PFD report

June Russell · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 17 Apr 2019•Berkshire

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
3

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
5

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised3

  1. Unsafe layout or line of sight on the approach to the junction
    Part of recurring concern: Inadequate road sight distance for drivers to identify hazards safelyPart of recurring concern: Inadequate safety controls at high-risk road junctionsPart of recurring concern: Inadequate visibility for road users at hazardous junctions
  2. Inadequate signs at and before the junction
    Part of recurring concern: Inadequate safety controls at high-risk road junctions
  3. Injury collision rate at the junction
    Part of recurring concern: Inadequate control of recurring collision risks at hazardous road locationsPart of recurring concern: Inadequate safety controls at high-risk road junctions
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.4

  1. Action

    Complete an independent junction safety review, including collision-data assessment, and provide a report with proposals for further improvements.

    Stated by Slough Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 14 June 2019.
  2. Action

    Separate the secondary traffic signal heads and add guidance markings to direct drivers safely through the junction.

    Stated by Slough Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 14 June 2019.
  3. Action

    Refresh the approach road markings and renew the yellow box junction marking.

    Stated by Slough Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 14 June 2019.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Unsafe layout or line of sight on the approach to the junction

Wider context from the report

“I consider that Slough Borough Council should take action to address the injury collision rate at this junction. Some work is ongoing, but this has been the case for over a year. This consideration should include: (a) Improvements to the signs at and before this junction. (b) Primary and secondary traffic light heads. (c) Layout and line of sight on the approach to this junction from the B470 High Street Langley. (d) It was not clear during the evidence whether the traffic lights in question are LED lights, which may assist in this respect as well. ”

Is this part of a recurring concern?

Yes — Inadequate road sight distance for drivers to identify hazards safely; Inadequate safety controls at high-risk road junctions; Inadequate visibility for road users at hazardous junctions.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Inadequate signs at and before the junction

Wider context from the report

“I consider that Slough Borough Council should take action to address the injury collision rate at this junction. Some work is ongoing, but this has been the case for over a year. This consideration should include: (a) Improvements to the signs at and before this junction. (b) Primary and secondary traffic light heads. (c) Layout and line of sight on the approach to this junction from the B470 High Street Langley. (d) It was not clear during the evidence whether the traffic lights in question are LED lights, which may assist in this respect as well. ”

Is this part of a recurring concern?

Yes — Inadequate safety controls at high-risk road junctions.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Injury collision rate at the junction

Wider context from the report

“I consider that Slough Borough Council should take action to address the injury collision rate at this junction. Some work is ongoing, but this has been the case for over a year. This consideration should include: (a) Improvements to the signs at and before this junction. (b) Primary and secondary traffic light heads. (c) Layout and line of sight on the approach to this junction from the B470 High Street Langley. (d) It was not clear during the evidence whether the traffic lights in question are LED lights, which may assist in this respect as well. ”

Is this part of a recurring concern?

Yes — Inadequate control of recurring collision risks at hazardous road locations; Inadequate safety controls at high-risk road junctions.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Complete an independent junction safety review, including collision-data assessment, and provide a report with proposals for further improvements.

Verbatim wording from the response

“Immediately after the Inquest which took place on 2nd April 2019, the Service Lead for Major Infrastructure Projects at the Council commissioned an independent road safety engineer to carry out a full review of this junction in conjunction with a traffic signal engineer. Those professionals met on 29th May 2019 to discuss preliminary findings. Once the review has been fully carried out, including a detailed assessment of collision data, a detailed report will be provided with full proposals for any further improvements. It is envisaged that this report will be provided within approximately 6-8 weeks, following which recommendations for further action will be put forward for implementation. The report will identify options for the short, medium and long term, to address the road safety collisions at this junction.”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 1 · response
Published 14 June 2019

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Separate the secondary traffic signal heads and add guidance markings to direct drivers safely through the junction.

Verbatim wording from the response

“(ii) Primary and secondary traffic light heads”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 2 · response
Published 14 June 2019

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Refresh the approach road markings and renew the yellow box junction marking.

Verbatim wording from the response

“SBC also carried out a full refreshing of the road markings from December 2017 to May 2018. The road markings on the approach to the junction from High St, Langley were all refreshed and the yellow box junction marking was also refreshed and made new over this timescale.”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 2 · response
Published 14 June 2019

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Complete the programme of junction sign improvements at and before the junction.

Verbatim wording from the response

“(i) Improvements to signs at and before this junction”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 1 · response
Published 14 June 2019

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.1

  1. 1

    Upgrade sections of the corridor leading to the junction with the M4 through the planned programme of works.

    Stated by Slough Borough CouncilStated plannedThe respondent said that this action was planned when they made their response on 14 June 2019.

Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.2

  1. 1

    Wholesale replacement of signal heads, cabling and the controller with LED is not warranted given its considerable cost and limited safety benefit.

    Stated by Slough Borough CouncilNo action considered necessaryThe respondent said that no further action was needed.
  2. 2

    Converting halogen traffic signals to LED is not considered a road-safety improvement.

    Stated by Slough Borough CouncilDisputes the concernThe respondent disagreed with part of the concern or the basis for it.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Upgrade sections of the corridor leading to the junction with the M4 through the planned programme of works.

Verbatim wording from the response

“At this point in time, it is not possible to speculate on what improvements to the layout and line of sight can be introduced and therefore this point will be reviewed in line with the road safety report recommendations. There is a much larger programme of works already planned for this financial year where action will be taken to upgrade sections along this corridor which lead to the junction with the M4.”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 2 · response
Published 14 June 2019

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Wholesale replacement of signal heads, cabling and the controller with LED is not warranted given its considerable cost and limited safety benefit.

Verbatim wording from the response

“It has been established that the traffic lights at this junction are not LED but halogen light based. The change to LED is not considered a road safety improvement and where other junctions in the town have been upgraded this has been to reduce maintenance risks for traffic signal contractors. In terms of road safety, drivers are legally obliged to adhere to the phasing of traffic lights which they must always do whether the lights are LED or halogen based and it is considered that for the considerable cost of replacing all signal heads, cabling and the controller, there is not a significant enough difference between the two to warrant a wholesale change from one to the other at this junction.”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 2 · response
Published 14 June 2019

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Converting halogen traffic signals to LED is not considered a road-safety improvement.

Verbatim wording from the response

“It has been established that the traffic lights at this junction are not LED but halogen light based. The change to LED is not considered a road safety improvement and where other junctions in the town have been upgraded this has been to reduce maintenance risks for traffic signal contractors. In terms of road safety, drivers are legally obliged to adhere to the phasing of traffic lights which they must always do whether the lights are LED or halogen based and it is considered that for the considerable cost of replacing all signal heads, cabling and the controller, there is not a significant enough difference between the two to warrant a wholesale change from one to the other at this junction.”

Source location

2019-0128-Response-by-Slough-Borough-Council
Page 2 · response
Published 14 June 2019

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026