PFD report

Helen Patching and 2 others · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 9 Feb 2026•South Wales Central

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
4

Raised in this report

Recipients
5

Named on the report

Responses found
5

Of 5 recipients

Stated actions
29

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised4

  1. Failure to provide information enabling walkers to understand official routes, path closures and risks
    Part of recurring concern: Unreliable guidance and closure controls for unsafe pedestrian paths
  2. Inadequate signage addressing the risk of accidental falling
  3. Poor or non-existent mobile telephone signal in remote areas
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.20

  1. Action

    Progress procurement of the new Visitor Hub, designed to provide visitor information and safety guidance.

    Stated by Neath Port Talbot County Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.
  2. Action

    Publish and maintain revised Waterfall Country website warnings about water-related risks and safe behaviour.

    Stated by Neath Port Talbot County Borough CouncilStated completedThe respondent said that this action was complete when they made their response on 13 February 2026.
  3. Action

    Install waymarkers identifying a location with cross-network emergency signal for 999 calls, including its location name and What3Words reference.

    Stated by Natural Resources WalesStated plannedThe respondent said that this action was planned when they made their response on 13 February 2026.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.8

  1. Position

    Accident rates in Waterfall Country are broadly comparable with similar activities, and visitors are not at particularly higher likelihood of accidents.

    Stated by Natural Resources WalesDisputes the concernThe respondent disagreed with part of the concern or the basis for it.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to provide information enabling walkers to understand official routes, path closures and risks

Wider context from the report

“(2) A previous Prevention of Future Death report has led to the erection of signage concerning the risk of drowning in the water itself. However, the current signage provision does not adequately address the significant additional risk of accidental falling. Many walkers fail to understand the official routes, closed and open paths and the significant risks they face; ”

Is this part of a recurring concern?

Yes — Unreliable guidance and closure controls for unsafe pedestrian paths.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Inadequate signage addressing the risk of accidental falling

Wider context from the report

“(2) A previous Prevention of Future Death report has led to the erection of signage concerning the risk of drowning in the water itself. However, the current signage provision does not adequately address the significant additional risk of accidental falling. Many walkers fail to understand the official routes, closed and open paths and the significant risks they face; ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Poor or non-existent mobile telephone signal in remote areas

Wider context from the report

“(4) Mobile telephone signal is poor to non-existent in certain more remote areas, which creates delay in alerting emergency services when accidents do occur. ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

High rate of trips and slips in Waterfall Country

Wider context from the report

“(1) There is a high rate of accidents, including some fatal accidents, from trips and slips in the area known as Waterfall Country; ”

Is this part of a recurring concern?

No recurring-concern membership is currently published.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Progress procurement of the new Visitor Hub, designed to provide visitor information and safety guidance.

Verbatim wording from the response

“7. The new Visitor Hub is currently subject to an active procurement process however is designed to manage visitor activity more effectively and reduce pressure on the local community within Waterfall Country. Amongst other benefits to the local vicinity within Waterfall Country, it will provide clear visitor information and safety guidance, promoting responsible behaviour and safe enjoyment of the area.”

Source location

Response from Neath Port Talbot County Borough Council
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Publish and maintain revised Waterfall Country website warnings about water-related risks and safe behaviour.

Verbatim wording from the response

“5. Although there is no legal requirement to warn users of the PROW network of the risks of using the rights of way, we are taking steps to try to improve awareness of the risks, particularly surrounding the risks of entering the water.”

Source location

Response from Neath Port Talbot County Borough Council
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install waymarkers identifying a location with cross-network emergency signal for 999 calls, including its location name and What3Words reference.

Verbatim wording from the response

“Matter of Concern 3 - “mobile telephone signal is poor to non-existent in certain more remote areas, which creates delay in alerting emergency services when accidents do occur””

Source location

Response from Natural Resources Wales
Page 11 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Complete and operate the new Waterfall link path providing a circular route between Sgwd Clun Gwyn Isaf and the Four Falls Trail.

Verbatim wording from the response

“15.6.5 NRW has developed a new trail which by-passes the former Footpath 86. Contractors were appointed to undertake this work which commenced in January 2026 after being delayed by a number of months due to persistent inclement weather.”

Source location

Response from Natural Resources Wales
Page 8 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Resurface the Sgwd yr Eira trail to improve pedestrian and emergency-service access.

Verbatim wording from the response

“15.6 Recent works have been undertaken to upgrade some of the trails. By way of example:”

Source location

Response from Natural Resources Wales
Page 7 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Create a formal viewing area at Sgwd Clun Gwyn Uchaf with a balustrade, landscaped viewpoints and cliff-edge fencing.

Verbatim wording from the response

“15.7.3 NRW is planning the creation of a formal viewing area overlooking Sgwd Clun Gwyn Uchaf waterfall incorporating a balustrade, landscaped view points and fencing near to cliff edges. The purpose of the balustrade will be to facilitate safe viewing of the waterfall, the design of which will be to reduce the potential for climbing over the balustrade to get an even closer view of the waterfall. This work is due to be completed in 2026.”

Source location

Response from Natural Resources Wales
Page 9 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install permanent metal fencing to further prevent access to the closed former Footpath 86 area.

Verbatim wording from the response

“15.6.4 Former Footpath 86 was closed under legal order by BBNPA following a death in August 2022. It was extinguished on 1 February 2024, following a number of temporary closures since August 2022. Footpath 86 remains closed and there is no likelihood of this reopening due to the combination of cliff rock fall hazards and the exposed and deteriorating path edge. Barriers and signage make this clear. In addition, NRW have engaged a supplier to place permanent metal fences to seek to further prevent access to this area.”

Source location

Response from Natural Resources Wales
Page 8 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install a stone boardwalk between Sgwd yr Pannwr and Sgwd Isaf Clun Gwyn to improve safe access.

Verbatim wording from the response

“15.6.2 In July 2025, 120m of stone boardwalk was installed between Sgwd yr Pannwr and Sgwd Isaf Clun Gwyn replacing a timber walkway improving safe access between the two waterfalls (materials for this were flown in by helicopter in 210 lifts).”

Source location

Response from Natural Resources Wales
Page 8 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Conduct scheduled formal inspections of visitor infrastructure and managed car parks, reporting defects and taking required action.

Verbatim wording from the response

“15.8 NRW conducts scheduled formal recreation inspections of visitor infrastructure along promoted walking routes on Welsh Government Woodland Estate in Waterfall Country and NRW managed carparks. Defects identified are reported on and actions taken as required.”

Source location

Response from Natural Resources Wales
Page 9 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install fencing and safety signage along the Four Falls Trail and at the Sgwd Clun Gwyn Uchaf viewing area to deter hazardous access and warn of cliff edges and drops.

Verbatim wording from the response

“15.3 In September 2024, ‘Warning Cliff Edge’ signs were put in place at the Sgwd Clun Gwyn Uchaf viewing area. These were replaced in October 2025 with new NRW branded signs warning of cliff edge and sudden drops. Whilst there were no reported incidents of injuries in this location, there were reports of risky behaviour at the cliff edge hence the decision was taken to install the signage in this area.”

Source location

Response from Natural Resources Wales
Page 7 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Maintain consistent visitor communications by contributing to development of the Waterfall Country Partnership Communication Strategy.

Verbatim wording from the response

“15.4 Given the need to develop consistent messaging so that visitors can judge for themselves the risks and whether to accept them, NRW, BBNPA and Neath Port Talbot County Borough Council (“NPTCBC”) have sought the assistance of external communication specialists. BBNPA have subsequently been leading on this element of the Waterfall Country Project with NRW and NPTCBC heavily involved in contributing to developing a Waterfall Country Partnership Communication Strategy. This work is ongoing,”

Source location

Response from Natural Resources Wales
Page 7 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Contribute to implementing enhanced safety signage through the Waterfall Country safety working group.

Verbatim wording from the response

“Powys County Council is represented on the Waterfall Country safety working group and is contributing to ongoing efforts, including the implementation of enhanced safety signage during the current year.”

Source location

Response from Powys County Council
Page 3 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Improve waymarking to guide visitors toward locations with more reliable multi-network emergency signal coverage.

Verbatim wording from the response

“Responsibility for mobile network provision lies with telecommunication providers, however the Authority recognises the implications of limited coverage in emergency situations. In partnership with NRW, work is underway to improve waymarking to”

Source location

Response from Bannau Brycheiniog National Park
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Close and remove Footpath 86 from the Rights of Way network, with onsite measures notifying visitors of the closure.

Verbatim wording from the response

“Following continued erosion on the route of Footpath 86 in August 2022, the Authority took steps to close and remove the path from the Rights of Way network. This was completed on 1 February, 2024, through legal order and in line with relevant”

Source location

Response from Bannau Brycheiniog National Park
Page 2 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Support coordinated safety messaging and visitor management through the Waterfalls Area Safety Advisory Group.

Verbatim wording from the response

“Through the Waterfalls Area Safety Advisory Group, the Authority continues to work in partnership with NRW and other stakeholders to ensure a consistent and co-ordinated approach to safety messaging and visitor management. Additional signage has also been installed to clearly indicate permanent path closures and diversions.”

Source location

Response from Bannau Brycheiniog National Park
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Provide Rights of Way advice and oversight for pathway changes and progress formal adoption processes where required.

Verbatim wording from the response

“The Authority’s Rights of Way team is supporting NRW in relation to changes to pathways and will provide advice and oversight where required. Where pathways need to be formally adopted as legal Public Rights of Way, these will be progressed through those processes, as required, to ensure that new pathways are reflected on Ordnance Survey maps.”

Source location

Response from Bannau Brycheiniog National Park
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Hold regular multi-agency safety meetings, review accident feedback and coordinate preventative communications, signage and information.

Verbatim wording from the response

“The Authority, together with NRW and in conjunction with other stakeholders, including Mountain Rescue and the emergency services, undertake regular safety meetings, review feedback from accidents to consider future preventative action and align communications, signage and information. The Authority invests in the provision of wardens and visitor engagement staff at their car parks and those we manage for NRW, to provide face-to-face advice and guidance to visitors; this is funded through car park income but, also through the Authority’s core resources.”

Source location

Response from Bannau Brycheiniog National Park
Page 3 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Fund wardens and visitor engagement staff to provide face-to-face safety advice at managed car parks and visitor access points.

Verbatim wording from the response

“The Authority, together with NRW and in conjunction with other stakeholders, including Mountain Rescue and the emergency services, undertake regular safety meetings, review feedback from accidents to consider future preventative action and align communications, signage and information. The Authority invests in the provision of wardens and visitor engagement staff at their car parks and those we manage for NRW, to provide face-to-face advice and guidance to visitors; this is funded through car park income but, also through the Authority’s core resources.”

Source location

Response from Bannau Brycheiniog National Park
Page 3 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Provide accessible routes, wayfinding, maps and safety information for Waterfall Country visitors.

Verbatim wording from the response

“The Authority works in partnership with Natural Resources Wales, hereafter referred to as NRW, who are the principal landowner to provide more accessible routes (the red and green route) which have better surfaced pathways, way marking and safety information. Maps and signage are provided online, at the site and around the walk.”

Source location

Response from Bannau Brycheiniog National Park
Page 2 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Invest in signal-boosting measures and radios, and use the Airwave system to improve emergency communications for response teams.

Verbatim wording from the response

“The Authority continues to work with partners to explore further improvements as opportunities arise. Recently EE reception has become available in Ystradfellte for example. In the interim, the Authority has invested in signal-boosting measures and new radios to support the warden and visitor engagement teams. These have significantly improved communications, enabling first responders to contact emergency services sooner. The Authority continues to utilise the Airwave system with Mountain Rescue and the emergency services, supporting effective response times.”

Source location

Response from Bannau Brycheiniog National Park
Page 5 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Accident rates in Waterfall Country are broadly comparable with similar activities, and visitors are not at particularly higher likelihood of accidents.

Verbatim wording from the response

“Matter of Concern 1 - “There is a high rate of accidents including some fatal accidents, from trips and slips in the area known as Waterfall Country””

Source location

Response from Natural Resources Wales
Page 9 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Terrain, absent power and communications infrastructure make improving mobile signal or installing reliable SOS telephone boxes extremely challenging or impossible.

Verbatim wording from the response

“Matter of Concern 3 - “mobile telephone signal is poor to non-existent in certain more remote areas, which creates delay in alerting emergency services when accidents do occur””

Source location

Response from Natural Resources Wales
Page 11 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Responsibility for telecommunications infrastructure rests with national regulators and private network providers rather than NRW.

Verbatim wording from the response

“23. NRW recognises the concern around telecommunications coverage and understands the importance of reliable connectivity, particularly in emergency situations. While responsibility for telecommunications infrastructure does not sit with NRW and instead rests with bodies such as national regulators and private network providers, NRW has been working constructively with BBNRto identify practical steps it can take. As part of this, NRW will install a dedicated waymarker to highlight a location where cross-network emergency signal is available for 999 calls. This location will be clearly identified on waymarkers in the area, including a what.3.words (this is an application to identify the precise location) reference and the location name.”

Source location

Response from Natural Resources Wales
Page 11 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Official paths are waymarked, risks off those paths are considered obvious, and existing signage and safety measures address accidental-falling risks.

Verbatim wording from the response

“Matter of Concern 2 - “Current signage provision does not adequately address the significant additional risk of accidental falling. Many walkers fail to understand the official routes, closed and open paths and the significant risks they face””

Source location

Response from Natural Resources Wales
Page 11 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Legally diverted paths and barriers are considered sufficient to deter access to hazardous routes where original paths were diverted.

Verbatim wording from the response

“The public rights of way at the Waterfalls Country site at Ystradfellte are managed by the Bannau Brycheiniog National Park Authority under a formal delegation agreement. The paths have recently been legally diverted to align with managed routes, improving safe navigation for the public. Where original paths have been diverted, sufficient measures are in place to deter access to those routes where hazards exist, including the use of barriers.”

Source location

Response from Powys County Council
Page 2 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

The area’s inherent natural hazards cannot be removed without fundamentally altering its protected characteristics and designated habitats.

Verbatim wording from the response

“These features represent inherent natural hazards which cannot be removed without fundamentally altering the protected characteristics of the area and its designation as a Site of Special Scientific Interest (SSSI) and Special Area of Conservation (SAC) protected habitat.”

Source location

Response from Bannau Brycheiniog National Park
Page 2 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Responsibility for improving mobile network coverage lies with telecommunications providers, not the Authority.

Verbatim wording from the response

“Responsibility for mobile network provision lies with telecommunication providers, however the Authority recognises the implications of limited coverage in emergency situations. In partnership with NRW, work is underway to improve waymarking to”

Source location

Response from Bannau Brycheiniog National Park
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

BBNPA is responsible for managing and addressing safety matters concerning public rights of way and access land in the relevant area.

Verbatim wording from the response

“Bannau Brycheiniog National Park Authority (BBNPA) is the relevant access authority for open access land within the National Park, including those parts of RCT CBC’s administrative area that fall within the National Park boundary.”

Source location

Response from Rhondda Cynon Taf County Borough Council
Page 1 · response
Published 13 February 2026

Open published response

Other statements in published responses

These actions and other statements could not be clearly connected to one concern in this report.

Recipient-stated actions An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.9

  1. 1

    Continue collaborating with partner authorities on safety measures in Waterfall Country.

    Stated by Neath Port Talbot County Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.
  2. 2

    Develop and agree a Water Safety Policy during the current financial year.

    Stated by Neath Port Talbot County Borough CouncilStated plannedThe respondent said that this action was planned when they made their response on 13 February 2026.
  3. 3

    Continue collaborating with neighbouring authorities on signage and visitor information.

    Stated by Neath Port Talbot County Borough CouncilStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.
  4. 4

    Finalise and implement the Waterfall Country Visitor Safety Plan after incorporating the Tactical Operational Plan.

    Stated by Natural Resources WalesStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.
  5. 5

    Continue working with partner organisations to implement proportionate controls and identify further risk-reduction actions within the Council’s remit.

    Stated by Powys County CouncilStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.
  6. 6

    Maintain interpretive safety resources, including a waterfall model demonstrating hidden watercourse hazards and dangers.

    Stated by Bannau Brycheiniog National Park AuthorityStated completedThe respondent said that this action was complete when they made their response on 13 February 2026.
  7. 7

    Continue exploring accessible mechanisms for visitors to report safety concerns and site hazards.

    Stated by Bannau Brycheiniog National Park AuthorityStated plannedThe respondent said that this action was planned when they made their response on 13 February 2026.
  8. 8

    Develop a shared communications plan with partner organisations to improve visitors’ understanding of safety measures before arriving.

    Stated by Bannau Brycheiniog National Park AuthorityStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.
  9. 9

    Continue working with and supporting relevant agencies to implement proposed further safety actions.

    Stated by Rhondda Cynon Taf CBCStated in progressThe respondent said that this action was in progress when they made their response on 13 February 2026.

Recipient positions A position is what a recipient says about a concern when they do not describe a specific action.3

  1. 1

    Most recent fatalities involved drowning rather than falls, while rugged and unpredictable terrain means incidents may still occur despite mitigation.

    Stated by Natural Resources WalesDisputes the concernThe respondent disagreed with part of the concern or the basis for it.
  2. 2

    Site management and infrastructure responsibilities primarily lie with Natural Resources Wales and the Bannau Brycheiniog National Park Authority.

    Stated by Powys County CouncilRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.
  3. 3

    It is not physically practicable or legally possible to prevent visitors leaving designated paths on open access land.

    Stated by Powys County CouncilUnable to actThe respondent said that a constraint prevented them from taking the relevant action.

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue collaborating with partner authorities on safety measures in Waterfall Country.

Verbatim wording from the response

“We can confirm that we are liaising and will continue to support National Resources Wales (NRW), Bannau Brycheiniog National Park Authority (BBNPA),”

Source location

Response from Neath Port Talbot County Borough Council
Page 1 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Develop and agree a Water Safety Policy during the current financial year.

Verbatim wording from the response

“9. The Council is also committed to developing and agreeing Water Safety Policy this financial year as a direct response to the National Drowning Prevention Strategy. This will help to further strengthen the measures in place across the whole of NPT.”

Source location

Response from Neath Port Talbot County Borough Council
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue collaborating with neighbouring authorities on signage and visitor information.

Verbatim wording from the response

“8. Further, collaboration is ongoing with NRW, BBNPA and other neighbouring local authorities in relation to signage and visitor information.”

Source location

Response from Neath Port Talbot County Borough Council
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Finalise and implement the Waterfall Country Visitor Safety Plan after incorporating the Tactical Operational Plan.

Verbatim wording from the response

“15.1 In January 2025, a Waterfall Country Visitor Safety Subgroup was formed comprising members of the WASAG and the Waterfall Country Partnership to develop a Visitor Safety Plan (building on work undertaken by NRW previously). This subgroup was set up as a start and finish task group specifically for the development of a Visitor Safety Plan. The finalisation and implementation of this Plan is in the end stages, but presently on hold pending the inclusion of a Tactical Operational Plan (see point 15.2 below).”

Source location

Response from Natural Resources Wales
Page 6 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue working with partner organisations to implement proportionate controls and identify further risk-reduction actions within the Council’s remit.

Verbatim wording from the response

“The Council has engaged with partner organisations, and we continue to support the Bannau Brycheiniog National Park Authority and Natural Resources Wales, as landowner, in implementing proportionate and effective controls. We will continue to work with partners to identify any further proportionate actions within the Council’s remit.”

Source location

Response from Powys County Council
Page 3 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Maintain interpretive safety resources, including a waterfall model demonstrating hidden watercourse hazards and dangers.

Verbatim wording from the response

“The Authority maintains an active approach to communications and safety advice. This includes the use of interpretive resources, such as a physical waterfall model located at Cwm Porth car park, to demonstrate the hidden risks and dangers associated with entering watercourses, particularly strong and unseen currents associated with waterfalls.”

Source location

Response from Bannau Brycheiniog National Park
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue exploring accessible mechanisms for visitors to report safety concerns and site hazards.

Verbatim wording from the response

“The Authority will also continue to explore opportunities to improve mechanisms for visitors to report safety concerns and site issues. This includes consideration of accessible reporting methods at key locations, such as digital or on-site tools, to enable timely identification of hazards.”

Source location

Response from Bannau Brycheiniog National Park
Page 5 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Develop a shared communications plan with partner organisations to improve visitors’ understanding of safety measures before arriving.

Verbatim wording from the response

“The Authority is working jointly with Neath Port Talbot County Borough Council and NRW to establish a communications plan for Waterfalls County to ensure visitors are better prepared before reaching the site. In particular, the plan prioritises shared key messaging so that visitors understand how to stay safe in the area.”

Source location

Response from Bannau Brycheiniog National Park
Page 4 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Continue working with and supporting relevant agencies to implement proposed further safety actions.

Verbatim wording from the response

“Accordingly, BBNPA is the appropriate authority in respect of the management and liability of Public Rights of Way and access land within this area, including routes providing access to the waterfalls. We have been sighted on BBNPA’s response to your Regulation 28 report and are aware that it has been submitted to you. We request that response be regarded as reflecting the position of both BBNPA and RCT CBC in relation to your attached Regulation 28 report. RCT CBC will continue to work with, and support, BBNPA, Natural Resources Wales and other relevant agencies identified in BBNPA’s response to implement the further actions proposed within it.”

Source location

Response from Rhondda Cynon Taf County Borough Council
Page 1 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Most recent fatalities involved drowning rather than falls, while rugged and unpredictable terrain means incidents may still occur despite mitigation.

Verbatim wording from the response

“17. NRW’s records indicate that in this rugged and natural environment there has been eight fatalities in waterfall country in the last 5 years, these heartbreaking incidents have occurred in different circumstances with the majority of those occurring from drowning. NRW recognises that this Regulation 28 report to which we are responding was generated to address the risk of falls rather than the risk of drowning. Although measures can be and are taken to mitigate risk the hazardous and unpredictable nature of rugged terrain means that incidents of this kind may sadly still arise.”

Source location

Response from Natural Resources Wales
Page 10 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Site management and infrastructure responsibilities primarily lie with Natural Resources Wales and the Bannau Brycheiniog National Park Authority.

Verbatim wording from the response

“Our review recognises the multi-agency nature of the location and the associated responsibilities. The areas referenced are largely situated on land managed by Natural Resources Wales and/or within the Bannau Brycheiniog National Park Authority, and accordingly the Council has limited direct control over site management or infrastructure. Nevertheless, the Council recognises that effective risk mitigation requires a coordinated and collaborative approach between all relevant landowners and responsible bodies.”

Source location

Response from Powys County Council
Page 2 · response
Published 13 February 2026

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

It is not physically practicable or legally possible to prevent visitors leaving designated paths on open access land.

Verbatim wording from the response

“However, much of the site remains open access land within a naturally hazardous gorge, where it is not physically practicable or legally possible to prevent people from leaving designated paths. Whilst active management measures are in place to direct visitors along safer routes and discourage access to higher-risk areas, the nature of open access land means some visitors may choose to deviate from managed routes, and informal ‘desire lines’ may develop over time. These are kept under review, and further mitigation will be considered where reasonably practicable.”

Source location

Response from Powys County Council
Page 2 · response
Published 13 February 2026

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
5/5

Data last updated 7 September 2026