Josie Archer-Smith · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 7 Dec 2022•Mid Kent and Medway

Published report and response evidence

This report’s concerns and statements found in recipients’ published responses. Statements are included even where no link to an individual concern is recorded. A link shows an evidence connection; it does not assign responsibility.

View original report
Concerns
1

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
6

Described in responses

Recipients and published responses

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised1

  1. Failure of road drainage to prevent water running across the carriageway
    Part of recurring concern: Inadequate drainage control of hazardous surface water on public routesPart of recurring concern: Inadequate road drainage allowing hazardous surface water to remain on carriageways

Stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.6

  1. National Highways

    Replace the distributor road’s vehicle restraint system and drainage as part of the refurbishment scheme.

  2. National Highways

    Jet and survey the London-bound drainage system to improve drainage efficiency and identify remedial requirements.

  3. National Highways

    Configure overhead variable-message signs to warn drivers of skid risk or surface water when carriageway water is confirmed.

  4. National Highways

    Complete drainage remedial works, including cleaning channels, drains, gullies and catchpits, repairing drainage pitches, installing a drainage pipe and adding an asphalt kerb.

  5. National Highways

    Install temporary flooding-warning signs on the London-bound mainline until permanent works are complete.

  6. National Highways

    Deliver the M20 Medway and Allington Deck Refurbishment scheme, including carriageway refurbishment and higher-grip, faster-draining Hot Rolled Asphalt surfacing.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure of road drainage to prevent water running across the carriageway

Wider context from the report

“The M20, a dual lane motorway, at the location where the collision took place has had a number of collisions occur which appear to have been caused by water/aquaplaning. Investigating police from the Serious Collisions Investigation unit commented that they are aware that this location is a problem in heavy weather and have attended collisions at this location in the past. The crash location is at the bottom of an incline on the M20 motorway which normally would not cause an issue, however the road also has a camber which causes water to run across the carriageway rather than draining into either the central reservation of the drain on the hard shoulder. The police officer believes that it is when this heavy water is running across the carriageway that there is an issue which does require further investigation as to any remedial works that can be completed to prevent any further fatal/serious injury collisions. ”

Is this part of a recurring concern?

Yes — Inadequate drainage control of hazardous surface water on public routes; Inadequate road drainage allowing hazardous surface water to remain on carriageways.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Replace the distributor road’s vehicle restraint system and drainage as part of the refurbishment scheme.

Verbatim wording from the response

“The M20 Medway and Allington Deck Refurbishment scheme is due to be delivered between June and July 2023 at an estimated cost of £3 million.”

Source location

Response from National Highways Limited
Page 3 · response
Published 19 December 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Jet and survey the London-bound drainage system to improve drainage efficiency and identify remedial requirements.

Verbatim wording from the response

“In the days immediately following the collision, and then over a period of approximately 18 months (as road space booking allowed for the lane closures) National Highways staff and our contractors carried out the following actions:”

Source location

Response from National Highways Limited
Page 2 · response
Published 19 December 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Configure overhead variable-message signs to warn drivers of skid risk or surface water when carriageway water is confirmed.

Verbatim wording from the response

“In the days immediately following the collision, and then over a period of approximately 18 months (as road space booking allowed for the lane closures) National Highways staff and our contractors carried out the following actions:”

Source location

Response from National Highways Limited
Page 2 · response
Published 19 December 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Complete drainage remedial works, including cleaning channels, drains, gullies and catchpits, repairing drainage pitches, installing a drainage pipe and adding an asphalt kerb.

Verbatim wording from the response

“• Remedial works carried out following a full CCTV drainage survey: ◦ Traffic management put in place to carry out the works:”

Source location

Response from National Highways Limited
Page 2 · response
Published 19 December 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install temporary flooding-warning signs on the London-bound mainline until permanent works are complete.

Verbatim wording from the response

“In the days immediately following the collision, and then over a period of approximately 18 months (as road space booking allowed for the lane closures) National Highways staff and our contractors carried out the following actions:”

Source location

Response from National Highways Limited
Page 2 · response
Published 19 December 2022

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Deliver the M20 Medway and Allington Deck Refurbishment scheme, including carriageway refurbishment and higher-grip, faster-draining Hot Rolled Asphalt surfacing.

Verbatim wording from the response

“The M20 Medway and Allington Deck Refurbishment scheme is due to be delivered between June and July 2023 at an estimated cost of £3 million.”

Source location

Response from National Highways Limited
Page 3 · response
Published 19 December 2022

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1