PFD report

Darryl Alfred Wayne Rego SOUZA · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 9 Apr 2018•Northamptonshire

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
2

Raised in this report

Recipients
1

Named on the report

Responses found
1

Of 1 recipient

Stated actions
3

Described in responses

Recipients and published responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised2

  1. Compromised visibility at the junction
    Part of recurring concern: Inadequate road sight distance for drivers to identify hazards safelyPart of recurring concern: Inadequate visibility for road users at hazardous junctions
  2. Failure to establish a timeframe for completion of junction safety improvements
    Part of recurring concern: Failure to establish effective plans to address identified safety concerns
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.3

  1. Action

    Convert both junction approaches from Give Way to Stop controls through an identical scheme.

    Stated by Northamptonshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 17 June 2018.
  2. Action

    Install yellow-backed warning signs and refresh road markings on the Sibbertoft approach.

    Stated by Northamptonshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 17 June 2018.
  3. Action

    Introduce inaudible transverse rumble strips before the junction mouth on the Sibbertoft approach.

    Stated by Northamptonshire County CouncilStated plannedThe respondent said that this action was planned when they made their response on 17 June 2018.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Compromised visibility at the junction

Wider context from the report

“1. Paragraphs 6.11 – 6.14 of the Forensic Collision Investigator’s report is set out below. 6.11 There is no doubt that the visibility at this junction is compromised by the road geography and as such high visibility “Give Way” signs and crossroads signs together with “SLOW” painted on the road surface serve to highlight the location of the crossroads and the need to take care. 6.12 In view if the visibility at this junction and after reviewing the Collision statistics at this junction there are to be some improvements carried out. 6.13 These improvements include renewing the signing particularly from the Sibbertoft direction and noise or rumble strips to be placed on the road again from the Sibbertoft direction. 6.14 At the time of writing this report, there is no time frame as to when these improvements will be completed. 2. Additionally, during evidence, the Collision Investigator recommended that the junction may benefit from the installation of “Stop” signs. 3. One of the witnesses at the inquest stated that there had been a further accident, at the same location, around one week before the resumed inquest date. ”

Is this part of a recurring concern?

Yes — Inadequate road sight distance for drivers to identify hazards safely; Inadequate visibility for road users at hazardous junctions.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to establish a timeframe for completion of junction safety improvements

Wider context from the report

“1. Paragraphs 6.11 – 6.14 of the Forensic Collision Investigator’s report is set out below. 6.11 There is no doubt that the visibility at this junction is compromised by the road geography and as such high visibility “Give Way” signs and crossroads signs together with “SLOW” painted on the road surface serve to highlight the location of the crossroads and the need to take care. 6.12 In view if the visibility at this junction and after reviewing the Collision statistics at this junction there are to be some improvements carried out. 6.13 These improvements include renewing the signing particularly from the Sibbertoft direction and noise or rumble strips to be placed on the road again from the Sibbertoft direction. 6.14 At the time of writing this report, there is no time frame as to when these improvements will be completed. 2. Additionally, during evidence, the Collision Investigator recommended that the junction may benefit from the installation of “Stop” signs. 3. One of the witnesses at the inquest stated that there had been a further accident, at the same location, around one week before the resumed inquest date. ”

Is this part of a recurring concern?

Yes — Failure to establish effective plans to address identified safety concerns.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Convert both junction approaches from Give Way to Stop controls through an identical scheme.

Verbatim wording from the response

“Taking account of the recommendation in your report for the junction to be regulated by ‘Stop’ signs rather than the current ‘Give Way’ controls, our engineering experts have revisited the location to investigate the feasibility of a re-grade. This type of measure is governed by national guidelines and generally confined to junctions where, in the main, visibility is severely hampered. Our experts measured an available view of 95 metres to the left from the junction mouth. This is on the margins of intervention levels but will consequently provide justification for conversion to a ‘Stop’ requirement. We will therefore include this modification in the scheme. Furthermore, the opposing junction is similar in nature and characteristic in terms of available views and the obvious requirement to exercise care.”

Source location

Response from Northamptonshire County Council
Page 2 · response
Published 17 June 2018

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Install yellow-backed warning signs and refresh road markings on the Sibbertoft approach.

Verbatim wording from the response

“Soon after the incident our engineering experts attended this particular location and carried out a study of the minor road approach from Sibbertoft (from where Mr Souza emerged just prior to the collision). The current ‘Give Way’ road markings and signage are of regulatory standard. However, a scheme involving the implementation of ‘yellow backed’ signs and refreshed lines is now planned in order to provide an enhanced reminder for inattentive motorists to emphasise the presence of the crossroads and to approach with caution. In order to supplement the signage we will also be introducing a sequence of ‘rumble strips’ in advance of the junction mouth.”

Source location

Response from Northamptonshire County Council
Page 2 · response
Published 17 June 2018

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Introduce inaudible transverse rumble strips before the junction mouth on the Sibbertoft approach.

Verbatim wording from the response

“Soon after the incident our engineering experts attended this particular location and carried out a study of the minor road approach from Sibbertoft (from where Mr Souza emerged just prior to the collision). The current ‘Give Way’ road markings and signage are of regulatory standard. However, a scheme involving the implementation of ‘yellow backed’ signs and refreshed lines is now planned in order to provide an enhanced reminder for inattentive motorists to emphasise the presence of the crossroads and to approach with caution. In order to supplement the signage we will also be introducing a sequence of ‘rumble strips’ in advance of the junction mouth.”

Source location

Response from Northamptonshire County Council
Page 2 · response
Published 17 June 2018

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/1

Data last updated 7 September 2026