PFD report

Mark Nicholas Welsh · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 28 Dec 2017•Inner North London

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
3

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
2

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised3

  1. Failure to consider proportionate pedestrian-crossing options at the junction
    Part of recurring concern: Inadequate control of pedestrian crossing risks
  2. Delays in delivering pedestrian safety improvements at the crossroads
    Part of recurring concern: Inadequate control of pedestrian crossing risks
  3. Failure to include overall collision incidence and reported near misses in traffic-control assessments
    Part of recurring concern: Unreliable highway safety risk assessment and remedial-work prioritisation
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.2

  1. Action

    Continue working with Camden Council to develop designs enabling safer pedestrian and cycle facilities at the junction and nearby locations.

    Stated by Transport for LondonStated in progressThe respondent said that this action was in progress when they made their response on 28 December 2017.
  2. Action

    Progress a banned turning movement and implement a signal-controlled pedestrian crossing on Dukes Road, subject to Camden Council agreement.

    Stated by Transport for LondonStated plannedThe respondent said that this action was planned when they made their response on 28 December 2017.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.2

  1. Position

    Network capacity and projected congestion impacts prevent TfL from introducing crossings that require holding traffic at the junction.

    Stated by Transport for LondonUnable to actThe respondent said that a constraint prevented them from taking the relevant action.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to consider proportionate pedestrian-crossing options at the junction

Wider context from the report

“I heard at inquest that: • Transport for London (TfL) made a decision in 2007 that it would not undertake any consideration of pedestrian crossings at that crossroads until after the completion of HS1; • £50,000 was paid to TfL in 2009 by UNISON as part of planning permission to allow building on the opposite corner, £20,000 of which was used on a feasibility study in 2013, but TfL decided that traffic flow would be impeded by four pedestrian crossings, so none was installed and use was not made of the remaining £30,000; • UNISON has made several complaints to Camden Council/TfL about the dangers of this particular crossroads, but TfL’s best expectation of delivery of any improvement is for the year 2020. I appreciate that every decision about traffic control at one junction must be taken in the context of the whole network, but 13 years after the issue was first raised seems an inordinately long time to wait for some improvement at such a busy crossroads (about which there had been several complaints prior to this fatality). Consideration of the junction was described to me as being based on four new crossings or none, which I did not quite understand. The statistics upon which TfL decisions about traffic control are based, were described to me by TfL’s lead sponsor as only taking account of the proportion of collisions/accidents that result in serious injury or death, not taking into account the overall incidence of collisions/accidents (or even taking into account reported near misses). This seems an omission. ”

Is this part of a recurring concern?

Yes — Inadequate control of pedestrian crossing risks.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Delays in delivering pedestrian safety improvements at the crossroads

Wider context from the report

“I heard at inquest that: • Transport for London (TfL) made a decision in 2007 that it would not undertake any consideration of pedestrian crossings at that crossroads until after the completion of HS1; • £50,000 was paid to TfL in 2009 by UNISON as part of planning permission to allow building on the opposite corner, £20,000 of which was used on a feasibility study in 2013, but TfL decided that traffic flow would be impeded by four pedestrian crossings, so none was installed and use was not made of the remaining £30,000; • UNISON has made several complaints to Camden Council/TfL about the dangers of this particular crossroads, but TfL’s best expectation of delivery of any improvement is for the year 2020. I appreciate that every decision about traffic control at one junction must be taken in the context of the whole network, but 13 years after the issue was first raised seems an inordinately long time to wait for some improvement at such a busy crossroads (about which there had been several complaints prior to this fatality). Consideration of the junction was described to me as being based on four new crossings or none, which I did not quite understand. The statistics upon which TfL decisions about traffic control are based, were described to me by TfL’s lead sponsor as only taking account of the proportion of collisions/accidents that result in serious injury or death, not taking into account the overall incidence of collisions/accidents (or even taking into account reported near misses). This seems an omission. ”

Is this part of a recurring concern?

Yes — Inadequate control of pedestrian crossing risks.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to include overall collision incidence and reported near misses in traffic-control assessments

Wider context from the report

“I heard at inquest that: • Transport for London (TfL) made a decision in 2007 that it would not undertake any consideration of pedestrian crossings at that crossroads until after the completion of HS1; • £50,000 was paid to TfL in 2009 by UNISON as part of planning permission to allow building on the opposite corner, £20,000 of which was used on a feasibility study in 2013, but TfL decided that traffic flow would be impeded by four pedestrian crossings, so none was installed and use was not made of the remaining £30,000; • UNISON has made several complaints to Camden Council/TfL about the dangers of this particular crossroads, but TfL’s best expectation of delivery of any improvement is for the year 2020. I appreciate that every decision about traffic control at one junction must be taken in the context of the whole network, but 13 years after the issue was first raised seems an inordinately long time to wait for some improvement at such a busy crossroads (about which there had been several complaints prior to this fatality). Consideration of the junction was described to me as being based on four new crossings or none, which I did not quite understand. The statistics upon which TfL decisions about traffic control are based, were described to me by TfL’s lead sponsor as only taking account of the proportion of collisions/accidents that result in serious injury or death, not taking into account the overall incidence of collisions/accidents (or even taking into account reported near misses). This seems an omission. ”

Is this part of a recurring concern?

Yes — Unreliable highway safety risk assessment and remedial-work prioritisation.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue working with Camden Council to develop designs enabling safer pedestrian and cycle facilities at the junction and nearby locations.

Verbatim wording from the response

“We will continue working with Camden Council to develop a design for this junction and others in the near vicinity which will enable more and safer pedestrian and cycle facilities to be provided thereby encouraging people to walk, cycle or use public transport.”

Source location

2017-0456-Response-by-Transport-for-Lonodn
Page 3 · response
Published 28 December 2017

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Progress a banned turning movement and implement a signal-controlled pedestrian crossing on Dukes Road, subject to Camden Council agreement.

Verbatim wording from the response

“Subject to Camden Council agreement, we intend to progress a banned turning movement in order to provide a signal controlled crossing on Dukes Road – to be implemented next year.”

Source location

2017-0456-Response-by-Transport-for-Lonodn
Page 3 · response
Published 28 December 2017

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Network capacity and projected congestion impacts prevent TfL from introducing crossings that require holding traffic at the junction.

Verbatim wording from the response

“We have been working closely with Camden Council to deliver a design for this junction that improves the safety for pedestrians and other vulnerable road users, and a history of our work on this was submitted to you as part of our evidence to the inquest. However, our decisions about traffic control and the use of signals must be coordinated with the surrounding road network to prevent excessive congestion, which is likely to have impacts both on safety and air pollution. The roads in this area are currently operating at the maximum level of capacity, and it has proved very difficult to find a solution for this junction which is acceptable both to us and Camden Council given potential local and wider traffic impacts, and does not have significant negative impacts elsewhere.”

Source location

2017-0456-Response-by-Transport-for-Lonodn
Page 2 · response
Published 28 December 2017

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

TfL relies on police-reported collision data and existing prioritisation methods because damage-only collisions and near misses cannot be recorded consistently.

Verbatim wording from the response

“There is no consistent way of recording damage-only collisions, as the police don’t routinely attend site or require those involved to report the incident. A damage-only collision may be relatively trivial (i.e. scraping a wing mirror), and may not even be taken into account by insurance companies (who would be the other potential source of data). There is also no reasonable way of recording near misses, and it would be impossible to ensure consistency throughout the reporting.”

Source location

2017-0456-Response-by-Transport-for-Lonodn
Page 2 · response
Published 28 December 2017

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026