First report 22 Jun 2022•Latest report 22 Jun 2022
Reports, concerns and published responses
Reports over time
Reports naming this recipient by issue year.
* 2026 is projected from reports observed to 7 Sep 2026.
Reports
1
Naming this recipient
Published responses
100%
Found for named reports
Concerns addressed
3
Across all linked responses
Stated actions
6
Described in responses
Concerns and recipient responses
Statements from Thames Water Utilities Limited linked to the concerns in each report. Select any concern, action or position to view the source wording.
North London
Concerns raised4
Lack of lighting beside the stream and railway fence
Lack of signs identifying the stream, its depth and warnings of danger
Lack of signs assisting with locating a way out from the venue grounds
Inadequate fencing preventing ingress to the railway track
Actions described in response An action is something this recipient says it has done, is doing, or plans to do in response to the concern raised.2
Action
Investigate options to improve the path and bank at location 5, including assessing lighting levels.
Action
Install New River Path warning signage beside the location 1 kissing gate.
Respondent positions A position is what this recipient says about the concern when it does not describe a specific action.1
Position
Lighting on venue grounds is Alexandra Palace’s responsibility, while railway fencing is Network Rail’s responsibility.
Redirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.