PFD report

JOHN HENRY OATES known as HARRY OATES · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 18 Dec 2025•Cumbria

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
5

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
9

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised5

  1. Low hanging lines resulting from phase-to-phase faults
  2. Manufacturing of porcelain tension disc insulators failing to prevent voids in cement fill
  3. Porcelain tension disc insulators with asymmetrical pins increasing internal stresses
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.4

  1. Action

    Review relevant ENA SHE standards in light of information shared from the incident.

    Stated by Electricity Networks AssociationStated plannedThe respondent said that this action was planned when they made their response on 5 January 2026.
  2. Action

    Develop an Engineering Technical Report documenting asset failure evidence and relevant emerging failure mechanisms for member-company risk assessment.

    Stated by Electricity Networks AssociationStated plannedThe respondent said that this action was planned when they made their response on 5 January 2026.
  3. Action

    Continue promoting engineering-standard improvements and awareness of innovative monitoring and detection technologies.

    Stated by Electricity Networks AssociationStated in progressThe respondent said that this action was in progress when they made their response on 5 January 2026.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.1

  1. Position

    Member companies are responsible for reviewing their public safety risk assessments and determining proportionate interventions or investment actions.

    Stated by Electricity Networks AssociationRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Low hanging lines resulting from phase-to-phase faults

Wider context from the report

“5. A phase-to-phase fault can lead to a low hanging line. This was not known prior to Harry’s death. 6. There will be locations across the UK which have the combination of porcelain tension disc insulators situated above equipment (such as an ASL) on which a conductor could be suspended in the event of disc failure. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Manufacturing of porcelain tension disc insulators failing to prevent voids in cement fill

Wider context from the report

“1. The cement fill within the porcelain tension disc insulators was found to contain voids in 73% of the insulators tested. These voids were introduced during the manufacturing process. The industry was unaware of these voids until discovered during ENWL’s investigation. Porcelain tension disc insulators are used widely throughout the electricity industry – and other industries. 2. Some of the discs tested were also found to have asymmetrical pins which increased the internal stresses on the insulators. 3. Either voids alone or in combination with an asymmetrical pin create a means by which electric current can pass across the voids and lead to failure of an insulator. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Porcelain tension disc insulators with asymmetrical pins increasing internal stresses

Wider context from the report

“1. The cement fill within the porcelain tension disc insulators was found to contain voids in 73% of the insulators tested. These voids were introduced during the manufacturing process. The industry was unaware of these voids until discovered during ENWL’s investigation. Porcelain tension disc insulators are used widely throughout the electricity industry – and other industries. 2. Some of the discs tested were also found to have asymmetrical pins which increased the internal stresses on the insulators. 3. Either voids alone or in combination with an asymmetrical pin create a means by which electric current can pass across the voids and lead to failure of an insulator. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Lack of automatic detection of low hanging lines

Wider context from the report

“7. Although at the time of the incident, there was no automatic means of detecting a low hanging line, technology now exists that can detect both these factors and which narrows the area in which the low hanging line is situated – Linesight. 8. It has also been determined that Linesight can detect that an insulator may be subject to internal stresses. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Locations with porcelain tension disc insulators above equipment where a conductor could be suspended after disc failure

Wider context from the report

“5. A phase-to-phase fault can lead to a low hanging line. This was not known prior to Harry’s death. 6. There will be locations across the UK which have the combination of porcelain tension disc insulators situated above equipment (such as an ASL) on which a conductor could be suspended in the event of disc failure. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Review relevant ENA SHE standards in light of information shared from the incident.

Verbatim wording from the response

“Objective 1: Review and improve where necessary, Safety, Health and Environment (SHE) industry standards and public safety risk assessment ENA and its members will:”

Source location

Response from Electricity Networks Association
Page 2 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Develop an Engineering Technical Report documenting asset failure evidence and relevant emerging failure mechanisms for member-company risk assessment.

Verbatim wording from the response

“- Develop an Engineering Technical Report (ETR) to collate and document engineering evidence on asset failure modes relevant to this incident, consolidating findings from SP ENW and concerns identified in your report, and incorporate learning from wider industry experiences. It will also capture and review other relevant or emerging failure mechanisms, providing a reference resource for ENA member companies.”

Source location

Response from Electricity Networks Association
Page 2 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue promoting engineering-standard improvements and awareness of innovative monitoring and detection technologies.

Verbatim wording from the response

“Broader objectives ENA will continue to promote improvements in engineering standards and raise awareness of available and emerging innovative monitoring and detection technologies, including those referenced in your report. ENA member companies will assess the effectiveness of these solutions and share current and emerging good”

Source location

Response from Electricity Networks Association
Page 2 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Develop supplementary guidance and risk-assessment criteria for automatically reclosed overhead lines with potentially low-hanging conductors.

Verbatim wording from the response

“- Develop supplementary guidance to address the risk relating to overhead lines that have automatically reclosed where a low hanging conductor may exist but has not been reported or been detected. The guidance will establish a risk assessment criteria for member companies to consider, informed by industry best known and available practices. This should inform and strengthen existing ways of working and support appropriate interventions such as risk-targeted inspections or patrols, asset location data, enhanced monitoring, and other appropriate or technical solutions to proportionately mitigate foreseeable risk.”

Source location

Response from Electricity Networks Association
Page 2 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Member companies are responsible for reviewing their public safety risk assessments and determining proportionate interventions or investment actions.

Verbatim wording from the response

“This additional guidance will support ENA member companies in reviewing and updating their own individual associated public safety risk assessments, which each company has committed to undertake and continue to review periodically.”

Source location

Response from Electricity Networks Association
Page 2 · response
Published 5 January 2026

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.5

  1. 1

    Convene member representatives to consider incident learning and determine improvements to existing arrangements.

    Stated by Electricity Networks AssociationStated completedThe respondent said that this action was complete when they made their response on 5 January 2026.
  2. 2

    Share essential incident elements with member companies through member forums.

    Stated by Electricity Networks AssociationStated completedThe respondent said that this action was complete when they made their response on 5 January 2026.
  3. 3

    Continue reviewing and updating ENA engineering and SHE documentation and general advice for newly identified or emerging failure mechanisms.

    Stated by Electricity Networks AssociationStated in progressThe respondent said that this action was in progress when they made their response on 5 January 2026.
  4. 4

    Oversee delivery of the safety standards, guidance and engineering evidence objectives by September 2026.

    Stated by Electricity Networks AssociationStated plannedThe respondent said that this action was planned when they made their response on 5 January 2026.
  5. 5

    Produce a summary briefing for members and share it with the Health and Safety Executive after completing the objectives.

    Stated by Electricity Networks AssociationStated plannedThe respondent said that this action was planned when they made their response on 5 January 2026.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Convene member representatives to consider incident learning and determine improvements to existing arrangements.

Verbatim wording from the response

“ENA has carefully considered the concerns set out in your Report to prevent future deaths and wishes to outline the actions being taken by ENA to reduce the likelihood of similar events occurring in the future. Following the immediate actions undertaken by Scottish Power Electricity North West (SP ENW) and items as referenced in your report, ENA has convened member company representatives to consider the learnings from this case and determine how existing arrangements can or should be improved.”

Source location

Response from Electricity Networks Association
Page 1 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Share essential incident elements with member companies through member forums.

Verbatim wording from the response

“I would like to take the opportunity to confirm that the essential elements related to the death of Mr Oates have already been shared with member companies through our member forums.”

Source location

Response from Electricity Networks Association
Page 1 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue reviewing and updating ENA engineering and SHE documentation and general advice for newly identified or emerging failure mechanisms.

Verbatim wording from the response

“ENA will also continue to review and, where necessary, update existing ENA Engineering, SHE documentation and general advice to reflect newly identified or emerging failure mechanisms.”

Source location

Response from Electricity Networks Association
Page 3 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Oversee delivery of the safety standards, guidance and engineering evidence objectives by September 2026.

Verbatim wording from the response

“ENA will oversee delivery of these objectives and ensure they are completed no later than September 2026.”

Source location

Response from Electricity Networks Association
Page 2 · response
Published 5 January 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Produce a summary briefing for members and share it with the Health and Safety Executive after completing the objectives.

Verbatim wording from the response

“I can confirm that once the above objectives as outlined are completed, ENA will produce a summary briefing for our members. The briefing will be shared with the Health and Safety Executive (HSE) to support the dialogue ENA and member companies have already started with them.”

Source location

Response from Electricity Networks Association
Page 3 · response
Published 5 January 2026

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026