PFD report

Joseph Allison · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 23 Mar 2015•London (East)

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
5

Raised in this report

Recipients
2

Named on the report

Responses found
2

Of 2 recipients

Stated actions
9

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised5

  1. Failure to train in-house service engineers to recognise the Minivator 2000 defect
    Part of recurring concern: Failure to ensure lift engineers are competent to install and service lifts
  2. Unavailability of feeler gauges for the appropriate Minivator 2000 safety check
  3. Failure to adequately advise the stairlift industry of risks in unimproved Minivator 2000 stairlifts
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.7

  1. Action

    Remind manufacturing members to continue providing field-safety training until affected products are traced and necessary action is taken.

    Stated by British Healthcare Trades AssociationStated plannedThe respondent said that this action was planned when they made their response on 23 March 2015.
  2. Action

    Reiterate to manufacturers the need for written dealer agreements covering recalls and field-safety work, and for using industry channels to raise awareness.

    Stated by British Healthcare Trades AssociationStated plannedThe respondent said that this action was planned when they made their response on 23 March 2015.
  3. Action

    Raise the importance of sharing stairlift safety information with the BHTA and manufacturers through a scheduled meeting and written communication.

    Stated by Savaria Lifts (UK) LtdStated in progressThe respondent said that this action was in progress when they made their response on 23 March 2015.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.3

  1. Position

    Handicare's adjusted internal processes and ongoing engineer training are considered sufficient to ensure appropriate training.

    Stated by British Healthcare Trades AssociationExisting arrangements considered sufficientThe respondent said that existing arrangements were sufficient, so no further action was needed.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to train in-house service engineers to recognise the Minivator 2000 defect

Wider context from the report

“(1) In-house service engineers have not been specifically trained to be aware of the defect in the Minivator 2000, nor issued with feeler gauges to implement the appropriate safety check ”

Is this part of a recurring concern?

Yes — Failure to ensure lift engineers are competent to install and service lifts.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Unavailability of feeler gauges for the appropriate Minivator 2000 safety check

Wider context from the report

“(1) In-house service engineers have not been specifically trained to be aware of the defect in the Minivator 2000, nor issued with feeler gauges to implement the appropriate safety check ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to adequately advise the stairlift industry of risks in unimproved Minivator 2000 stairlifts

Wider context from the report

“(4) No or no adequate initiative has been taken to advise the stairlift industry generally of the risks inherent in unimproved Minivator 2000 stairlifts ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Exposure of service engineers to Minivator 2000 stairlift risks during test rides

Wider context from the report

“(2) In-house and third party service engineers are thereby exposed to the same risks which end-users face if they test-ride the serviced stairlifts themselves ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to undertake a nationally publicised safety recall campaign for end-users

Wider context from the report

“(3) No nationally publicised safety recall campaign has been undertaken to alert end-users to the danger, or request that such users contact the manufacturer for access to the remedial programme ”

Is this part of a recurring concern?

Yes — Unreliable product safety recall and remediation processes.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Remind manufacturing members to continue providing field-safety training until affected products are traced and necessary action is taken.

Verbatim wording from the response

“1 and 2 - we are satisfied that Handicare has adjusted internal process and training to ensure that appropriate training is provided to the in-house engineers on an ongoing basis. BHTA will remind all its manufacturing members that if training is necessary to address a field safety issue the training must continue to be provided until such time as all the products have been traced and the necessary action taken.”

Source location

2015-0103-Response-by-BHTA
Page 1 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Reiterate to manufacturers the need for written dealer agreements covering recalls and field-safety work, and for using industry channels to raise awareness.

Verbatim wording from the response

“4 The business did raise the matter at one of our meetings (minutes of which are distributed to all relevant members) and we have discussed how to improve notifications and co-operation throughout the supply chain. We will reiterate to manufacturers the need to have written agreement with their dealers setting out what will be expected of them in the event of a recall or the need for field safety work; and that they should make full use of ourselves and the publications read by businesses in the sector to raise awareness.”

Source location

2015-0103-Response-by-BHTA
Page 2 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Raise the importance of sharing stairlift safety information with the BHTA and manufacturers through a scheduled meeting and written communication.

Verbatim wording from the response

“As regards the topic of all manufacturers or all leading manufacturers sharing information on such issues within the sector generally, from our recollection, this was tabled by our representative at a meeting of the stairlift section of the BHTA once the original trunnion upgrade programme was initiated, to highlight the need to share safety information between companies. At the time some manufacturing members of the section were opposed to creating a formal system due to concerns about the requirement to share data or information which may be commercially confidential or commercially sensitive in its nature, and therefore this was rejected.”

Source location

2015-0103-Response-by-Handicare
Page 4 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Conduct a national newspaper advertising campaign warning end users about the defect and requesting contact for remedial access.

Verbatim wording from the response

“We will be conducting a national advertising campaign in the publications identified to us by external specialists as having the highest readership and best national coverage. This will run between Monday 15th June and Sunday 4th July. Adverts will run on various days in the following publications: The Sun (National), The Scottish Sun, the Daily Mail and the Mail on Sunday.”

Source location

2015-0103-Response-by-Handicare
Page 3 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Train service engineers to identify the defect, use feeler gauges for trunnion inspections, and check recall batch serial numbers, including through new-starter induction.

Verbatim wording from the response

“Handicare engineers have been made aware of the potential defect, issued with feeler gauges and have received a face to face briefing with regard to its use to carry out a trunnion inspection as detailed in Bulletin 66. The content of Bulletin 66 has also been issued to them.”

Source location

2015-0103-Response-by-Handicare
Page 2 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Publish a defect and remedial-action communication as an insert in THIIS magazine.

Verbatim wording from the response

“A communication covering similar ground will also be included as an insert, for ease of extraction and retention, in THIIS (stands for “The Homecare Industry Information Service”) magazine, the primary trade publication. This is planned for the July issue of this monthly magazine.”

Source location

2015-0103-Response-by-Handicare
Page 3 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Contact known dealers and additional mobility retailers about the defect, upgrade programme, and recall batch numbers, requesting reports of affected units found in the field.

Verbatim wording from the response

“We are contacting all dealers that have ordered stairlifts or spares since 2005 to raise awareness of the defect and upgrade programme. We are issuing the recall batch numbers with the request to contact us if they come across any of these units in the field.”

Source location

2015-0103-Response-by-Handicare
Page 3 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Handicare's adjusted internal processes and ongoing engineer training are considered sufficient to ensure appropriate training.

Verbatim wording from the response

“1 and 2 - we are satisfied that Handicare has adjusted internal process and training to ensure that appropriate training is provided to the in-house engineers on an ongoing basis. BHTA will remind all its manufacturing members that if training is necessary to address a field safety issue the training must continue to be provided until such time as all the products have been traced and the necessary action taken.”

Source location

2015-0103-Response-by-BHTA
Page 1 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The local team cannot confirm authority to add a public website section because the site is managed centrally and changes require consultation.

Verbatim wording from the response

“The Group function is also in the process of reviewing the viability of incorporating a section on the Handicare website, to be accessible by any visitor to the website, listing safety upgrades, including the Minivator 2000 trunnion upgrade. This site is managed by Handicare Group’s central marketing department not a local UK team”

Source location

2015-0103-Response-by-Handicare
Page 3 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Defect and remedial-action information was mailed to known trade customers, including independent installers and dealers within the identified network.

Verbatim wording from the response

“The second matter relates to the sentence appearing at paragraph 4(5) which reads:”

Source location

2015-0103-Response-by-Handicare
Page 2 · response
Published 23 March 2015

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.2

  1. 1

    Discuss improving recall notifications and cooperation throughout the supply chain at a member meeting, with minutes distributed to relevant members.

    Stated by British Healthcare Trades AssociationStated completedThe respondent said that this action was complete when they made their response on 23 March 2015.
  2. 2

    Mail local authorities to raise awareness of the recall where affected stairlifts may have been installed by third parties.

    Stated by Savaria Lifts (UK) LtdStated completedThe respondent said that this action was complete when they made their response on 23 March 2015.

Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.1

  1. 1

    The inaccurate upgrade records did not result from deliberate dishonesty or falsification by the company.

    Stated by Savaria Lifts (UK) LtdDisputes the concernThe respondent disagreed with part of the concern or the basis for it.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Discuss improving recall notifications and cooperation throughout the supply chain at a member meeting, with minutes distributed to relevant members.

Verbatim wording from the response

“4 The business did raise the matter at one of our meetings (minutes of which are distributed to all relevant members) and we have discussed how to improve notifications and co-operation throughout the supply chain. We will reiterate to manufacturers the need to have written agreement with their dealers setting out what will be expected of them in the event of a recall or the need for field safety work; and that they should make full use of ourselves and the publications read by businesses in the sector to raise awareness.”

Source location

2015-0103-Response-by-BHTA
Page 2 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Mail local authorities to raise awareness of the recall where affected stairlifts may have been installed by third parties.

Verbatim wording from the response

“We are also mailing all Local Authorities to raise awareness of this recall in case they have had an affected stairlift installed by a third party. First class mailing of these communications took place 11th and 12th June 2015.”

Source location

2015-0103-Response-by-Handicare
Page 3 · response
Published 23 March 2015

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The inaccurate upgrade records did not result from deliberate dishonesty or falsification by the company.

Verbatim wording from the response

“The first matter relates to paragraph 4(3) where it is respectfully submitted that the use of the following phrase has the potential to mislead:”

Source location

2015-0103-Response-by-Handicare
Page 1 · response
Published 23 March 2015

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
2/2