PFD report

Myra Goldman · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 10 Nov 2014•Manchester North

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
2

Raised in this report

Recipients
4

Named on the report

Responses found
1

Of 4 recipients

Stated actions
2

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised2

  1. Failure to distribute gate weight between hinges
  2. Failure to use a proprietary method to prevent gate removal by lifting at the hinges
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.2

  1. Action

    Forwarded the coroner’s letter to the responsible standards committee for inclusion in its review of BS 1722-12:2006.

    Stated by British Standards InstitutionStated completedThe respondent said that this action was complete when they made their response on 10 November 2014.
  2. Action

    Asked the responsible standards committee chairman to consider accelerating the review of BS 1722-12:2006 in light of the safety concerns raised.

    Stated by British Standards InstitutionStated completedThe respondent said that this action was complete when they made their response on 10 November 2014.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to distribute gate weight between hinges

Wider context from the report

“The inversion of the upper hinge pin is not an uncommon practice and is intended to prevent a gate from being easily lifted off its hinges. BS 1722-12:2006 specification for steel palisade fences which states that ‘hinges shall be designed so that it is impossible to remove the gates by lifting at the hinges when they are in the shut and locked position’. The standard gives examples of hinge arrangements and does not specifically preclude this method. In the opinion of HM Specialist Inspector (Mechanical Engineering) of the Health & Safety Executive who gave evidence at the Inquest ‘the common sense approach is to spread the load’ between hinges by orientating them the same way rather than putting the significant majority of the weight of the gate onto one hinge only and ‘to prevent the gate from being easily lifted off, a proprietary method should be used such as double – lug hinge or anti-theft collars or split pins’. The preference of HM Specialist Inspector was for the standard to be ‘changed’. Any change can only be considered / implemented at a review meeting of the British Standards Institute. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to use a proprietary method to prevent gate removal by lifting at the hinges

Wider context from the report

“The inversion of the upper hinge pin is not an uncommon practice and is intended to prevent a gate from being easily lifted off its hinges. BS 1722-12:2006 specification for steel palisade fences which states that ‘hinges shall be designed so that it is impossible to remove the gates by lifting at the hinges when they are in the shut and locked position’. The standard gives examples of hinge arrangements and does not specifically preclude this method. In the opinion of HM Specialist Inspector (Mechanical Engineering) of the Health & Safety Executive who gave evidence at the Inquest ‘the common sense approach is to spread the load’ between hinges by orientating them the same way rather than putting the significant majority of the weight of the gate onto one hinge only and ‘to prevent the gate from being easily lifted off, a proprietary method should be used such as double – lug hinge or anti-theft collars or split pins’. The preference of HM Specialist Inspector was for the standard to be ‘changed’. Any change can only be considered / implemented at a review meeting of the British Standards Institute. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Forwarded the coroner’s letter to the responsible standards committee for inclusion in its review of BS 1722-12:2006.

Verbatim wording from the response

“In this case, the committee of BS 1722-12:2006 recently accepted a proposal to review this Standard and the reviewed Standard is expected to be published in 2016. I have forwarded your letter to the chairman of the standing committee responsible for BS 1722-12:2006 to be included as part of their review. I have also asked the chairman to consider whether the proposed review of this Standard may be accelerated in light of the concerns you have raised.”

Source location

2014-0490-Response-by-BSI
Page 1 · response
Published 10 November 2014

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Asked the responsible standards committee chairman to consider accelerating the review of BS 1722-12:2006 in light of the safety concerns raised.

Verbatim wording from the response

“In this case, the committee of BS 1722-12:2006 recently accepted a proposal to review this Standard and the reviewed Standard is expected to be published in 2016. I have forwarded your letter to the chairman of the standing committee responsible for BS 1722-12:2006 to be included as part of their review. I have also asked the chairman to consider whether the proposed review of this Standard may be accelerated in light of the concerns you have raised.”

Source location

2014-0490-Response-by-BSI
Page 1 · response
Published 10 November 2014

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.1

  1. 1

    The responsible standing committee, rather than the standards administrator, decides reviews and modifications to BS 1722-12:2006.

    Stated by British Standards InstitutionRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The responsible standing committee, rather than the standards administrator, decides reviews and modifications to BS 1722-12:2006.

Verbatim wording from the response

“A British Standard is a collective work created by a committee of interested parties, such as manufacturers, government departments, trade associations, consumers and research bodies. BSI administers the functions of the committee in its development of a Standard, but the committee is responsible for reviews of and modifications to the Standard. A Standard is maintained by a standing committee and every Standard is reviewed at least once every 5 years.”

Source location

2014-0490-Response-by-BSI
Page 1 · response
Published 10 November 2014

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/4

Data last updated 7 September 2026