetation clearance around the Iffley Lock site.

    Stated by Oxfordshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 5 November 2024.
  2. Action

    Organise promotional events with partners and user groups to highlight safe and responsible towpath use.

    Stated by Oxfordshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 5 November 2024.
  3. Action

    Audit and review existing towpath signage, including whether additional signs would benefit key entrance points.

    Stated by Oxfordshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 5 November 2024.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Insufficient path width for safe sharing by pedestrians and cyclists

Wider context from the report

“The concern relates to the safety of users, particularly pedestrians who appear to at greatest risk of injury as was the case with Mrs Friedhoff. Indeed, the speed of the cyclist was not excessive in this case but the injuries caused in the subsequent fall were serious. I understand this part of the path at the lock is popular with pedestrians and cyclists. It is a shared space, albeit strictly speaking it is a footpath and cyclists are not permitted to use it unless they have permission. In reality it is heavily used by cyclists for leisure and commuting and some cyclists travel at significant speed in close proximity to pedestrians. One of the main problems is that the path at the location of Mrs Friedhoff’s accident is only about 2 metres wide. A short distance before this the path is only 1.6 metres wide. I understand from ████████ that national guidance for such a path is 3.5 metres. Mrs Friedhoff’s sons are very familiar with the location and describe it as normal pavement width but with cyclists permitted to cycle on it, thereby creating an obvious accident risk. It is also noteworthy that the surface of the path has been upgraded in recent years which, in all probability, has encouraged its use by cyclists and enabled them to cycle faster. I appreciate that OCC, and perhaps the Environment Agency, have given considerable thought to the safety issue and have not found a clear solution. It is not for me to make recommendations but I do request a further review to see if there are any mitigating measures, not least with clear signage reminding users, particularly cyclists, of the need to take care and slow down around pedestrians. At inquest, there was some evidence and discussion in relation to the following; -A communications package, perhaps with a public consultation element. -Stronger enforcement ( I understand the Environment Agency do not permit cyclists to cycle through locks and there are signs about this but do so nevertheless). I appreciate it is difficult to enforce this and the focus may necessarily be on speed. -Gates or similar to slow cyclists. -Segregation lines but the narrow width of the path no doubt makes this problematic. -Reconfiguring so that the path is redirected through the small woods that are present at the location. This may afford the opportunity to have 2 separate paths at the location, one that is gated for pedestrians and one for cyclists. In short, given my concern that accidents may continue to occur that could result in death, OCC are asked to carry out a safety review in conjunction with the Environment Agency and other stakeholders where appropriate. ”

Is this part of a recurring concern?

Yes — Insufficient width for safe cyclist passage; Unsafe shared cycle and pedestrian route design.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to control cyclists’ use and speed in close proximity to pedestrians

Wider context from the report

“The concern relates to the safety of users, particularly pedestrians who appear to at greatest risk of injury as was the case with Mrs Friedhoff. Indeed, the speed of the cyclist was not excessive in this case but the injuries caused in the subsequent fall were serious. I understand this part of the path at the lock is popular with pedestrians and cyclists. It is a shared space, albeit strictly speaking it is a footpath and cyclists are not permitted to use it unless they have permission. In reality it is heavily used by cyclists for leisure and commuting and some cyclists travel at significant speed in close proximity to pedestrians. One of the main problems is that the path at the location of Mrs Friedhoff’s accident is only about 2 metres wide. A short distance before this the path is only 1.6 metres wide. I understand from ████████ that national guidance for such a path is 3.5 metres. Mrs Friedhoff’s sons are very familiar with the location and describe it as normal pavement width but with cyclists permitted to cycle on it, thereby creating an obvious accident risk. It is also noteworthy that the surface of the path has been upgraded in recent years which, in all probability, has encouraged its use by cyclists and enabled them to cycle faster. I appreciate that OCC, and perhaps the Environment Agency, have given considerable thought to the safety issue and have not found a clear solution. It is not for me to make recommendations but I do request a further review to see if there are any mitigating measures, not least with clear signage reminding users, particularly cyclists, of the need to take care and slow down around pedestrians. At inquest, there was some evidence and discussion in relation to the following; -A communications package, perhaps with a public consultation element. -Stronger enforcement ( I understand the Environment Agency do not permit cyclists to cycle through locks and there are signs about this but do so nevertheless). I appreciate it is difficult to enforce this and the focus may necessarily be on speed. -Gates or similar to slow cyclists. -Segregation lines but the narrow width of the path no doubt makes this problematic. -Reconfiguring so that the path is redirected through the small woods that are present at the location. This may afford the opportunity to have 2 separate paths at the location, one that is gated for pedestrians and one for cyclists. In short, given my concern that accidents may continue to occur that could result in death, OCC are asked to carry out a safety review in conjunction with the Environment Agency and other stakeholders where appropriate. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Undertake volunteer vegetation clearance around the Iffley Lock site.

Verbatim wording from the response

“(2) Vegetation clearance – Whilst it is noted that the fatality took place in December when typically, overgrown trees/ vegetation may be less of a factor, both organisations appreciate that especially during summer months vegetation growth can restrict user space and visibility increasing the likelihood of conflict. Both the county council and”

Source location

Response from Oxfordshire County Council
Page 1 · response
Published 5 November 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Organise promotional events with partners and user groups to highlight safe and responsible towpath use.

Verbatim wording from the response

“Additionally, we are proposing to organise with partners and user groups a series of promotional events spread throughout the year would highlight safe and responsible use of the towpath. As an example, there are several annual high-profile rowing events along the river in the spring / summer period resulting in increased usage. It is proposed that promotional activity at events like these could provide a meaningful impact with a potentially large catchment of users. Similar events focusing on the councils Vision Zero programme have been held in Oxford over recent years and have had positive feedback. We consider this measure would have a beneficial relevance and reach to the wider towpath route including the Iffley lock site. We plan to commence this from spring 2025.”

Source location

Response from Oxfordshire County Council
Page 2 · response
Published 5 November 2024

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Audit and review existing towpath signage, including whether additional signs would benefit key entrance points.

Verbatim wording from the response

“(3) Signage and promotion – It is noted that there is already various signage in the vicinity of the site and along the towpath. This said, a review of signage will be undertaken to give consideration for whether additional signage would be beneficial including at key entrance points along the towpath. We aim to carry out an audit of signage in winter/ early 2025 with implementation of any appropriate measures expected for the summer 2025.”

Source location

Response from Oxfordshire County Council
Page 2 · response
Published 5 November 2024

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.1

  1. 1

    Conduct seasonal surveys of cycling and pedestrian use, including user volumes, types and speeds, around Iffley Lock.

    Stated by Oxfordshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 5 November 2024.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Conduct seasonal surveys of cycling and pedestrian use, including user volumes, types and speeds, around Iffley Lock.

Verbatim wording from the response

“(1) Improved understanding – Whilst both the county council and EA have a solid understanding of the area and user behaviour, we consider it beneficial to undertake some surveying of people cycling and pedestrian use in the Iffley lock area. This will enable us to better quantify the volumes / type of pedestrian and cycle users in the area as well as details on speed. As usage is affected by seasonality and wider events, we plan to carry out this monitoring spring/ summer 2025.”

Source location

Response from Oxfordshire County Council
Page 1 · response
Published 5 November 2024

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026